绘制凶杀案调查流程图并估算凶杀案调查组所需资源:美国案例研究的结果

J. B. Kuhns, Shannon Messer, M. L. Exum
{"title":"绘制凶杀案调查流程图并估算凶杀案调查组所需资源:美国案例研究的结果","authors":"J. B. Kuhns, Shannon Messer, M. L. Exum","doi":"10.1177/0032258x241258363","DOIUrl":null,"url":null,"abstract":"A research team worked with a large urban jurisdiction in the southeastern United States, conducted detective interviews, developed process maps, and estimated the work hours associated with various phases of homicide investigations. The investigative process was organized into separate stages and presented as process maps. The average time elapsed for the initial investigative stage was 72.0 hours, while time to complete the second stage was 10.3 days. Plea-bargained cases consumed 12 hours of lead investigator’s time; homicide trials required an additional 13.2 workdays. These workflow maps and workload estimates could be used to help determine staffing allocations in similar agencies.","PeriodicalId":22939,"journal":{"name":"The Police Journal: Theory, Practice and Principles","volume":"4 5","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-06-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Process mapping homicide investigations and estimating resource requirements for homicide units: Findings from a case study in the United States\",\"authors\":\"J. B. Kuhns, Shannon Messer, M. L. Exum\",\"doi\":\"10.1177/0032258x241258363\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A research team worked with a large urban jurisdiction in the southeastern United States, conducted detective interviews, developed process maps, and estimated the work hours associated with various phases of homicide investigations. The investigative process was organized into separate stages and presented as process maps. The average time elapsed for the initial investigative stage was 72.0 hours, while time to complete the second stage was 10.3 days. Plea-bargained cases consumed 12 hours of lead investigator’s time; homicide trials required an additional 13.2 workdays. These workflow maps and workload estimates could be used to help determine staffing allocations in similar agencies.\",\"PeriodicalId\":22939,\"journal\":{\"name\":\"The Police Journal: Theory, Practice and Principles\",\"volume\":\"4 5\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-06-02\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"The Police Journal: Theory, Practice and Principles\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1177/0032258x241258363\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Police Journal: Theory, Practice and Principles","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1177/0032258x241258363","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

一个研究小组与美国东南部的一个大型城市辖区合作,进行了侦探访谈,绘制了流程图,并估算了与凶杀案调查各阶段相关的工作时间。调查过程被分为不同的阶段,并以流程图的形式呈现。初步调查阶段的平均耗时为 72.0 小时,而完成第二阶段的耗时为 10.3 天。认罪求情协议案件消耗了首席调查员 12 个小时的时间;凶杀案审判需要额外 13.2 个工作日。这些工作流程图和工作量估算可用来帮助确定类似机构的人员配置。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Process mapping homicide investigations and estimating resource requirements for homicide units: Findings from a case study in the United States
A research team worked with a large urban jurisdiction in the southeastern United States, conducted detective interviews, developed process maps, and estimated the work hours associated with various phases of homicide investigations. The investigative process was organized into separate stages and presented as process maps. The average time elapsed for the initial investigative stage was 72.0 hours, while time to complete the second stage was 10.3 days. Plea-bargained cases consumed 12 hours of lead investigator’s time; homicide trials required an additional 13.2 workdays. These workflow maps and workload estimates could be used to help determine staffing allocations in similar agencies.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信