{"title":"根据现场测试和有限元模型估算既有铁路横梁顶桥梁的桥鼻荷载","authors":"Alireza Ghiasi, Daniel Lee","doi":"10.1186/s43251-024-00125-5","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":72082,"journal":{"name":"Advances in bridge engineering","volume":"45 19","pages":""},"PeriodicalIF":2.1000,"publicationDate":"2024-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Estimation of nosing load in existing railway transom top bridges based on field testing and finite element modelling\",\"authors\":\"Alireza Ghiasi, Daniel Lee\",\"doi\":\"10.1186/s43251-024-00125-5\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":72082,\"journal\":{\"name\":\"Advances in bridge engineering\",\"volume\":\"45 19\",\"pages\":\"\"},\"PeriodicalIF\":2.1000,\"publicationDate\":\"2024-06-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Advances in bridge engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1186/s43251-024-00125-5\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Advances in bridge engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1186/s43251-024-00125-5","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}