{"title":"建筑业时间管理新方法:数学分析","authors":"Ali Alsaedi, S. Naimi","doi":"10.18280/mmep.110123","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":37338,"journal":{"name":"Mathematical Modelling of Engineering Problems","volume":"90 12","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-01-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A Novel Time Management Approach for the Construction Industry: A Mathematical Analysis\",\"authors\":\"Ali Alsaedi, S. Naimi\",\"doi\":\"10.18280/mmep.110123\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":37338,\"journal\":{\"name\":\"Mathematical Modelling of Engineering Problems\",\"volume\":\"90 12\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-01-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Mathematical Modelling of Engineering Problems\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.18280/mmep.110123\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Mathematical Modelling of Engineering Problems","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.18280/mmep.110123","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Engineering","Score":null,"Total":0}