{"title":"从场地勘察计划中学习桩基设计的成本效益决策分析方法","authors":"O. E. Oluwatuyi, S. Wulff, Kam W. Ng","doi":"10.1080/17499518.2024.2379951","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":508895,"journal":{"name":"Georisk: Assessment and Management of Risk for Engineered Systems and Geohazards","volume":" 29","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-07-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Learning approaches to cost–benefit decision analysis of pile designs from site investigation plans\",\"authors\":\"O. E. Oluwatuyi, S. Wulff, Kam W. Ng\",\"doi\":\"10.1080/17499518.2024.2379951\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":508895,\"journal\":{\"name\":\"Georisk: Assessment and Management of Risk for Engineered Systems and Geohazards\",\"volume\":\" 29\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-07-17\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Georisk: Assessment and Management of Risk for Engineered Systems and Geohazards\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1080/17499518.2024.2379951\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Georisk: Assessment and Management of Risk for Engineered Systems and Geohazards","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/17499518.2024.2379951","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}