{"title":"基于履约后记录改进传统最低价承包商选择的新型 A + Q 方法","authors":"Wen-Der Yu, Zhi-Lei Wang, Hsien-Kuan Chang, Tao-Ming Cheng","doi":"10.1007/s12205-024-0885-y","DOIUrl":null,"url":null,"abstract":"<p>The lowest bid (LB) procurement method is widely adopted because of its simplicity, objectivity, and limited human involvement in the contractor selection process. However, this method has been criticized for its pure price competition that does not consider performance differences between contractors. To address the aforementioned issue, this study introduces the A + Q method, which considers both the historical performance records and the Market Price Elasticity of Performance index of contractors, in order to evaluate bid prices in conjunction with contractor performance. The proposed method allows project owners to select high-performance contractors while affording the simplicity of traditional LB methods, as demonstrated through a case study and simulations on road construction procurement. Therefore, the systematic approach of the proposed method to LB procurement can enable a healthier construction procurement market to be realized in the long run.</p>","PeriodicalId":17897,"journal":{"name":"KSCE Journal of Civil Engineering","volume":"48 1","pages":""},"PeriodicalIF":1.9000,"publicationDate":"2024-07-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Novel A + Q Method for Improving Conventional Lowest Bid Contractor Selection Based on Post-performance Records\",\"authors\":\"Wen-Der Yu, Zhi-Lei Wang, Hsien-Kuan Chang, Tao-Ming Cheng\",\"doi\":\"10.1007/s12205-024-0885-y\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<p>The lowest bid (LB) procurement method is widely adopted because of its simplicity, objectivity, and limited human involvement in the contractor selection process. However, this method has been criticized for its pure price competition that does not consider performance differences between contractors. To address the aforementioned issue, this study introduces the A + Q method, which considers both the historical performance records and the Market Price Elasticity of Performance index of contractors, in order to evaluate bid prices in conjunction with contractor performance. The proposed method allows project owners to select high-performance contractors while affording the simplicity of traditional LB methods, as demonstrated through a case study and simulations on road construction procurement. Therefore, the systematic approach of the proposed method to LB procurement can enable a healthier construction procurement market to be realized in the long run.</p>\",\"PeriodicalId\":17897,\"journal\":{\"name\":\"KSCE Journal of Civil Engineering\",\"volume\":\"48 1\",\"pages\":\"\"},\"PeriodicalIF\":1.9000,\"publicationDate\":\"2024-07-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"KSCE Journal of Civil Engineering\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.1007/s12205-024-0885-y\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENGINEERING, CIVIL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"KSCE Journal of Civil Engineering","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1007/s12205-024-0885-y","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 0
摘要
最低出价(LB)采购法因其简单、客观和在承包商选择过程中人力参与有限而被广泛采用。然而,这种方法因其纯粹的价格竞争而受到批评,因为它没有考虑承包商之间的绩效差异。针对上述问题,本研究引入了 A + Q 方法,该方法同时考虑了承包商的历史业绩记录和市场价格弹性指数,以便结合承包商的业绩来评估投标价格。该方法既能让项目业主选择高绩效的承包商,又具有传统 LB 方法的简便性,并通过对公路建设采购的案例研究和模拟进行了验证。因此,从长远来看,拟议方法对雷同采购的系统化处理可实现更健康的建筑采购市场。
Novel A + Q Method for Improving Conventional Lowest Bid Contractor Selection Based on Post-performance Records
The lowest bid (LB) procurement method is widely adopted because of its simplicity, objectivity, and limited human involvement in the contractor selection process. However, this method has been criticized for its pure price competition that does not consider performance differences between contractors. To address the aforementioned issue, this study introduces the A + Q method, which considers both the historical performance records and the Market Price Elasticity of Performance index of contractors, in order to evaluate bid prices in conjunction with contractor performance. The proposed method allows project owners to select high-performance contractors while affording the simplicity of traditional LB methods, as demonstrated through a case study and simulations on road construction procurement. Therefore, the systematic approach of the proposed method to LB procurement can enable a healthier construction procurement market to be realized in the long run.
期刊介绍:
The KSCE Journal of Civil Engineering is a technical bimonthly journal of the Korean Society of Civil Engineers. The journal reports original study results (both academic and practical) on past practices and present information in all civil engineering fields.
The journal publishes original papers within the broad field of civil engineering, which includes, but are not limited to, the following: coastal and harbor engineering, construction management, environmental engineering, geotechnical engineering, highway engineering, hydraulic engineering, information technology, nuclear power engineering, railroad engineering, structural engineering, surveying and geo-spatial engineering, transportation engineering, tunnel engineering, and water resources and hydrologic engineering