{"title":"设计成熟:首座聚变发电站成熟过程中的挑战。","authors":"Debbie Kempton, Chris Waldon","doi":"10.1098/rsta.2023.0412","DOIUrl":null,"url":null,"abstract":"<p><p>The design, delivery and operation of a large-scale infrastructure project are challenging at best. For the Spherical Tokamak for Energy Production (STEP) prototype powerplant (SPP), the challenges increased dramatically. In addition to being a large-scale infrastructure project, it is a cutting edge, first of a kind (FOAK) technology demonstrator. The design teams are working in a volatile, uncertain, complex and ambiguous environment, where technology is constantly emerging, maturing and changing. STEP will be unlike any power plant ever built and requires the development of new technologies and capabilities, but also a novel approach to planning and maturing the design. By taking a holistic view of the engineering life cycle from the start, the programme will be better positioned to achieve an SPP that is fit for purpose and can be used to show a path to ultimate commercial viability for subsequent power plants. This paper will review the key challenges in maturing a FOAK fusion power plant and look in depth at how the STEP team are maturing the required capabilities and planning to ensure successful delivery of the SPP. This article is part of the theme issue 'Delivering Fusion Energy - The Spherical Tokamak for Energy Production (STEP)'.</p>","PeriodicalId":19879,"journal":{"name":"Philosophical Transactions of the Royal Society A: Mathematical, Physical and Engineering Sciences","volume":"382 2280","pages":"20230412"},"PeriodicalIF":4.3000,"publicationDate":"2024-10-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://www.ncbi.nlm.nih.gov/pmc/articles/PMC11423681/pdf/","citationCount":"0","resultStr":"{\"title\":\"Maturing the design: challenges in maturing a first of a kind fusion power plant.\",\"authors\":\"Debbie Kempton, Chris Waldon\",\"doi\":\"10.1098/rsta.2023.0412\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<p><p>The design, delivery and operation of a large-scale infrastructure project are challenging at best. For the Spherical Tokamak for Energy Production (STEP) prototype powerplant (SPP), the challenges increased dramatically. In addition to being a large-scale infrastructure project, it is a cutting edge, first of a kind (FOAK) technology demonstrator. The design teams are working in a volatile, uncertain, complex and ambiguous environment, where technology is constantly emerging, maturing and changing. STEP will be unlike any power plant ever built and requires the development of new technologies and capabilities, but also a novel approach to planning and maturing the design. By taking a holistic view of the engineering life cycle from the start, the programme will be better positioned to achieve an SPP that is fit for purpose and can be used to show a path to ultimate commercial viability for subsequent power plants. This paper will review the key challenges in maturing a FOAK fusion power plant and look in depth at how the STEP team are maturing the required capabilities and planning to ensure successful delivery of the SPP. This article is part of the theme issue 'Delivering Fusion Energy - The Spherical Tokamak for Energy Production (STEP)'.</p>\",\"PeriodicalId\":19879,\"journal\":{\"name\":\"Philosophical Transactions of the Royal Society A: Mathematical, Physical and Engineering Sciences\",\"volume\":\"382 2280\",\"pages\":\"20230412\"},\"PeriodicalIF\":4.3000,\"publicationDate\":\"2024-10-09\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://www.ncbi.nlm.nih.gov/pmc/articles/PMC11423681/pdf/\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Philosophical Transactions of the Royal Society A: Mathematical, Physical and Engineering Sciences\",\"FirstCategoryId\":\"103\",\"ListUrlMain\":\"https://doi.org/10.1098/rsta.2023.0412\",\"RegionNum\":3,\"RegionCategory\":\"综合性期刊\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"2024/8/26 0:00:00\",\"PubModel\":\"Epub\",\"JCR\":\"Q1\",\"JCRName\":\"MULTIDISCIPLINARY SCIENCES\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Philosophical Transactions of the Royal Society A: Mathematical, Physical and Engineering Sciences","FirstCategoryId":"103","ListUrlMain":"https://doi.org/10.1098/rsta.2023.0412","RegionNum":3,"RegionCategory":"综合性期刊","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"2024/8/26 0:00:00","PubModel":"Epub","JCR":"Q1","JCRName":"MULTIDISCIPLINARY SCIENCES","Score":null,"Total":0}
引用次数: 0

摘要

大型基础设施项目的设计、交付和运营充其量也就是个挑战。对于球形托卡马克能源生产(STEP)原型发电厂(SPP)来说,挑战大大增加。除了是一个大型基础设施项目外,它还是一个尖端的首创(FOAK)技术示范项目。设计团队在一个动荡、不确定、复杂和模糊的环境中工作,技术不断涌现、成熟和变化。STEP 发电站与以往任何发电站都不同,不仅需要开发新的技术和能力,还需要采用新颖的方法来规划和完善设计。通过从一开始就对工程生命周期进行全面考虑,该计划将能够更好地实现 SPP 的目标,并为后续电厂的最终商业可行性指明方向。本文将回顾 FOAK 核聚变电站成熟过程中面临的主要挑战,并深入探讨 STEP 团队如何成熟所需的能力和规划,以确保 SPP 的成功交付。本文是 "交付核聚变能源--球形托卡马克能源生产(STEP)"专题的一部分。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Maturing the design: challenges in maturing a first of a kind fusion power plant.

The design, delivery and operation of a large-scale infrastructure project are challenging at best. For the Spherical Tokamak for Energy Production (STEP) prototype powerplant (SPP), the challenges increased dramatically. In addition to being a large-scale infrastructure project, it is a cutting edge, first of a kind (FOAK) technology demonstrator. The design teams are working in a volatile, uncertain, complex and ambiguous environment, where technology is constantly emerging, maturing and changing. STEP will be unlike any power plant ever built and requires the development of new technologies and capabilities, but also a novel approach to planning and maturing the design. By taking a holistic view of the engineering life cycle from the start, the programme will be better positioned to achieve an SPP that is fit for purpose and can be used to show a path to ultimate commercial viability for subsequent power plants. This paper will review the key challenges in maturing a FOAK fusion power plant and look in depth at how the STEP team are maturing the required capabilities and planning to ensure successful delivery of the SPP. This article is part of the theme issue 'Delivering Fusion Energy - The Spherical Tokamak for Energy Production (STEP)'.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
9.30
自引率
2.00%
发文量
367
审稿时长
3 months
期刊介绍: Continuing its long history of influential scientific publishing, Philosophical Transactions A publishes high-quality theme issues on topics of current importance and general interest within the physical, mathematical and engineering sciences, guest-edited by leading authorities and comprising new research, reviews and opinions from prominent researchers.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信