BIM 在优化电力管道以实现高效电缆布线中的应用:工业方法

V Rajesh Kumar, Sai Kumar Koda, P Sai Kumar, Naveen Aravind Arivalagan
{"title":"BIM 在优化电力管道以实现高效电缆布线中的应用:工业方法","authors":"V Rajesh Kumar, Sai Kumar Koda, P Sai Kumar, Naveen Aravind Arivalagan","doi":"10.17485/ijst/v17i20.646","DOIUrl":null,"url":null,"abstract":"Objectives: This study was conducted to achieve optimized power duct sizes with ensuring sufficient bending for the electrical cables at the road junction locations. Methods: Used Revit tool, a Building Information Modelling (BIM) technology to integrate the design data of electrical cables and for modelling the power duct structure. Tools in the Revit software were used to automate the cable bending and clash detection simulations tasks. Findings: With the help of these tools, we modeled cable routing and optimized power duct structure sizes, saving 90% of man-hours and achieving 20% cost savings at the site compared to conventional methods. Novelty: It’s a pioneering effort to integrate the design data of electrical cables and automate the cable routing by ensuring the sufficient bending radius by utilizing the tools in the Revit software. And optimization of the power duct size at the cable transition locations by performing multiple simulations of the model and clash detection. Keywords: BIM, Revit, Virtual Design, Cable Routing, Electrical Design","PeriodicalId":13296,"journal":{"name":"Indian journal of science and technology","volume":"43 11","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-05-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"BIM in Optimization of Power Duct for Efficient Cable Routing: An Industrial Approach\",\"authors\":\"V Rajesh Kumar, Sai Kumar Koda, P Sai Kumar, Naveen Aravind Arivalagan\",\"doi\":\"10.17485/ijst/v17i20.646\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Objectives: This study was conducted to achieve optimized power duct sizes with ensuring sufficient bending for the electrical cables at the road junction locations. Methods: Used Revit tool, a Building Information Modelling (BIM) technology to integrate the design data of electrical cables and for modelling the power duct structure. Tools in the Revit software were used to automate the cable bending and clash detection simulations tasks. Findings: With the help of these tools, we modeled cable routing and optimized power duct structure sizes, saving 90% of man-hours and achieving 20% cost savings at the site compared to conventional methods. Novelty: It’s a pioneering effort to integrate the design data of electrical cables and automate the cable routing by ensuring the sufficient bending radius by utilizing the tools in the Revit software. And optimization of the power duct size at the cable transition locations by performing multiple simulations of the model and clash detection. Keywords: BIM, Revit, Virtual Design, Cable Routing, Electrical Design\",\"PeriodicalId\":13296,\"journal\":{\"name\":\"Indian journal of science and technology\",\"volume\":\"43 11\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-05-17\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Indian journal of science and technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.17485/ijst/v17i20.646\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Indian journal of science and technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.17485/ijst/v17i20.646","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

目的:本研究旨在优化电力管道尺寸,确保道路交叉口位置的电缆有足够的弯曲度。方法使用建筑信息模型(BIM)技术 Revit 工具整合电缆设计数据,并对电力管道结构进行建模。使用 Revit 软件中的工具自动完成电缆弯曲和冲突检测模拟任务。研究结果在这些工具的帮助下,我们对电缆布线进行了建模,并优化了电力管道结构尺寸,与传统方法相比,节省了 90% 的工时,并在现场节约了 20% 的成本。新颖性:这是一项开创性的工作,通过利用 Revit 软件中的工具,整合了电缆的设计数据,并通过确保足够的弯曲半径实现了电缆布线的自动化。并通过对模型进行多次模拟和冲突检测,优化电缆过渡位置的电力管道尺寸。关键词BIM、Revit、虚拟设计、电缆布线、电气设计
本文章由计算机程序翻译,如有差异,请以英文原文为准。
BIM in Optimization of Power Duct for Efficient Cable Routing: An Industrial Approach
Objectives: This study was conducted to achieve optimized power duct sizes with ensuring sufficient bending for the electrical cables at the road junction locations. Methods: Used Revit tool, a Building Information Modelling (BIM) technology to integrate the design data of electrical cables and for modelling the power duct structure. Tools in the Revit software were used to automate the cable bending and clash detection simulations tasks. Findings: With the help of these tools, we modeled cable routing and optimized power duct structure sizes, saving 90% of man-hours and achieving 20% cost savings at the site compared to conventional methods. Novelty: It’s a pioneering effort to integrate the design data of electrical cables and automate the cable routing by ensuring the sufficient bending radius by utilizing the tools in the Revit software. And optimization of the power duct size at the cable transition locations by performing multiple simulations of the model and clash detection. Keywords: BIM, Revit, Virtual Design, Cable Routing, Electrical Design
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信