加纳公共建筑项目缺陷责任期的适当性

IF 2.1 Q2 CONSTRUCTION & BUILDING TECHNOLOGY
Collins Ameyaw, Sarfo Mensah, Blondel Akun Abaitey, Anita Asamoah-Duodu
{"title":"加纳公共建筑项目缺陷责任期的适当性","authors":"Collins Ameyaw, Sarfo Mensah, Blondel Akun Abaitey, Anita Asamoah-Duodu","doi":"10.1108/ijbpa-04-2024-0081","DOIUrl":null,"url":null,"abstract":"PurposeThe practice of the defects liability period (DLP) is a risk management strategy meant to secure durable and high-quality works. However, construction products continue to malfunction even after the expiration of DLPs. This study seeks to determine the adequacy of DLPs existing in the construction industry and propose appropriate DLPs for construction projects in the Ghanaian construction industry.Design/methodology/approachApplying quantitative research strategy, 124 questionnaires were retrieved from construction professionals surveyed. The data obtained were analysed using descriptive statistics, Cramer’s V and the significance test with the aid of Stata software.FindingsIt was found that defects start showing in both buildings and roads within 12 months after being handed over for the client’s use. The significance test and Cramer’s V analysis indicate low concordance amongst respondents that the 6–12 month DLPs existing in Ghana are adequate. It is found that the existing DLP practice does not provide sufficient security to clients.Practical implicationsConstruction project clients will need to include the tenderer’s proposed DLP as part of the tender evaluation criteria with the objective of picking up a signal of the quality of work to be delivered.Originality/valueThis paper is one of the pioneering studies addressing the issue of the adequacy of DLPs in the construction industry in the Sub-Saharan Africa region. The findings trigger policy and regulatory changes in conditions guiding construction contracts procured in most developing countries that have adopted and adapted to the World Bank Public Procurement Guidelines.","PeriodicalId":44905,"journal":{"name":"International Journal of Building Pathology and Adaptation","volume":null,"pages":null},"PeriodicalIF":2.1000,"publicationDate":"2024-07-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Adequacy of defects liability periods for public construction projects in Ghana\",\"authors\":\"Collins Ameyaw, Sarfo Mensah, Blondel Akun Abaitey, Anita Asamoah-Duodu\",\"doi\":\"10.1108/ijbpa-04-2024-0081\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"PurposeThe practice of the defects liability period (DLP) is a risk management strategy meant to secure durable and high-quality works. However, construction products continue to malfunction even after the expiration of DLPs. This study seeks to determine the adequacy of DLPs existing in the construction industry and propose appropriate DLPs for construction projects in the Ghanaian construction industry.Design/methodology/approachApplying quantitative research strategy, 124 questionnaires were retrieved from construction professionals surveyed. The data obtained were analysed using descriptive statistics, Cramer’s V and the significance test with the aid of Stata software.FindingsIt was found that defects start showing in both buildings and roads within 12 months after being handed over for the client’s use. The significance test and Cramer’s V analysis indicate low concordance amongst respondents that the 6–12 month DLPs existing in Ghana are adequate. It is found that the existing DLP practice does not provide sufficient security to clients.Practical implicationsConstruction project clients will need to include the tenderer’s proposed DLP as part of the tender evaluation criteria with the objective of picking up a signal of the quality of work to be delivered.Originality/valueThis paper is one of the pioneering studies addressing the issue of the adequacy of DLPs in the construction industry in the Sub-Saharan Africa region. The findings trigger policy and regulatory changes in conditions guiding construction contracts procured in most developing countries that have adopted and adapted to the World Bank Public Procurement Guidelines.\",\"PeriodicalId\":44905,\"journal\":{\"name\":\"International Journal of Building Pathology and Adaptation\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":2.1000,\"publicationDate\":\"2024-07-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Building Pathology and Adaptation\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1108/ijbpa-04-2024-0081\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"CONSTRUCTION & BUILDING TECHNOLOGY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Building Pathology and Adaptation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/ijbpa-04-2024-0081","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
引用次数: 0

