在 PT. XYZ 的 VCT 转子上应用价值流图的精益生产技术

Amanda Nur Fathimah, Winarno Winarno
{"title":"在 PT. XYZ 的 VCT 转子上应用价值流图的精益生产技术","authors":"Amanda Nur Fathimah, Winarno Winarno","doi":"10.31004/jutin.v7i1.24788","DOIUrl":null,"url":null,"abstract":"\nXYZ is an automotive component manufacturing company with two lines of production: the Shock Absorber Line and the VCT Line. One of the products on the VCT Line is the VCT rotor, with issues surrounding waste. Utilizing Lean Manufacturing approaches using the Waste Assessment Model and the Value Stream Analysis Tools is an effective way to solve issues and enhance efficiency in the VCT rotor system and production process at PT. XYZ. Total time savings as a result of the process change is 9,108.25 seconds, and the total lead time reduction in inventory is 34 days. The highest type of waste found in the VCT rotor is inventory, which accounts for 23,29% of the total waste. Overproduction contributes to 23,23% of the waste, while defect is responsible for 19,04%.\n","PeriodicalId":17759,"journal":{"name":"Jurnal Teknik Industri Terintegrasi","volume":"391 1-3","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-01-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Penerapan Lean Manufacturing Menggunakan Value Stream Mapping pada VCT Rotor di PT. XYZ\",\"authors\":\"Amanda Nur Fathimah, Winarno Winarno\",\"doi\":\"10.31004/jutin.v7i1.24788\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\nXYZ is an automotive component manufacturing company with two lines of production: the Shock Absorber Line and the VCT Line. One of the products on the VCT Line is the VCT rotor, with issues surrounding waste. Utilizing Lean Manufacturing approaches using the Waste Assessment Model and the Value Stream Analysis Tools is an effective way to solve issues and enhance efficiency in the VCT rotor system and production process at PT. XYZ. Total time savings as a result of the process change is 9,108.25 seconds, and the total lead time reduction in inventory is 34 days. The highest type of waste found in the VCT rotor is inventory, which accounts for 23,29% of the total waste. Overproduction contributes to 23,23% of the waste, while defect is responsible for 19,04%.\\n\",\"PeriodicalId\":17759,\"journal\":{\"name\":\"Jurnal Teknik Industri Terintegrasi\",\"volume\":\"391 1-3\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-01-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Teknik Industri Terintegrasi\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.31004/jutin.v7i1.24788\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Teknik Industri Terintegrasi","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31004/jutin.v7i1.24788","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

XYZ 是一家汽车零部件制造公司,有两条生产线:减震器生产线和 VCT 生产线。VCT 生产线的产品之一是 VCT 转子,存在浪费问题。在 PT.XYZ 的 VCT 转子系统和生产流程中,使用浪费评估模型和价值流分析工具的精益生产方法是解决问题和提高效率的有效途径。XYZ.流程改变后,总共节省了 9108.25 秒,库存周转时间总共减少了 34 天。VCT 转子的最大浪费是库存,占总浪费的 23.29%。过度生产造成的浪费占 23.23%,而缺陷造成的浪费占 19.04%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Penerapan Lean Manufacturing Menggunakan Value Stream Mapping pada VCT Rotor di PT. XYZ
XYZ is an automotive component manufacturing company with two lines of production: the Shock Absorber Line and the VCT Line. One of the products on the VCT Line is the VCT rotor, with issues surrounding waste. Utilizing Lean Manufacturing approaches using the Waste Assessment Model and the Value Stream Analysis Tools is an effective way to solve issues and enhance efficiency in the VCT rotor system and production process at PT. XYZ. Total time savings as a result of the process change is 9,108.25 seconds, and the total lead time reduction in inventory is 34 days. The highest type of waste found in the VCT rotor is inventory, which accounts for 23,29% of the total waste. Overproduction contributes to 23,23% of the waste, while defect is responsible for 19,04%.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信