北塔帕努利地区 Aek pea rihit 桥钻孔灌注桩地基分析

Hakim Armando Benny Sihombing, Hermansyah Hermansyah, Suranto Suranto, Denny Meisandy Hutauruk
{"title":"北塔帕努利地区 Aek pea rihit 桥钻孔灌注桩地基分析","authors":"Hakim Armando Benny Sihombing, Hermansyah Hermansyah, Suranto Suranto, Denny Meisandy Hutauruk","doi":"10.47521/selodangmayang.v10i1.360","DOIUrl":null,"url":null,"abstract":"Pile foundations are used for buildings where the firm soil is located at a considerable depth. This type of foundation is often employed in the construction of tall buildings (high-rise buildings) that bear exceptionally heavy loads. Before undertaking any construction project, the first on-site task is foundation work (substructure). The foundation is a crucial element in civil engineering because it is responsible for supporting and carrying the load imposed by the upper structure, namely the structural load. The aim of this study is to calculate the bearing capacity of bored piles based on the results of soil investigation and to assess the settlement that occurs in bored piles. The calculation of the bearing capacity of bored piles is performed using the Meyerhoff method, and the settlement of bored piles is calculated using the Vesic method. According to the soil investigation data, the calculated bearing capacity of the bored pile is 426.86 tons, with an allowable bearing capacity of 138.52 tons. The planning of pile foundations also takes into account the magnitude of pile settlement. The settlement of a single pile is 0.02m, and the allowable settlement is 0.05m. \n  \nPondasi tiang dipergunakan untuk bangunan dimana tanah kerasnya berada pada posisi yang cukup dalam. Jenis pondasi ini juga sering digunakan untuk konstruksi bangunan tinggi (high risebuilding) yang memikul beban yang sangat besar. Sebelum melaksanakan suatu pembangunan konstruksi yang pertama dikerjakan dilapangan adalah pekerjaan pondasi (struktur bawah). Pondasi merupakan suatu pekerjaan yang sangat penting dalam suatu pekerjaan teknik sipil, karena pondasi inilah yang memikul dan menahan suatu beban yang bekerja diatasnya yaitu beban konstruksi atas. Tujuan dari Penelitian ini untuk menghitung daya dukung bored pile dari hasil sondir dan menghitung penurunan yang terjadi pada bored pile. Pada perhitungan daya dukung bored pile dilakukan dengan menggunakan metode Meyerhoff dan untuk perhitungan penurunan bore pile dilakukan dengan menggunakan metode Vesic. Berdasarkan data sondir hasil perhitungan daya dukung bore pile sebesar 426.86 ton dengan besar daya dukung ijinnya 138.52 ton. Analisis pondasi tiang juga memperhitungkan besar penurunan tiang. Penurunan tiang tunggal sebesar 0.02m dan penurunan tiang yang diijinkan sebesar 0.05m.","PeriodicalId":506363,"journal":{"name":"Selodang Mayang: Jurnal Ilmiah Badan Perencanaan Pembangunan Daerah Kabupaten Indragiri Hilir","volume":"209 S645","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-04-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"ANALISIS PONDASI BORED PILE PADA JEMBATAN AEK PEA RIHIT DI KABUPATEN TAPANULI UTARA\",\"authors\":\"Hakim Armando Benny Sihombing, Hermansyah Hermansyah, Suranto Suranto, Denny Meisandy Hutauruk\",\"doi\":\"10.47521/selodangmayang.v10i1.360\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Pile foundations are used for buildings where the firm soil is located at a considerable depth. This type of foundation is often employed in the construction of tall buildings (high-rise buildings) that bear exceptionally heavy loads. Before undertaking any construction project, the first on-site task is foundation work (substructure). The foundation is a crucial element in civil engineering because it is responsible for supporting and carrying the load imposed by the upper structure, namely the structural load. The aim of this study is to calculate the bearing capacity of bored piles based on the results of soil investigation and to assess the settlement that occurs in bored piles. The calculation of the bearing capacity of bored piles is performed using the Meyerhoff method, and the settlement of bored piles is calculated using the Vesic method. According to the soil investigation data, the calculated bearing capacity of the bored pile is 426.86 tons, with an allowable bearing capacity of 138.52 tons. The planning of pile foundations also takes into account the magnitude of pile settlement. The settlement of a single pile is 0.02m, and the allowable settlement is 0.05m. \\n  \\nPondasi tiang dipergunakan untuk bangunan dimana tanah kerasnya berada pada posisi yang cukup dalam. Jenis pondasi ini juga sering digunakan untuk konstruksi bangunan tinggi (high risebuilding) yang memikul beban yang sangat besar. Sebelum melaksanakan suatu pembangunan konstruksi yang