{"title":"自动生成从 CAD 到 BIM 的洗手间卫生管道系统","authors":"Minso Shin, Seonghun Park, Bonsang Koo, Tae Wan Kim","doi":"10.1093/jcde/qwae021","DOIUrl":null,"url":null,"abstract":"\n Mechanical, electrical, and plumbing (MEP) system experts often have difficulties in converting their designs, in computer-aided design (CAD), into building information models (BIM) owing to excessive repetitive work, lack of BIM skilled workers, frequent BIM recreations, etc. Therefore, this study aimed to formalize the CAD-to-BIM process of MEP systems, focusing on sanitary plumbing system, including soil, drain system, hot water supply, and cold water supply system. Each system's process is composed of a combination of the following five common modules: pipeline processing module, pipe connection module, initial level setting module, addition riser nipple module, and clash resolution module. Consequently, a prototype developed based on the formalized process produced a sanitary plumbing BIM model that is identical to the CAD drawings and has no clashes. This study contributes to the MEP BIM theory by identifying considerations for CAD-to-BIM conversion of sanitary plumbing system and formalizing the process reflecting them.","PeriodicalId":513408,"journal":{"name":"J. Comput. Des. Eng.","volume":"601 1","pages":"70-84"},"PeriodicalIF":0.0000,"publicationDate":"2024-02-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Automated CAD-to-BIM generation of restroom sanitary plumbing system\",\"authors\":\"Minso Shin, Seonghun Park, Bonsang Koo, Tae Wan Kim\",\"doi\":\"10.1093/jcde/qwae021\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Mechanical, electrical, and plumbing (MEP) system experts often have difficulties in converting their designs, in computer-aided design (CAD), into building information models (BIM) owing to excessive repetitive work, lack of BIM skilled workers, frequent BIM recreations, etc. Therefore, this study aimed to formalize the CAD-to-BIM process of MEP systems, focusing on sanitary plumbing system, including soil, drain system, hot water supply, and cold water supply system. Each system's process is composed of a combination of the following five common modules: pipeline processing module, pipe connection module, initial level setting module, addition riser nipple module, and clash resolution module. Consequently, a prototype developed based on the formalized process produced a sanitary plumbing BIM model that is identical to the CAD drawings and has no clashes. This study contributes to the MEP BIM theory by identifying considerations for CAD-to-BIM conversion of sanitary plumbing system and formalizing the process reflecting them.\",\"PeriodicalId\":513408,\"journal\":{\"name\":\"J. Comput. Des. Eng.\",\"volume\":\"601 1\",\"pages\":\"70-84\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-02-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"J. Comput. Des. Eng.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1093/jcde/qwae021\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"J. Comput. Des. Eng.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1093/jcde/qwae021","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Automated CAD-to-BIM generation of restroom sanitary plumbing system
Mechanical, electrical, and plumbing (MEP) system experts often have difficulties in converting their designs, in computer-aided design (CAD), into building information models (BIM) owing to excessive repetitive work, lack of BIM skilled workers, frequent BIM recreations, etc. Therefore, this study aimed to formalize the CAD-to-BIM process of MEP systems, focusing on sanitary plumbing system, including soil, drain system, hot water supply, and cold water supply system. Each system's process is composed of a combination of the following five common modules: pipeline processing module, pipe connection module, initial level setting module, addition riser nipple module, and clash resolution module. Consequently, a prototype developed based on the formalized process produced a sanitary plumbing BIM model that is identical to the CAD drawings and has no clashes. This study contributes to the MEP BIM theory by identifying considerations for CAD-to-BIM conversion of sanitary plumbing system and formalizing the process reflecting them.