建筑项目工作实施过程中管理和生产延误的原因分析

Putri Lynna A. Luthan, N. Sitanggang, Syahreza Alvan, Wisnu Prayogo
{"title":"建筑项目工作实施过程中管理和生产延误的原因分析","authors":"Putri Lynna A. Luthan, N. Sitanggang, Syahreza Alvan, Wisnu Prayogo","doi":"10.37385/jaets.v5i2.1994","DOIUrl":null,"url":null,"abstract":"This study aims to analyse the causes of delays in the implementation of construction projects caused by management (owners/consultants) and production (contractors). The research sample consists of 56 respondents who are directly involved in the implementation of construction projects (owners, consultants, contractors, field supervisors, and estimators). The quantitative data analysis technique used was descriptive analysis technique, while the qualitative data obtained by interviewing 5 construction project experts was analysed by qualitative descriptive method. To analyse the causes of delays in project implementation, an analysis technique using the Relative Importance Index (RII) formula was used with a reference value of RII> 0.710. The results showed that 1) the average RII on management factors was 0.895> 0.710. This means that management factors (owner/consultant) can cause delays in the implementation of construction projects; 2) the average RII on production factors is 0.917> 0.710. This means that production factors (contractors) can cause delays in the implementation of construction projects. This means that production factors (contractors) can cause delays in the implementation of construction projects. This research is directly useful for construction service providers and contributes to the development of Project / Construction Management science.","PeriodicalId":509378,"journal":{"name":"Journal of Applied Engineering and Technological Science (JAETS)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2024-06-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analysing The Causes of Management and Production Delays in The Implementation of Construction Project Work\",\"authors\":\"Putri Lynna A. Luthan, N. Sitanggang, Syahreza Alvan, Wisnu Prayogo\",\"doi\":\"10.37385/jaets.v5i2.1994\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study aims to analyse the causes of delays in the implementation of construction projects caused by management (owners/consultants) and production (contractors). The research sample consists of 56 respondents who are directly involved in the implementation of construction projects (owners, consultants, contractors, field supervisors, and estimators). The quantitative data analysis technique used was descriptive analysis technique, while the qualitative data obtained by interviewing 5 construction project experts was analysed by qualitative descriptive method. To analyse the causes of delays in project implementation, an analysis technique using the Relative Importance Index (RII) formula was used with a reference value of RII> 0.710. The results showed that 1) the average RII on management factors was 0.895> 0.710. This means that management factors (owner/consultant) can cause delays in the implementation of construction projects; 2) the average RII on production factors is 0.917> 0.710. This means that production factors (contractors) can cause delays in the implementation of construction projects. This means that production factors (contractors) can cause delays in the implementation of construction projects. This research is directly useful for construction service providers and contributes to the development of Project / Construction Management science.\",\"PeriodicalId\":509378,\"journal\":{\"name\":\"Journal of Applied Engineering and Technological Science (JAETS)\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-06-06\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Applied Engineering and Technological Science (JAETS)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.37385/jaets.v5i2.1994\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Applied Engineering and Technological Science (JAETS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.37385/jaets.v5i2.1994","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本研究旨在分析管理部门(业主/顾问)和生产部门(承包商)造成建筑项目实施延误的原因。研究样本包括 56 名直接参与建筑项目实施的受访者(业主、顾问、承包商、现场监理和估算人员)。采用的定量数据分析技术为描述性分析技术,而通过采访 5 位建筑项目专家获得的定性数据则采用定性描述法进行分析。为了分析项目实施延误的原因,采用了相对重要性指数(RII)公式分析技术,参考值为 RII> 0.710。结果表明:1)管理因素的平均 RII 为 0.895>0.710。这说明管理因素(业主/顾问)会造成建筑项目实施的延误;2)生产因素的平均 RII 为 0.917>0.710。这说明生产因素(承包商)会造成建筑项目实施的延误。这说明生产要素(承包商)会造成建筑项目实施的延误。这项研究对建筑服务提供商直接有用,并有助于项目/建筑管理科学的发展。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Analysing The Causes of Management and Production Delays in The Implementation of Construction Project Work
This study aims to analyse the causes of delays in the implementation of construction projects caused by management (owners/consultants) and production (contractors). The research sample consists of 56 respondents who are directly involved in the implementation of construction projects (owners, consultants, contractors, field supervisors, and estimators). The quantitative data analysis technique used was descriptive analysis technique, while the qualitative data obtained by interviewing 5 construction project experts was analysed by qualitative descriptive method. To analyse the causes of delays in project implementation, an analysis technique using the Relative Importance Index (RII) formula was used with a reference value of RII> 0.710. The results showed that 1) the average RII on management factors was 0.895> 0.710. This means that management factors (owner/consultant) can cause delays in the implementation of construction projects; 2) the average RII on production factors is 0.917> 0.710. This means that production factors (contractors) can cause delays in the implementation of construction projects. This means that production factors (contractors) can cause delays in the implementation of construction projects. This research is directly useful for construction service providers and contributes to the development of Project / Construction Management science.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信