摘要

目的 缺陷责任期(DLP)是一种风险管理策略,旨在确保工程的耐用性和质量。然而,即使缺陷责任期已过,建筑产品仍然会出现故障。本研究旨在确定建筑行业现有的缺陷责任期是否充分,并为加纳建筑行业的建筑项目提出适当的缺陷责任期建议。研究结果发现,建筑物和道路在交付客户使用后 12 个月内开始出现缺陷。显著性检验和 Cramer's V 分析表明,受访者对加纳现有的 6 至 12 个月的设计寿命周期是否足够的看法不一致。实际意义建筑项目的客户需要将投标人提议的 DLP 作为评标标准的一部分,目的是获得所交付工程质量的信号。 原创性/价值本文是解决撒哈拉以南非洲地区建筑行业 DLP 适当性问题的开创性研究之一。研究结果引发了政策和监管方面的变化,这些变化指导着大多数采用并适应世界银行《公共采购准则》的发展中国家的建筑合同采购条件。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Adequacy of defects liability periods for public construction projects in Ghana
PurposeThe practice of the defects liability period (DLP) is a risk management strategy meant to secure durable and high-quality works. However, construction products continue to malfunction even after the expiration of DLPs. This study seeks to determine the adequacy of DLPs existing in the construction industry and propose appropriate DLPs for construction projects in the Ghanaian construction industry.Design/methodology/approachApplying quantitative research strategy, 124 questionnaires were retrieved from construction professionals surveyed. The data obtained were analysed using descriptive statistics, Cramer’s V and the significance test with the aid of Stata software.FindingsIt was found that defects start showing in both buildings and roads within 12 months after being handed over for the client’s use. The significance test and Cramer’s V analysis indicate low concordance amongst respondents that the 6–12 month DLPs existing in Ghana are adequate. It is found that the existing DLP practice does not provide sufficient security to clients.Practical implicationsConstruction project clients will need to include the tenderer’s proposed DLP as part of the tender evaluation criteria with the objective of picking up a signal of the quality of work to be delivered.Originality/valueThis paper is one of the pioneering studies addressing the issue of the adequacy of DLPs in the construction industry in the Sub-Saharan Africa region. The findings trigger policy and regulatory changes in conditions guiding construction contracts procured in most developing countries that have adopted and adapted to the World Bank Public Procurement Guidelines.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
4.80
自引率
18.20%
发文量
76
期刊介绍: The International Journal of Building Pathology and Adaptation publishes findings on contemporary and original research towards sustaining, maintaining and managing existing buildings. The journal provides an interdisciplinary approach to the study of buildings, their performance and adaptation in order to develop appropriate technical and management solutions. This requires an holistic understanding of the complex interactions between the materials, components, occupants, design and environment, demanding the application and development of methodologies for diagnosis, prognosis and treatment in this multidisciplinary area. With rapid technological developments, a changing climate and more extreme weather, coupled with developing societal demands, the challenges to the professions responsible are complex and varied; solutions need to be rigorously researched and tested to navigate the dynamic context in which today''s buildings are to be sustained. Within this context, the scope and coverage of the journal incorporates the following indicative topics: • Behavioural and human responses • Building defects and prognosis • Building adaptation and retrofit • Building conservation and restoration • Building Information Modelling (BIM) • Building and planning regulations and legislation • Building technology • Conflict avoidance, management and disputes resolution • Digital information and communication technologies • Education and training • Environmental performance • Energy management • Health, safety and welfare issues • Healthy enclosures • Innovations and innovative technologies • Law and practice of dilapidation • Maintenance and refurbishment • Materials testing • Policy formulation and development • Project management • Resilience • Structural considerations • Surveying methodologies and techniques • Sustainability and climate change • Valuation and financial investment
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信