水苏涧大桥设计及其钢接缝疲劳性能评估

ce/papers Pub Date : 2024-09-11 DOI:10.1002/cepa.3085
Zhihua Xiong, Xin Yang, Xuyao Liu, Jiaqi Li
{"title":"水苏涧大桥设计及其钢接缝疲劳性能评估","authors":"Zhihua Xiong,&nbsp;Xin Yang,&nbsp;Xuyao Liu,&nbsp;Jiaqi Li","doi":"10.1002/cepa.3085","DOIUrl":null,"url":null,"abstract":"<p>Shui Su Ravine Bridge is built in Bai Shui County in Shaanxi Province, which is a part of the highway linking Heyang and Tongchuan. The bridge has been designed as a composite steel-concrete truss bridge with 3 spans in total of 240 meters and a deck of 4 lanes. To meet the harsh environmental demand and lessen the future maintenance, the solution adopts the weathering steel Q420qENH similar strength as S420NL in European code. The bridge is erected by incremental launching and post-installation of the pre-cast concrete slab. Since the truss segment is all welded, two-step models have been developed to evaluate the fatigue performance of the steel truss joint. In the simplified two-dimensional model, Phase-Field (PF) approach has been implemented to make a full fatigue evaluation of crack propagation in the truss.</p>","PeriodicalId":100223,"journal":{"name":"ce/papers","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2024-09-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Shui Su Ravine Bridge Design and its Steel Joint Fatigue Performance Evaluation\",\"authors\":\"Zhihua Xiong,&nbsp;Xin Yang,&nbsp;Xuyao Liu,&nbsp;Jiaqi Li\",\"doi\":\"10.1002/cepa.3085\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<p>Shui Su Ravine Bridge is built in Bai Shui County in Shaanxi Province, which is a part of the highway linking Heyang and Tongchuan. The bridge has been designed as a composite steel-concrete truss bridge with 3 spans in total of 240 meters and a deck of 4 lanes. To meet the harsh environmental demand and lessen the future maintenance, the solution adopts the weathering steel Q420qENH similar strength as S420NL in European code. The bridge is erected by incremental launching and post-installation of the pre-cast concrete slab. Since the truss segment is all welded, two-step models have been developed to evaluate the fatigue performance of the steel truss joint. In the simplified two-dimensional model, Phase-Field (PF) approach has been implemented to make a full fatigue evaluation of crack propagation in the truss.</p>\",\"PeriodicalId\":100223,\"journal\":{\"name\":\"ce/papers\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-09-11\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"ce/papers\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://onlinelibrary.wiley.com/doi/10.1002/cepa.3085\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"ce/papers","FirstCategoryId":"1085","ListUrlMain":"https://onlinelibrary.wiley.com/doi/10.1002/cepa.3085","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

水苏涧大桥位于陕西省白水县,是连接合阳和铜川的高速公路的一部分。该桥设计为钢-混凝土组合桁架桥,共 3 跨 240 米,桥面为 4 车道。为满足苛刻的环境要求并减少日后的维护,该方案采用了与欧洲规范中 S420NL 强度相近的耐候钢 Q420qENH。桥梁的架设采用增量式下水和预制混凝土板后安装的方式。由于桁架部分全部采用焊接,因此开发了两步模型来评估钢桁架连接处的疲劳性能。在简化的二维模型中,采用了相场(PF)方法对桁架中的裂纹扩展进行全面的疲劳评估。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Shui Su Ravine Bridge Design and its Steel Joint Fatigue Performance Evaluation

Shui Su Ravine Bridge is built in Bai Shui County in Shaanxi Province, which is a part of the highway linking Heyang and Tongchuan. The bridge has been designed as a composite steel-concrete truss bridge with 3 spans in total of 240 meters and a deck of 4 lanes. To meet the harsh environmental demand and lessen the future maintenance, the solution adopts the weathering steel Q420qENH similar strength as S420NL in European code. The bridge is erected by incremental launching and post-installation of the pre-cast concrete slab. Since the truss segment is all welded, two-step models have been developed to evaluate the fatigue performance of the steel truss joint. In the simplified two-dimensional model, Phase-Field (PF) approach has been implemented to make a full fatigue evaluation of crack propagation in the truss.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信