通过雷达监测和稳定性计算分析热列兹尼矿坑壁坍塌原因

IF 0.7 4区 工程技术 Q4 MINING & MINERAL PROCESSING
A. S. Kalyuzhny, I. Yu. Rozanov
{"title":"通过雷达监测和稳定性计算分析热列兹尼矿坑壁坍塌原因","authors":"A. S. Kalyuzhny, I. Yu. Rozanov","doi":"10.1134/s1062739124010058","DOIUrl":null,"url":null,"abstract":"<h3 data-test=\"abstract-sub-heading\">Abstract</h3><p>The article discusses an integrated approach to finding causes of pit wall failure in Zhelezny Mine of Kovdor GOK. Radar monitoring with IBIS provided data for the slope instability prediction. The stability calculation is performed and analyzed for the failed site of the pit wall. It is shown at the adopted strength properties, failure of the upper bench is only possible as its stability factor is less than 1.50. The causes of instability could be the decreased strength of the pit wall as a result of weathering or watering, and failure could occur along a fracture. An industrial building in the close vicinity of the failure site had no influence on the slope stability. The recommendations on finding certain causes of instability are given.</p>","PeriodicalId":16358,"journal":{"name":"Journal of Mining Science","volume":"2010 1","pages":""},"PeriodicalIF":0.7000,"publicationDate":"2024-07-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Causes of Pit Wall Failure in Zhelezny Mine by Radar Monitoring and Stability Calculations\",\"authors\":\"A. S. Kalyuzhny, I. Yu. Rozanov\",\"doi\":\"10.1134/s1062739124010058\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<h3 data-test=\\\"abstract-sub-heading\\\">Abstract</h3><p>The article discusses an integrated approach to finding causes of pit wall failure in Zhelezny Mine of Kovdor GOK. Radar monitoring with IBIS provided data for the slope instability prediction. The stability calculation is performed and analyzed for the failed site of the pit wall. It is shown at the adopted strength properties, failure of the upper bench is only possible as its stability factor is less than 1.50. The causes of instability could be the decreased strength of the pit wall as a result of weathering or watering, and failure could occur along a fracture. An industrial building in the close vicinity of the failure site had no influence on the slope stability. The recommendations on finding certain causes of instability are given.</p>\",\"PeriodicalId\":16358,\"journal\":{\"name\":\"Journal of Mining Science\",\"volume\":\"2010 1\",\"pages\":\"\"},\"PeriodicalIF\":0.7000,\"publicationDate\":\"2024-07-02\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Mining Science\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.1134/s1062739124010058\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"MINING & MINERAL PROCESSING\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Mining Science","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1134/s1062739124010058","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"MINING & MINERAL PROCESSING","Score":null,"Total":0}
引用次数: 0

摘要

摘要 本文讨论了一种寻找科夫多尔国有矿业公司热列兹尼矿井坑壁坍塌原因的综合方法。利用 IBIS 进行的雷达监测为边坡不稳定性预测提供了数据。对坑壁坍塌部位进行了稳定性计算和分析。结果表明,在所采用的强度特性下,只有当上台阶的稳定系数小于 1.50 时,才有可能发生坍塌。不稳定性的原因可能是风化或浇水导致坑壁强度降低,而且可能沿着断裂发生破坏。坍塌地点附近的工业建筑对斜坡稳定性没有影响。本报告就寻找某些不稳定原因提出了建议。
本文章由计算机程序翻译,如有差异,请以英文原文为准。

Causes of Pit Wall Failure in Zhelezny Mine by Radar Monitoring and Stability Calculations

Causes of Pit Wall Failure in Zhelezny Mine by Radar Monitoring and Stability Calculations

Abstract

The article discusses an integrated approach to finding causes of pit wall failure in Zhelezny Mine of Kovdor GOK. Radar monitoring with IBIS provided data for the slope instability prediction. The stability calculation is performed and analyzed for the failed site of the pit wall. It is shown at the adopted strength properties, failure of the upper bench is only possible as its stability factor is less than 1.50. The causes of instability could be the decreased strength of the pit wall as a result of weathering or watering, and failure could occur along a fracture. An industrial building in the close vicinity of the failure site had no influence on the slope stability. The recommendations on finding certain causes of instability are given.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Journal of Mining Science
Journal of Mining Science 工程技术-矿业与矿物加工
CiteScore
1.70
自引率
25.00%
发文量
19
审稿时长
24 months
期刊介绍: The Journal reflects the current trends of development in fundamental and applied mining sciences. It publishes original articles on geomechanics and geoinformation science, investigation of relationships between global geodynamic processes and man-induced disasters, physical and mathematical modeling of rheological and wave processes in multiphase structural geological media, rock failure, analysis and synthesis of mechanisms, automatic machines, and robots, science of mining machines, creation of resource-saving and ecologically safe technologies of mineral mining, mine aerology and mine thermal physics, coal seam degassing, mechanisms for origination of spontaneous fires and methods for their extinction, mineral dressing, and bowel exploitation.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信