{"title":"塔甘罗格冶金厂露天车间连铸部结构的工业安全检查","authors":"Mikhail I. Farfel, M. Gukova, D. Kondrashov, Lidiya S. Rozhkova","doi":"10.37153/2618-9283-2024-1-49-64","DOIUrl":null,"url":null,"abstract":"The working draft of the main building of the department of continuous casting of billets (ONLZ) of the open-hearth shop of JSC Tagmet at the stage of \"KM\" was developed by the DKO of JSC UkrNIIPSK in 2000. Taking into account the design decisions taken and the need to ensure high reliability of structures arising from the specifics of metallurgical production (when installing a heavy duty crane (7K) with a lifting capacity of 225+63/20t at a significant height of the crane rail head – 27 m) in 2001, the customer (JSC Tagmet) decided to carry out an expert examination of design solutions for the main structures of the building frame and engaged the Central Research Institute of Building Structures named after V.A. Kucherenko, who, since 1995, has already conducted surveys of other workshops of the plant, built back in the XIX century, for this work. Then the correctness of the choice of sections and lengths of the elements of the main load-bearing structures was checked and the load-bearing capacity of these elements was assessed. The forces in the elements obtained as a result of carrying out a verification calculation on a computer with the refinement of the design scheme, the applied loads and the quality of steel used in the elements were used. The article presents the reasons for the conduct and results of the industrial safety examination carried out in 2011, a new department was put into operation by 2005, attached to the open-hearth shop.","PeriodicalId":137140,"journal":{"name":"Earthquake Engineering. Construction Safety","volume":"31 8","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-02-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Examination of industrial safety of structures of the continuous casting Department of the open-hearth shop of the Taganrog Metallurgical Plant\",\"authors\":\"Mikhail I. Farfel, M. Gukova, D. Kondrashov, Lidiya S. Rozhkova\",\"doi\":\"10.37153/2618-9283-2024-1-49-64\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The working draft of the main building of the department of continuous casting of billets (ONLZ) of the open-hearth shop of JSC Tagmet at the stage of \\\"KM\\\" was developed by the DKO of JSC UkrNIIPSK in 2000. Taking into account the design decisions taken and the need to ensure high reliability of structures arising from the specifics of metallurgical production (when installing a heavy duty crane (7K) with a lifting capacity of 225+63/20t at a significant height of the crane rail head – 27 m) in 2001, the customer (JSC Tagmet) decided to carry out an expert examination of design solutions for the main structures of the building frame and engaged the Central Research Institute of Building Structures named after V.A. Kucherenko, who, since 1995, has already conducted surveys of other workshops of the plant, built back in the XIX century, for this work. Then the correctness of the choice of sections and lengths of the elements of the main load-bearing structures was checked and the load-bearing capacity of these elements was assessed. The forces in the elements obtained as a result of carrying out a verification calculation on a computer with the refinement of the design scheme, the applied loads and the quality of steel used in the elements were used. The article presents the reasons for the conduct and results of the industrial safety examination carried out in 2011, a new department was put into operation by 2005, attached to the open-hearth shop.\",\"PeriodicalId\":137140,\"journal\":{\"name\":\"Earthquake Engineering. Construction Safety\",\"volume\":\"31 8\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-02-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Earthquake Engineering. Construction Safety\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.37153/2618-9283-2024-1-49-64\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Earthquake Engineering. Construction Safety","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.37153/2618-9283-2024-1-49-64","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

2000年,"KM "阶段的 "Tagmet "股份公司露天开采车间钢坯连铸部(ONLZ)主楼的工作草案由 "乌克兰国际冶金生产协会 "股份公司的DKO制定。2001 年,客户(塔格梅特股份公司)考虑到所做的设计决定以及确保冶金生产特殊性所产生的结构高可靠性的需要(在安装起重量为 225+63/20 吨的重型起重机(7K)时,起重机轨头的高度为 27 米),决定对建筑框架主要结构的设计方案进行专家审查,并聘请了以 V. A. Kucherenko 命名的建筑结构中央研究所,该研究所是乌克兰最大的建筑结构研究所。A. Kucherenko 的名字命名的建筑结构中央研究所,该研究所自 1995 年起就开始对建于十九世纪的工厂其他车间进行勘察。随后,对主要承重结构构件的截面和长度选择的正确性进行了检查,并对这些构件的承重能力进行了评估。在对设计方案、外加荷载和构件所用钢材质量进行改进后,使用计算机进行了验证计算,得出了构件的受力情况。文章介绍了 2011 年进行工业安全检查的原因和结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Examination of industrial safety of structures of the continuous casting Department of the open-hearth shop of the Taganrog Metallurgical Plant
The working draft of the main building of the department of continuous casting of billets (ONLZ) of the open-hearth shop of JSC Tagmet at the stage of "KM" was developed by the DKO of JSC UkrNIIPSK in 2000. Taking into account the design decisions taken and the need to ensure high reliability of structures arising from the specifics of metallurgical production (when installing a heavy duty crane (7K) with a lifting capacity of 225+63/20t at a significant height of the crane rail head – 27 m) in 2001, the customer (JSC Tagmet) decided to carry out an expert examination of design solutions for the main structures of the building frame and engaged the Central Research Institute of Building Structures named after V.A. Kucherenko, who, since 1995, has already conducted surveys of other workshops of the plant, built back in the XIX century, for this work. Then the correctness of the choice of sections and lengths of the elements of the main load-bearing structures was checked and the load-bearing capacity of these elements was assessed. The forces in the elements obtained as a result of carrying out a verification calculation on a computer with the refinement of the design scheme, the applied loads and the quality of steel used in the elements were used. The article presents the reasons for the conduct and results of the industrial safety examination carried out in 2011, a new department was put into operation by 2005, attached to the open-hearth shop.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信