{"title":"复合材料塔式起重机臂的可行性","authors":"L Solazzi","doi":"10.1088/1757-899x/1306/1/012010","DOIUrl":null,"url":null,"abstract":"The main purpose of this research is to design a jib of a tower crane using composite material and to compare the effects/performance on the whole machine due to this lightweight process. The research starts by sizing the jib with steel material. Many different load conditions were involved and different criteria were assumed; those are: stress safety factor, stiffness, dynamic performance (modal) and buckling phenomenon which is the most important parameter. Then other non-standard load conditions were applied to the tower crane: moving load and jib (rotation and elevating) and adopting wind variable in time. The results of these load conditions were assumed to design a new jib made of pultruded composite material. The next step involves the design of additional elements of the crane: ropes, counter boom, counterweight, electric motor, etc. The last step concerns the economic feasibility of the new solution. The results show that the weight of the jib made by composite material is about 25% of the one made by steel and the economic payout for making the composite arm can be equalized in about a year and a half of machine operation, making the proposed solution very worthwhile.","PeriodicalId":14483,"journal":{"name":"IOP Conference Series: Materials Science and Engineering","volume":"21 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Feasibility of the tower crane jib made of composite material\",\"authors\":\"L Solazzi\",\"doi\":\"10.1088/1757-899x/1306/1/012010\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The main purpose of this research is to design a jib of a tower crane using composite material and to compare the effects/performance on the whole machine due to this lightweight process. The research starts by sizing the jib with steel material. Many different load conditions were involved and different criteria were assumed; those are: stress safety factor, stiffness, dynamic performance (modal) and buckling phenomenon which is the most important parameter. Then other non-standard load conditions were applied to the tower crane: moving load and jib (rotation and elevating) and adopting wind variable in time. The results of these load conditions were assumed to design a new jib made of pultruded composite material. The next step involves the design of additional elements of the crane: ropes, counter boom, counterweight, electric motor, etc. The last step concerns the economic feasibility of the new solution. The results show that the weight of the jib made by composite material is about 25% of the one made by steel and the economic payout for making the composite arm can be equalized in about a year and a half of machine operation, making the proposed solution very worthwhile.\",\"PeriodicalId\":14483,\"journal\":{\"name\":\"IOP Conference Series: Materials Science and Engineering\",\"volume\":\"21 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-05-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IOP Conference Series: Materials Science and Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1088/1757-899x/1306/1/012010\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IOP Conference Series: Materials Science and Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1088/1757-899x/1306/1/012010","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Feasibility of the tower crane jib made of composite material
The main purpose of this research is to design a jib of a tower crane using composite material and to compare the effects/performance on the whole machine due to this lightweight process. The research starts by sizing the jib with steel material. Many different load conditions were involved and different criteria were assumed; those are: stress safety factor, stiffness, dynamic performance (modal) and buckling phenomenon which is the most important parameter. Then other non-standard load conditions were applied to the tower crane: moving load and jib (rotation and elevating) and adopting wind variable in time. The results of these load conditions were assumed to design a new jib made of pultruded composite material. The next step involves the design of additional elements of the crane: ropes, counter boom, counterweight, electric motor, etc. The last step concerns the economic feasibility of the new solution. The results show that the weight of the jib made by composite material is about 25% of the one made by steel and the economic payout for making the composite arm can be equalized in about a year and a half of machine operation, making the proposed solution very worthwhile.