雷岛大桥外部肌腱断裂:诊断、安全措施和管理

IF 1.1 4区 工程技术 Q3 CONSTRUCTION & BUILDING TECHNOLOGY
Bruno Godart Eng., Champs-sur-Marne, Luciano Tosini Eng., Laurent Gaillet Dr, Bouguenais, Mathieu Barbot Eng.
{"title":"雷岛大桥外部肌腱断裂:诊断、安全措施和管理","authors":"Bruno Godart Eng., Champs-sur-Marne, Luciano Tosini Eng., Laurent Gaillet Dr, Bouguenais, Mathieu Barbot Eng.","doi":"10.1080/10168664.2024.2341933","DOIUrl":null,"url":null,"abstract":"Ré Island Bridge connects Île de Ré to the mainland on the west coast of France and crosses four navigable sea passes, with a maximum air clearance of 30 m above sea level. This bridge is 2926 m lo...","PeriodicalId":51281,"journal":{"name":"Structural Engineering International","volume":"55 1","pages":""},"PeriodicalIF":1.1000,"publicationDate":"2024-07-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The Rupture of an External Tendon in Île de Ré Bridge: Diagnosis, Safety Measures and Management\",\"authors\":\"Bruno Godart Eng., Champs-sur-Marne, Luciano Tosini Eng., Laurent Gaillet Dr, Bouguenais, Mathieu Barbot Eng.\",\"doi\":\"10.1080/10168664.2024.2341933\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Ré Island Bridge connects Île de Ré to the mainland on the west coast of France and crosses four navigable sea passes, with a maximum air clearance of 30 m above sea level. This bridge is 2926 m lo...\",\"PeriodicalId\":51281,\"journal\":{\"name\":\"Structural Engineering International\",\"volume\":\"55 1\",\"pages\":\"\"},\"PeriodicalIF\":1.1000,\"publicationDate\":\"2024-07-05\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Structural Engineering International\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.1080/10168664.2024.2341933\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"CONSTRUCTION & BUILDING TECHNOLOGY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Structural Engineering International","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1080/10168664.2024.2341933","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
引用次数: 0

摘要

雷岛大桥连接法国西海岸的雷岛和大陆,横跨四个可通航的海上通道,最大净空高度为海拔 30 米。该桥全长 2926 米。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The Rupture of an External Tendon in Île de Ré Bridge: Diagnosis, Safety Measures and Management
Ré Island Bridge connects Île de Ré to the mainland on the west coast of France and crosses four navigable sea passes, with a maximum air clearance of 30 m above sea level. This bridge is 2926 m lo...
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Structural Engineering International
Structural Engineering International CONSTRUCTION & BUILDING TECHNOLOGY-ENGINEERING, CIVIL
CiteScore
2.60
自引率
9.10%
发文量
78
审稿时长
6-12 weeks
期刊介绍: The aim of the Association is to exchange knowledge and to advance the practice of structural engineering worldwide in the service of the profession and society.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信