{"title":"社区管理的农村供水项目的可持续性分析:卡斯基地区案例研究","authors":"Abhinaya Poudel, Sundar Adhikari","doi":"10.3126/jes2.v3i1.66230","DOIUrl":null,"url":null,"abstract":"After the 1992 International Conference on Water and the Environment in Dublin, a new approach to rural water supply was adopted being that the water should be managed at the lowest appropriate level, with users involved in the planning and implementation of projects. As per the data of DWSSM (2019) even though the basic level water supply coverage of Nepal is 87.22% among the water supply schemes providing service to the people only 28.13% of the schemes are fully functional. The lack of functionality questions the investment of different agencies as projects do not operate throughout project life and the public are facing the problem of not getting safe and reliable water. The main aim of this study was to assess the post-construction status of these projects in relation to their sustainable management. For this, six water supply projects completed over the last five years have been studied. During the study, the data was collected from the structured questionnaire, focal group discussion, Key informants’ interviews and field observations. These water supply projects were evaluated based on five main criteria namely economic, technical, social, institutional, and environmental factors. From the study it is observed that the sustainability score of Syaude Lifting WSP is 62.82%, Serokhola WSP is 66.74%, Lumre WSP is 64.25%, Sudame WSP is 54.97%, Bhachok WSP is 63.74% and Chisapani WSP is 76.90%. The economic and technical aspect of sustainability is found poor in all of these water supply projects. The major problem faced by the community is the lack of financial resources and technical capacity-building programs in the construction stage which have ultimately hampered the project's sustainability. Post-construction training, technical and capacity-building training, support policies and programs are important requirements for the sustainable development of rural water supply systems.","PeriodicalId":510231,"journal":{"name":"Journal of Engineering and Sciences","volume":"26 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-06-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Sustainability Analysis of Community-Managed Rural Water Supply Project: A Case Study of Kaski District\",\"authors\":\"Abhinaya Poudel, Sundar Adhikari\",\"doi\":\"10.3126/jes2.v3i1.66230\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"After the 1992 International Conference on Water and the Environment in Dublin, a new approach to rural water supply was adopted being that the water should be managed at the lowest appropriate level, with users involved in the planning and implementation of projects. As per the data of DWSSM (2019) even though the basic level water supply coverage of Nepal is 87.22% among the water supply schemes providing service to the people only 28.13% of the schemes are fully functional. The lack of functionality questions the investment of different agencies as projects do not operate throughout project life and the public are facing the problem of not getting safe and reliable water. The main aim of this study was to assess the post-construction status of these projects in relation to their sustainable management. For this, six water supply projects completed over the last five years have been studied. During the study, the data was collected from the structured questionnaire, focal group discussion, Key informants’ interviews and field observations. These water supply projects were evaluated based on five main criteria namely economic, technical, social, institutional, and environmental factors. From the study it is observed that the sustainability score of Syaude Lifting WSP is 62.82%, Serokhola WSP is 66.74%, Lumre WSP is 64.25%, Sudame WSP is 54.97%, Bhachok WSP is 63.74% and Chisapani WSP is 76.90%. The economic and technical aspect of sustainability is found poor in all of these water supply projects. The major problem faced by the community is the lack of financial resources and technical capacity-building programs in the construction stage which have ultimately hampered the project's sustainability. Post-construction training, technical and capacity-building training, support policies and programs are important requirements for the sustainable development of rural water supply systems.\",\"PeriodicalId\":510231,\"journal\":{\"name\":\"Journal of Engineering and Sciences\",\"volume\":\"26 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-06-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Engineering and Sciences\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.3126/jes2.v3i1.66230\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Engineering and Sciences","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3126/jes2.v3i1.66230","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

1992 年都柏林国际水与环境会议之后,人们采用了一种新的农村供水方法,即应在适当的最低级别对水进行管理,让用户参与项目的规划和实施。根据 DWSSM(2019 年)的数据,尽管尼泊尔的基本供水覆盖率为 87.22%,但在为人民提供服务的供水计划中,只有 28.13%的计划能够充分发挥作用。由于项目在整个生命周期内都无法运行,功能的缺失对不同机构的投资提出了质疑,而公众正面临着无法获得安全可靠用水的问题。本研究的主要目的是评估这些项目建成后的可持续管理状况。为此,我们对过去五年中竣工的六个供水项目进行了研究。研究期间,通过结构化问卷、焦点小组讨论、关键信息提供者访谈和实地观察收集了数据。对这些供水项目的评估基于五大标准,即经济、技术、社会、制度和环境因素。研究结果表明,Syaude Lifting WSP 项目的可持续性得分率为 62.82%,Serokhola WSP 项目的可持续性得分率为 66.74%,Lumre WSP 项目的可持续性得分率为 64.25%,Sudame WSP 项目的可持续性得分率为 54.97%,Bhachok WSP 项目的可持续性得分率为 63.74%,Chisapani WSP 项目的可持续性得分率为 76.90%。所有这些供水项目在经济和技术方面的可持续性都很差。社区面临的主要问题是在施工阶段缺乏财政资源和技术能力建设计划,这最终阻碍了项目的可持续性。施工后培训、技术和能力建设培训、支持政策和计划是农村供水系统可持续发展的重要条件。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Sustainability Analysis of Community-Managed Rural Water Supply Project: A Case Study of Kaski District
After the 1992 International Conference on Water and the Environment in Dublin, a new approach to rural water supply was adopted being that the water should be managed at the lowest appropriate level, with users involved in the planning and implementation of projects. As per the data of DWSSM (2019) even though the basic level water supply coverage of Nepal is 87.22% among the water supply schemes providing service to the people only 28.13% of the schemes are fully functional. The lack of functionality questions the investment of different agencies as projects do not operate throughout project life and the public are facing the problem of not getting safe and reliable water. The main aim of this study was to assess the post-construction status of these projects in relation to their sustainable management. For this, six water supply projects completed over the last five years have been studied. During the study, the data was collected from the structured questionnaire, focal group discussion, Key informants’ interviews and field observations. These water supply projects were evaluated based on five main criteria namely economic, technical, social, institutional, and environmental factors. From the study it is observed that the sustainability score of Syaude Lifting WSP is 62.82%, Serokhola WSP is 66.74%, Lumre WSP is 64.25%, Sudame WSP is 54.97%, Bhachok WSP is 63.74% and Chisapani WSP is 76.90%. The economic and technical aspect of sustainability is found poor in all of these water supply projects. The major problem faced by the community is the lack of financial resources and technical capacity-building programs in the construction stage which have ultimately hampered the project's sustainability. Post-construction training, technical and capacity-building training, support policies and programs are important requirements for the sustainable development of rural water supply systems.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信