{"title":"利用敏感性分析增加关键清障时间的高压直流输电布局研究","authors":"Gede Dyotha, Yogadipha Bagas, Ardyono Priyadi, V. Lystianingrum","doi":"10.12962/jaree.v8i1.370","DOIUrl":null,"url":null,"abstract":"Stability is the ability to go back to ordinary conditions after an interruption. Power transfer using an AC transmission system has some stability issues. Fast modulation of the HVDC transmission can escalate the transient stability of interconnected power systems thereby increasing the CCT. To calculate load flow sensitivity, use the load flow sensitivity analysis command in Powerfactory 15.1. The variable considered in this research is dφ/dP. In this paper, we will discuss the use of sensitivity analysis to specify the location of the HVDC transmission to increase the CCT value. By taking several samples that have high sensitivity values,namely channels 8-9 to 7-8 with an average cct change value of 0.555 s, mediumvalues, channels 5-8 to 9-6 have an average cct change of 0.234 s, and low fromchannels 6-4 to 9-4 with an average change of 0.109 s. The data above shows thata channel with a large sensitivity value will provide a higher increase in cct valuecomparedwith a low sensitivityvaluewhen paired with an HVDC.","PeriodicalId":518837,"journal":{"name":"JAREE (Journal on Advanced Research in Electrical Engineering)","volume":"408 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-01-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"HVDC Transmission Placement Study to Increase Critical Clearing Time Using Sensitivity Analysis\",\"authors\":\"Gede Dyotha, Yogadipha Bagas, Ardyono Priyadi, V. Lystianingrum\",\"doi\":\"10.12962/jaree.v8i1.370\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Stability is the ability to go back to ordinary conditions after an interruption. Power transfer using an AC transmission system has some stability issues. Fast modulation of the HVDC transmission can escalate the transient stability of interconnected power systems thereby increasing the CCT. To calculate load flow sensitivity, use the load flow sensitivity analysis command in Powerfactory 15.1. The variable considered in this research is dφ/dP. In this paper, we will discuss the use of sensitivity analysis to specify the location of the HVDC transmission to increase the CCT value. By taking several samples that have high sensitivity values,namely channels 8-9 to 7-8 with an average cct change value of 0.555 s, mediumvalues, channels 5-8 to 9-6 have an average cct change of 0.234 s, and low fromchannels 6-4 to 9-4 with an average change of 0.109 s. The data above shows thata channel with a large sensitivity value will provide a higher increase in cct valuecomparedwith a low sensitivityvaluewhen paired with an HVDC.\",\"PeriodicalId\":518837,\"journal\":{\"name\":\"JAREE (Journal on Advanced Research in Electrical Engineering)\",\"volume\":\"408 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-01-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"JAREE (Journal on Advanced Research in Electrical Engineering)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.12962/jaree.v8i1.370\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"JAREE (Journal on Advanced Research in Electrical Engineering)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.12962/jaree.v8i1.370","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

稳定性是指中断后恢复正常状态的能力。使用交流输电系统进行电力传输存在一些稳定性问题。高压直流输电的快速调制可提高互联电力系统的瞬态稳定性,从而增加 CCT。要计算负荷流灵敏度,请使用 Powerfactory 15.1 中的负荷流灵敏度分析命令。本研究考虑的变量为 dφ/dP。本文将讨论如何利用灵敏度分析来指定高压直流输电的位置,以提高 CCT 值。通过采集几个灵敏度值较高的样本,即通道 8-9 至 7-8,平均 CCT 变化值为 0.555 秒;灵敏度值中等的通道 5-8 至 9-6 平均 CCT 变化值为 0.234 秒;灵敏度值较低的通道 6-4 至 9-4,平均 CCT 变化值为 0.109 秒。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
HVDC Transmission Placement Study to Increase Critical Clearing Time Using Sensitivity Analysis
Stability is the ability to go back to ordinary conditions after an interruption. Power transfer using an AC transmission system has some stability issues. Fast modulation of the HVDC transmission can escalate the transient stability of interconnected power systems thereby increasing the CCT. To calculate load flow sensitivity, use the load flow sensitivity analysis command in Powerfactory 15.1. The variable considered in this research is dφ/dP. In this paper, we will discuss the use of sensitivity analysis to specify the location of the HVDC transmission to increase the CCT value. By taking several samples that have high sensitivity values,namely channels 8-9 to 7-8 with an average cct change value of 0.555 s, mediumvalues, channels 5-8 to 9-6 have an average cct change of 0.234 s, and low fromchannels 6-4 to 9-4 with an average change of 0.109 s. The data above shows thata channel with a large sensitivity value will provide a higher increase in cct valuecomparedwith a low sensitivityvaluewhen paired with an HVDC.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信