pertama dikerjakan dilapangan adalah pekerjaan pondasi (struktur bawah). Pondasi merupakan suatu pekerjaan yang sangat penting dalam suatu pekerjaan teknik sipil, karena pondasi inilah yang memikul dan menahan suatu beban yang bekerja diatasnya yaitu beban konstruksi atas. Tujuan dari Penelitian ini untuk menghitung daya dukung bored pile dari hasil sondir dan menghitung penurunan yang terjadi pada bored pile. Pada perhitungan daya dukung bored pile dilakukan dengan menggunakan metode Meyerhoff dan untuk perhitungan penurunan bore pile dilakukan dengan menggunakan metode Vesic. Berdasarkan data sondir hasil perhitungan daya dukung bore pile sebesar 426.86 ton dengan besar daya dukung ijinnya 138.52 ton. Analisis pondasi tiang juga memperhitungkan besar penurunan tiang. Penurunan tiang tunggal sebesar 0.02m dan penurunan tiang yang diijinkan sebesar 0.05m.\",\"PeriodicalId\":506363,\"journal\":{\"name\":\"Selodang Mayang: Jurnal Ilmiah Badan Perencanaan Pembangunan Daerah Kabupaten Indragiri Hilir\",\"volume\":\"209 S645\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-04-08\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Selodang Mayang: Jurnal Ilmiah Badan Perencanaan Pembangunan Daerah Kabupaten Indragiri Hilir\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.47521/selodangmayang.v10i1.360\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Selodang Mayang: Jurnal Ilmiah Badan Perencanaan Pembangunan Daerah Kabupaten Indragiri Hilir","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.47521/selodangmayang.v10i1.360","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

桩基础用于稳固土壤深度较大的建筑物。这种地基通常用于承载超重负荷的高层建筑(高层楼宇)。在开展任何建筑项目之前,第一项现场任务就是地基工程(下部结构)。地基是土木工程中的关键因素,因为它负责支撑和承受上部结构施加的荷载,即结构荷载。本研究的目的是根据土壤勘察结果计算钻孔灌注桩的承载力,并评估钻孔灌注桩发生的沉降。钻孔灌注桩的承载力计算采用 Meyerhoff 法,钻孔灌注桩的沉降计算采用 Vesic 法。根据土壤勘察数据,钻孔灌注桩的计算承载力为 426.86 吨,允许承载力为 138.52 吨。规划桩基时还要考虑到桩的沉降量。单根桩的沉降量为 0.02 米,允许沉降量为 0.05 米。 桩基础适用于硬土深度较大的建筑物。这种地基还经常用于承载巨大荷载的高层建筑。在进行建筑开发之前,首先要做的是地基工程(下部结构)。地基在土木工程中是一项非常重要的工作,因为正是地基承受和支撑着上面的荷载,即上层建筑荷载。本研究的目的是根据 sondir 结果计算钻孔灌注桩的承载力,并计算钻孔灌注桩出现的下滑。钻孔灌注桩承载力的计算采用 Meyerhoff 法,钻孔灌注桩承载力下降的计算采用 Vesic 法。根据 sondir 数据,钻孔灌注桩承载力的计算结果为 426.86 吨,允许承载力为 138.52 吨。桩基分析还考虑了桩的沉降量。单桩沉降量为 0.02 米,允许桩沉降量为 0.05 米。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
ANALISIS PONDASI BORED PILE PADA JEMBATAN AEK PEA RIHIT DI KABUPATEN TAPANULI UTARA
Pile foundations are used for buildings where the firm soil is located at a considerable depth. This type of foundation is often employed in the construction of tall buildings (high-rise buildings) that bear exceptionally heavy loads. Before undertaking any construction project, the first on-site task is foundation work (substructure). The foundation is a crucial element in civil engineering because it is responsible for supporting and carrying the load imposed by the upper structure, namely the structural load. The aim of this study is to calculate the bearing capacity of bored piles based on the results of soil investigation and to assess the settlement that occurs in bored piles. The calculation of the bearing capacity of bored piles is performed using the Meyerhoff method, and the settlement of bored piles is calculated using the Vesic method. According to the soil investigation data, the calculated bearing capacity of the bored pile is 426.86 tons, with an allowable bearing capacity of 138.52 tons. The planning of pile foundations also takes into account the magnitude of pile settlement. The settlement of a single pile is 0.02m, and the allowable settlement is 0.05m.   Pondasi tiang dipergunakan untuk bangunan dimana tanah kerasnya berada pada posisi yang cukup dalam. Jenis pondasi ini juga sering digunakan untuk konstruksi bangunan tinggi (high risebuilding) yang memikul beban yang sangat besar. Sebelum melaksanakan suatu pembangunan konstruksi yang pertama dikerjakan dilapangan adalah pekerjaan pondasi (struktur bawah). Pondasi merupakan suatu pekerjaan yang sangat penting dalam suatu pekerjaan teknik sipil, karena pondasi inilah yang memikul dan menahan suatu beban yang bekerja diatasnya yaitu beban konstruksi atas. Tujuan dari Penelitian ini untuk menghitung daya dukung bored pile dari hasil sondir dan menghitung penurunan yang terjadi pada bored pile. Pada perhitungan daya dukung bored pile dilakukan dengan menggunakan metode Meyerhoff dan untuk perhitungan penurunan bore pile dilakukan dengan menggunakan metode Vesic. Berdasarkan data sondir hasil perhitungan daya dukung bore pile sebesar 426.86 ton dengan besar daya dukung ijinnya 138.52 ton. Analisis pondasi tiang juga memperhitungkan besar penurunan tiang. Penurunan tiang tunggal sebesar 0.02m dan penurunan tiang yang diijinkan sebesar 0.05m.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信