{"title":"超过规定竣工时间造成的损失及其对项目状况的影响和使用服务的延误","authors":"Abdulrahman Al-Mafrachi, S. Naimi","doi":"10.18280/mmep.110212","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":37338,"journal":{"name":"Mathematical Modelling of Engineering Problems","volume":"60 12","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-02-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Losses Resulting from Exceeding the Specified Time for Completion and Its Impact on the Status of the Project and Delay in Utilizing Services\",\"authors\":\"Abdulrahman Al-Mafrachi, S. Naimi\",\"doi\":\"10.18280/mmep.110212\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":37338,\"journal\":{\"name\":\"Mathematical Modelling of Engineering Problems\",\"volume\":\"60 12\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-02-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Mathematical Modelling of Engineering Problems\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.18280/mmep.110212\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Mathematical Modelling of Engineering Problems","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.18280/mmep.110212","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Engineering","Score":null,"Total":0}