{"title":"基础设施、时间和劳动力:阿比让-拉各斯走廊沿线的流动与停滞","authors":"E. Gambino, R. Reboredo","doi":"10.1080/21622671.2024.2357574","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":515900,"journal":{"name":"Territory, Politics, Governance","volume":" 32","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-06-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Infrastructure, time and labour: movement and suspension along the Abidjan-Lagos corridor\",\"authors\":\"E. Gambino, R. Reboredo\",\"doi\":\"10.1080/21622671.2024.2357574\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":515900,\"journal\":{\"name\":\"Territory, Politics, Governance\",\"volume\":\" 32\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-06-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Territory, Politics, Governance\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1080/21622671.2024.2357574\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Territory, Politics, Governance","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/21622671.2024.2357574","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}