{"title":"EPB 在伦敦银镇隧道项目中挖掘隧道","authors":"Dr.-Ing. Alena Conrads, Oon Hooi Lim, Ivor Thomas","doi":"10.1002/geot.202400009","DOIUrl":null,"url":null,"abstract":"<p>The Silvertown Tunnel is a new twin-bore road tunnel under the River Thames in the east of London that increases the river crossing capacity in this area and provides enough clearance for the zero-emission double-decker buses. It is being delivered by Riverlinx CJV on behalf on Transport for London (TfL). The overall project consists of tunnel approach ramps at both portals, cut and cover tunnels, and two 1.1 km-long bored tunnel sections as well as highway connections including a new footbridge and service buildings for operating the tunnel from either end. In this article, the approach and challenges of mechanised tunnelling including the river crossing in a high-density area, with a large-diameter earth pressure balance (EPB) machine in mixed-face conditions, are presented. The Tunnel Bori selection based on the geological and geotechnical information is evaluated and compared to the experience during execution of tunnelling. In detail, the actual EPB drive is evaluated by considering the face pressure support, predicted surface settlements and planned cutterhead maintenance.</p>","PeriodicalId":39412,"journal":{"name":"Geomechanik und Tunnelbau","volume":"17 4","pages":"276-288"},"PeriodicalIF":0.0000,"publicationDate":"2024-06-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"EPB tunnelling at the Silvertown Tunnel Project in London\",\"authors\":\"Dr.-Ing. Alena Conrads, Oon Hooi Lim, Ivor Thomas\",\"doi\":\"10.1002/geot.202400009\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<p>The Silvertown Tunnel is a new twin-bore road tunnel under the River Thames in the east of London that increases the river crossing capacity in this area and provides enough clearance for the zero-emission double-decker buses. It is being delivered by Riverlinx CJV on behalf on Transport for London (TfL). The overall project consists of tunnel approach ramps at both portals, cut and cover tunnels, and two 1.1 km-long bored tunnel sections as well as highway connections including a new footbridge and service buildings for operating the tunnel from either end. In this article, the approach and challenges of mechanised tunnelling including the river crossing in a high-density area, with a large-diameter earth pressure balance (EPB) machine in mixed-face conditions, are presented. The Tunnel Bori selection based on the geological and geotechnical information is evaluated and compared to the experience during execution of tunnelling. In detail, the actual EPB drive is evaluated by considering the face pressure support, predicted surface settlements and planned cutterhead maintenance.</p>\",\"PeriodicalId\":39412,\"journal\":{\"name\":\"Geomechanik und Tunnelbau\",\"volume\":\"17 4\",\"pages\":\"276-288\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-06-14\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Geomechanik und Tunnelbau\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://onlinelibrary.wiley.com/doi/10.1002/geot.202400009\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"Earth and Planetary Sciences\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Geomechanik und Tunnelbau","FirstCategoryId":"1085","ListUrlMain":"https://onlinelibrary.wiley.com/doi/10.1002/geot.202400009","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Earth and Planetary Sciences","Score":null,"Total":0}
EPB tunnelling at the Silvertown Tunnel Project in London
The Silvertown Tunnel is a new twin-bore road tunnel under the River Thames in the east of London that increases the river crossing capacity in this area and provides enough clearance for the zero-emission double-decker buses. It is being delivered by Riverlinx CJV on behalf on Transport for London (TfL). The overall project consists of tunnel approach ramps at both portals, cut and cover tunnels, and two 1.1 km-long bored tunnel sections as well as highway connections including a new footbridge and service buildings for operating the tunnel from either end. In this article, the approach and challenges of mechanised tunnelling including the river crossing in a high-density area, with a large-diameter earth pressure balance (EPB) machine in mixed-face conditions, are presented. The Tunnel Bori selection based on the geological and geotechnical information is evaluated and compared to the experience during execution of tunnelling. In detail, the actual EPB drive is evaluated by considering the face pressure support, predicted surface settlements and planned cutterhead maintenance.
Geomechanik und TunnelbauEarth and Planetary Sciences-Geotechnical Engineering and Engineering Geology
CiteScore
1.20
自引率
0.00%
发文量
111
期刊介绍:
The contributions published in Geomechanics and Tunnelling deal with practical aspects of applied engineering geology, rock mechanics and rock engineering, soil mechanics and foundation engineering, and primarily tunnelling. Each issue focuses on a current topic or specific project. Brief news, reports from construction sites and news on conferences round off the content. From the start of 2009 Geomechanics and Tunnelling has been published as a bilingual English/German journal.