露天煤矿预防滑坡的 2D + 3D 坡形优化设计方法

Jinlong Gao , Shihui Wang , Luqing Ye , Juyu Jiang , Jianxiong Sun
{"title":"露天煤矿预防滑坡的 2D + 3D 坡形优化设计方法","authors":"Jinlong Gao ,&nbsp;Shihui Wang ,&nbsp;Luqing Ye ,&nbsp;Juyu Jiang ,&nbsp;Jianxiong Sun","doi":"10.1016/j.ghm.2024.05.004","DOIUrl":null,"url":null,"abstract":"<div><div>In order to improve the stability of the slope and prevent the occurrence of landslide disaster, this study took the east slope of the first mining area of Zhundong Open-pit Coal Mine as the engineering background, and used a combination of the two-dimensional limit equilibrium method and three-dimensional numerical simulation to optimize the shape of the east slope. By selecting a typical calculation profile based on the Bishop method and the residual thrust method in the two-dimensional rigid body limit equilibrium method, this research carried out the stability analysis of the profile slope, and preliminarily designed the slope shape of the profile position meeting the requirements of the safety reserve coefficient and stripping ratio. Based on the three-dimensional finite element strength reduction method, this paper investigated the reasonably change of the width of the transport plate to solve the problem of the slope shape that does not meet the requirements of safety reserve coefficient and stripping ratio, and established a three-dimensional numerical simulation model of various schemes. It also studied the influence of different tracking distances and slope angles on slope stability, calculated the three-dimensional stability of the slope under different spatial forms, then determined the optimal tracking distance and optimal slope angle, and further optimize the slope stability and stripping ratio. The results show that: when the width of the transport plate of the DBS3 section slope is 8 ​m, it does not meet the requirement of safety reserve coefficient 1.2; when the width of the transport plate is set to 24 ​m, it meets the requirement of a safety reserve coefficient of 1.2 and an economic stripping ratio of not more than 8.0 m3/t. The three-dimensional numerical simulation results concluded that the optimal tracking distance on the east side is 50 ​m, and the optimal slope angle is 35°. After the optimization design of a two-dimensional and three-dimensional slope shape, 2.456 million tons of coal resources were mined, creating a profit of about 21.1268 million yuan. It not only prevents landslide disasters, but also further improve the recovery rate of coal resources.</div></div>","PeriodicalId":100580,"journal":{"name":"Geohazard Mechanics","volume":"2 4","pages":"Pages 236-243"},"PeriodicalIF":0.0000,"publicationDate":"2024-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Optimization design method of 2D+3D slope shape for landslide prevention in open-pit coal mine\",\"authors\":\"Jinlong Gao ,&nbsp;Shihui Wang ,&nbsp;Luqing Ye ,&nbsp;Juyu Jiang ,&nbsp;Jianxiong Sun\",\"doi\":\"10.1016/j.ghm.2024.05.004\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><div>In order to improve the stability of the slope and prevent the occurrence of landslide disaster, this study took the east slope of the first mining area of Zhundong Open-pit Coal Mine as the engineering background, and used a combination of the two-dimensional limit equilibrium method and three-dimensional numerical simulation to optimize the shape of the east slope. By selecting a typical calculation profile based on the Bishop method and the residual thrust method in the two-dimensional rigid body limit equilibrium method, this research carried out the stability analysis of the profile slope, and preliminarily designed the slope shape of the profile position meeting the requirements of the safety reserve coefficient and stripping ratio. Based on the three-dimensional finite element strength reduction method, this paper investigated the reasonably change of the width of the transport plate to solve the problem of the slope shape that does not meet the requirements of safety reserve coefficient and stripping ratio, and established a three-dimensional numerical simulation model of various schemes. It also studied the influence of different tracking distances and slope angles on slope stability, calculated the three-dimensional stability of the slope under different spatial forms, then determined the optimal tracking distance and optimal slope angle, and further optimize the slope stability and stripping ratio. The results show that: when the width of the transport plate of the DBS3 section slope is 8 ​m, it does not meet the requirement of safety reserve coefficient 1.2; when the width of the transport plate is set to 24 ​m, it meets the requirement of a safety reserve coefficient of 1.2 and an economic stripping ratio of not more than 8.0 m3/t. The three-dimensional numerical simulation results concluded that the optimal tracking distance on the east side is 50 ​m, and the optimal slope angle is 35°. After the optimization design of a two-dimensional and three-dimensional slope shape, 2.456 million tons of coal resources were mined, creating a profit of about 21.1268 million yuan. It not only prevents landslide disasters, but also further improve the recovery rate of coal resources.</div></div>\",\"PeriodicalId\":100580,\"journal\":{\"name\":\"Geohazard Mechanics\",\"volume\":\"2 4\",\"pages\":\"Pages 236-243\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Geohazard Mechanics\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S2949741824000293\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Geohazard Mechanics","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S2949741824000293","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文章由计算机程序翻译,如有差异,请以英文原文为准。
Optimization design method of 2D+3D slope shape for landslide prevention in open-pit coal mine
In order to improve the stability of the slope and prevent the occurrence of landslide disaster, this study took the east slope of the first mining area of Zhundong Open-pit Coal Mine as the engineering background, and used a combination of the two-dimensional limit equilibrium method and three-dimensional numerical simulation to optimize the shape of the east slope. By selecting a typical calculation profile based on the Bishop method and the residual thrust method in the two-dimensional rigid body limit equilibrium method, this research carried out the stability analysis of the profile slope, and preliminarily designed the slope shape of the profile position meeting the requirements of the safety reserve coefficient and stripping ratio. Based on the three-dimensional finite element strength reduction method, this paper investigated the reasonably change of the width of the transport plate to solve the problem of the slope shape that does not meet the requirements of safety reserve coefficient and stripping ratio, and established a three-dimensional numerical simulation model of various schemes. It also studied the influence of different tracking distances and slope angles on slope stability, calculated the three-dimensional stability of the slope under different spatial forms, then determined the optimal tracking distance and optimal slope angle, and further optimize the slope stability and stripping ratio. The results show that: when the width of the transport plate of the DBS3 section slope is 8 ​m, it does not meet the requirement of safety reserve coefficient 1.2; when the width of the transport plate is set to 24 ​m, it meets the requirement of a safety reserve coefficient of 1.2 and an economic stripping ratio of not more than 8.0 m3/t. The three-dimensional numerical simulation results concluded that the optimal tracking distance on the east side is 50 ​m, and the optimal slope angle is 35°. After the optimization design of a two-dimensional and three-dimensional slope shape, 2.456 million tons of coal resources were mined, creating a profit of about 21.1268 million yuan. It not only prevents landslide disasters, but also further improve the recovery rate of coal resources.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信