{"title":"在矫形鞋供应链中实施增材制造--成本和前置时间比较","authors":"Victor Verboeket, Harold Krikke, Mika Salmi","doi":"10.3390/logistics8020049","DOIUrl":null,"url":null,"abstract":"Background: Additive manufacturing (AM) for patient-specific medical care products offers great opportunities. However, evidence about the supply chain (SC) performance impact based on empirical data is limited. Methods: In this case study, we gathered real-life data about a traditional manufacturing orthopedic shoe SC and developed future scenarios in which AM is introduced at various points and with different degrees of penetration in the SC. Results: Presently, AM can only replace traditional manufacturing of tools and shoe components at a higher total cost. However, with maturing technology, the complete AM production of orthopedic shoes is expected to become feasible. Theoretically, that could disrupt existing SCs, eliminating 70% of the SC steps, improving SC lead time by 90%, and altering SC relations. However, certain thresholds currently prevent disruption. Specifically, the AM of complete orthopedic shoes has to become possible, manufacturing prices have to drop, and traditional craftsmanship has to be integrated into the digital product design. Conclusions: A framework for transition pathways, including directions for future research, is formed. Findings provide valuable insights for scholars and decision makers in the patient-specific products industry, health insurance providers, and healthcare policy makers to be better prepared by adjusting SC designs, relationships, and remuneration programs while AM technology develops towards maturity.","PeriodicalId":507203,"journal":{"name":"Logistics","volume":"40 2","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-05-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Implementing Additive Manufacturing in Orthopedic Shoe Supply Chains—Cost and Lead Time Comparison\",\"authors\":\"Victor Verboeket, Harold Krikke, Mika Salmi\",\"doi\":\"10.3390/logistics8020049\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Background: Additive manufacturing (AM) for patient-specific medical care products offers great opportunities. However, evidence about the supply chain (SC) performance impact based on empirical data is limited. Methods: In this case study, we gathered real-life data about a traditional manufacturing orthopedic shoe SC and developed future scenarios in which AM is introduced at various points and with different degrees of penetration in the SC. Results: Presently, AM can only replace traditional manufacturing of tools and shoe components at a higher total cost. However, with maturing technology, the complete AM production of orthopedic shoes is expected to become feasible. Theoretically, that could disrupt existing SCs, eliminating 70% of the SC steps, improving SC lead time by 90%, and altering SC relations. However, certain thresholds currently prevent disruption. Specifically, the AM of complete orthopedic shoes has to become possible, manufacturing prices have to drop, and traditional craftsmanship has to be integrated into the digital product design. Conclusions: A framework for transition pathways, including directions for future research, is formed. Findings provide valuable insights for scholars and decision makers in the patient-specific products industry, health insurance providers, and healthcare policy makers to be better prepared by adjusting SC designs, relationships, and remuneration programs while AM technology develops towards maturity.\",\"PeriodicalId\":507203,\"journal\":{\"name\":\"Logistics\",\"volume\":\"40 2\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-05-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Logistics\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.3390/logistics8020049\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Logistics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3390/logistics8020049","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
摘要
背景:患者专用医疗产品的快速成型制造(AM)提供了巨大的机遇。然而,基于经验数据的有关供应链(SC)性能影响的证据却很有限。方法:在本案例研究中,我们收集了一家公司的真实情况:在本案例研究中,我们收集了有关传统制造矫形鞋供应链的真实数据,并制定了在供应链的不同环节和不同渗透程度引入 AM 的未来方案。结果:目前,AM 只能以较高的总成本取代工具和鞋部件的传统制造。然而,随着技术的不断成熟,预计整个矫形鞋的 AM 生产将变得可行。从理论上讲,这可能会颠覆现有的SC,消除70%的SC步骤,将SC准备时间缩短90%,并改变SC关系。然而,目前某些阈值阻碍了这种颠覆。具体来说,整双矫形鞋的 AM 必须成为可能,制造价格必须下降,传统工艺必须融入数字产品设计中。结论:形成了一个过渡路径框架,包括未来的研究方向。研究结果为患者专用产品行业的学者和决策者、医疗保险提供商以及医疗保健政策制定者提供了宝贵的见解,使他们在AM技术发展成熟的同时,通过调整SC设计、关系和薪酬方案,更好地做好准备。
Implementing Additive Manufacturing in Orthopedic Shoe Supply Chains—Cost and Lead Time Comparison
Background: Additive manufacturing (AM) for patient-specific medical care products offers great opportunities. However, evidence about the supply chain (SC) performance impact based on empirical data is limited. Methods: In this case study, we gathered real-life data about a traditional manufacturing orthopedic shoe SC and developed future scenarios in which AM is introduced at various points and with different degrees of penetration in the SC. Results: Presently, AM can only replace traditional manufacturing of tools and shoe components at a higher total cost. However, with maturing technology, the complete AM production of orthopedic shoes is expected to become feasible. Theoretically, that could disrupt existing SCs, eliminating 70% of the SC steps, improving SC lead time by 90%, and altering SC relations. However, certain thresholds currently prevent disruption. Specifically, the AM of complete orthopedic shoes has to become possible, manufacturing prices have to drop, and traditional craftsmanship has to be integrated into the digital product design. Conclusions: A framework for transition pathways, including directions for future research, is formed. Findings provide valuable insights for scholars and decision makers in the patient-specific products industry, health insurance providers, and healthcare policy makers to be better prepared by adjusting SC designs, relationships, and remuneration programs while AM technology develops towards maturity.