考虑大量可再生能源渗透和系统惯性,开发发电机维护调度方法

IF 0.4 4区 工程技术 Q4 ENGINEERING, ELECTRICAL & ELECTRONIC
Shuhei Segawa, Kazuhiko Ogimoto, Hitoshi Azuma, Akira Isonaga, Suguru Fukutome
{"title":"考虑大量可再生能源渗透和系统惯性,开发发电机维护调度方法","authors":"Shuhei Segawa,&nbsp;Kazuhiko Ogimoto,&nbsp;Hitoshi Azuma,&nbsp;Akira Isonaga,&nbsp;Suguru Fukutome","doi":"10.1002/eej.23465","DOIUrl":null,"url":null,"abstract":"<p>Conventional methods to schedule power generators maintenance aim to secure enough supply reserve margin to the power system when its power generators have to go under maintenance. However, the use of such methods in scenarios of large penetration of VRE, might be problematic. This is because in such scenarios conventional scheduling methods might inadvertently concentrate maintenance operations when residual demand is particularly low, creating situations in which there is insufficient supply-demand balancing capability and inertia to operate the power system properly. In this study, we present the development of a new method to schedule generator maintenance that ensure inertia and balancing capability constraints, and show its effectiveness.</p>","PeriodicalId":50550,"journal":{"name":"Electrical Engineering in Japan","volume":"217 2","pages":""},"PeriodicalIF":0.4000,"publicationDate":"2024-05-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Development of a maintenance scheduling method for power generators considering large penetration of variable renewable energy sources and system inertia\",\"authors\":\"Shuhei Segawa,&nbsp;Kazuhiko Ogimoto,&nbsp;Hitoshi Azuma,&nbsp;Akira Isonaga,&nbsp;Suguru Fukutome\",\"doi\":\"10.1002/eej.23465\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<p>Conventional methods to schedule power generators maintenance aim to secure enough supply reserve margin to the power system when its power generators have to go under maintenance. However, the use of such methods in scenarios of large penetration of VRE, might be problematic. This is because in such scenarios conventional scheduling methods might inadvertently concentrate maintenance operations when residual demand is particularly low, creating situations in which there is insufficient supply-demand balancing capability and inertia to operate the power system properly. In this study, we present the development of a new method to schedule generator maintenance that ensure inertia and balancing capability constraints, and show its effectiveness.</p>\",\"PeriodicalId\":50550,\"journal\":{\"name\":\"Electrical Engineering in Japan\",\"volume\":\"217 2\",\"pages\":\"\"},\"PeriodicalIF\":0.4000,\"publicationDate\":\"2024-05-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Electrical Engineering in Japan\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://onlinelibrary.wiley.com/doi/10.1002/eej.23465\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, ELECTRICAL & ELECTRONIC\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Electrical Engineering in Japan","FirstCategoryId":"5","ListUrlMain":"https://onlinelibrary.wiley.com/doi/10.1002/eej.23465","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, ELECTRICAL & ELECTRONIC","Score":null,"Total":0}
引用次数: 0

摘要

安排发电设备维护的传统方法旨在确保电力系统在发电设备需要维护时有足够的供电储备裕度。然而,在可再生能源大量渗透的情况下,使用这种方法可能会出现问题。这是因为在这种情况下,传统的调度方法可能会在剩余需求特别低时无意中将维护操作集中起来,从而造成供需平衡能力和惯性不足的情况,使电力系统无法正常运行。在本研究中,我们提出了一种新的发电机维护调度方法,以确保惯性和平衡能力约束,并展示了其有效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Development of a maintenance scheduling method for power generators considering large penetration of variable renewable energy sources and system inertia

Conventional methods to schedule power generators maintenance aim to secure enough supply reserve margin to the power system when its power generators have to go under maintenance. However, the use of such methods in scenarios of large penetration of VRE, might be problematic. This is because in such scenarios conventional scheduling methods might inadvertently concentrate maintenance operations when residual demand is particularly low, creating situations in which there is insufficient supply-demand balancing capability and inertia to operate the power system properly. In this study, we present the development of a new method to schedule generator maintenance that ensure inertia and balancing capability constraints, and show its effectiveness.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Electrical Engineering in Japan
Electrical Engineering in Japan 工程技术-工程:电子与电气
CiteScore
0.80
自引率
0.00%
发文量
51
审稿时长
4-8 weeks
期刊介绍: Electrical Engineering in Japan (EEJ) is an official journal of the Institute of Electrical Engineers of Japan (IEEJ). This authoritative journal is a translation of the Transactions of the Institute of Electrical Engineers of Japan. It publishes 16 issues a year on original research findings in Electrical Engineering with special focus on the science, technology and applications of electric power, such as power generation, transmission and conversion, electric railways (including magnetic levitation devices), motors, switching, power economics.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信