{"title":"雷岛大桥外部肌腱断裂:诊断、安全措施和管理","authors":"Bruno Godart Eng., Champs-sur-Marne, Luciano Tosini Eng., Laurent Gaillet Dr, Bouguenais, Mathieu Barbot Eng.","doi":"10.1080/10168664.2024.2341933","DOIUrl":null,"url":null,"abstract":"Ré Island Bridge connects Île de Ré to the mainland on the west coast of France and crosses four navigable sea passes, with a maximum air clearance of 30 m above sea level. This bridge is 2926 m lo...","PeriodicalId":51281,"journal":{"name":"Structural Engineering International","volume":"55 1","pages":""},"PeriodicalIF":1.1000,"publicationDate":"2024-07-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The Rupture of an External Tendon in Île de Ré Bridge: Diagnosis, Safety Measures and Management\",\"authors\":\"Bruno Godart Eng., Champs-sur-Marne, Luciano Tosini Eng., Laurent Gaillet Dr, Bouguenais, Mathieu Barbot Eng.\",\"doi\":\"10.1080/10168664.2024.2341933\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Ré Island Bridge connects Île de Ré to the mainland on the west coast of France and crosses four navigable sea passes, with a maximum air clearance of 30 m above sea level. This bridge is 2926 m lo...\",\"PeriodicalId\":51281,\"journal\":{\"name\":\"Structural Engineering International\",\"volume\":\"55 1\",\"pages\":\"\"},\"PeriodicalIF\":1.1000,\"publicationDate\":\"2024-07-05\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Structural Engineering International\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.1080/10168664.2024.2341933\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"CONSTRUCTION & BUILDING TECHNOLOGY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Structural Engineering International","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1080/10168664.2024.2341933","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
The Rupture of an External Tendon in Île de Ré Bridge: Diagnosis, Safety Measures and Management
Ré Island Bridge connects Île de Ré to the mainland on the west coast of France and crosses four navigable sea passes, with a maximum air clearance of 30 m above sea level. This bridge is 2926 m lo...
期刊介绍:
The aim of the Association is to exchange knowledge and to advance the practice of structural engineering worldwide in the service of the profession and society.