{"title":"用于提高产量的定向酸性刺激技术 - 蒙特尼案例研究","authors":"F. T. Smith, Z. Ramji","doi":"10.2118/218081-ms","DOIUrl":null,"url":null,"abstract":"\n A safe and cost-effective method of stimulating a multi-zone hydrocarbon producing well is presented whereby a tool containing dry chemical is deployed downhole via wireline. An extended exothermic reaction is initiated downhole which generates acid vapour at a target depth in front of the perforated interval. This method allows for each interval to be uniquely treated with specific acid blends and order of operations.\n A typical well in the field is characterized as a vertical oil producing well with two existing perforated intervals. The top interval is a 3½ foot perforated interval in the Worsley Dolomite with a permeability of 500 - 1000 mD and 40 - 45% porosity. Approximately 50 feet below is a 3 ½ foot perforated Worsley Siltstone interval with 18-20% porosity and permeability of 5 - 10 mD. The 5 ½\" 14 lbs/ft cemented production casing is set at approximately 3000 ft.\n Prior to acidizing, a workover operation was completed where the 2 7/8\" tubing was pulled. The order of operations was to first perforate a new 20-foot interval in the Montney that was 70 feet below the Worsley Siltstone. Subsequently, the tightest interval – the Worsley Siltstone – was then treated using an HCl tool deployed via wireline which acted as a pre-flush treatment. This removed any existing scale and provided an HCl rich environment to minimize the risk or precipitation of CaF2 when later acidizing with Mud Acid. After the HCl pre-flush, an HCl/HF tool was then deployed. The next interval was the Worsley Dolomite which was treated with HCl followed by the newly perforated 20-foot Montney interval which was also treated with HCl. This entire operation is completed in 8 hours.\n Prior to treatment, the candidate wells were producing on average 6 bbl/day and had shown a declining trend over a period of several years. Prior treatments were to bullhead 15% HCl acid and it was believed that the acid was not all going to the desired zone. Using the new method, a total of 7 wells were treated - one well per day - and the average increase in production increase was 342% approximately 60 days post-treatment. The production increase was sustained with wells maintaining an average increase in production of 183% approximately 9 months post-treatment.\n This method of acidizing has supplanted the previous acidizing method - bullheading of 15% HCl - due to its sustained production enhancement and cost-effectiveness.","PeriodicalId":517551,"journal":{"name":"Day 2 Thu, March 14, 2024","volume":"3 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-03-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Targeted Acid Stimulation Technique for Production Enhancement – A Montney Case Study\",\"authors\":\"F. T. Smith, Z. Ramji\",\"doi\":\"10.2118/218081-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n A safe and cost-effective method of stimulating a multi-zone hydrocarbon producing well is presented whereby a tool containing dry chemical is deployed downhole via wireline. An extended exothermic reaction is initiated downhole which generates acid vapour at a target depth in front of the perforated interval. This method allows for each interval to be uniquely treated with specific acid blends and order of operations.\\n A typical well in the field is characterized as a vertical oil producing well with two existing perforated intervals. The top interval is a 3½ foot perforated interval in the Worsley Dolomite with a permeability of 500 - 1000 mD and 40 - 45% porosity. Approximately 50 feet below is a 3 ½ foot perforated Worsley Siltstone interval with 18-20% porosity and permeability of 5 - 10 mD. The 5 ½\\\" 14 lbs/ft cemented production casing is set at approximately 3000 ft.\\n Prior to acidizing, a workover operation was completed where the 2 7/8\\\" tubing was pulled. The order of operations was to first perforate a new 20-foot interval in the Montney that was 70 feet below the Worsley Siltstone. Subsequently, the tightest interval – the Worsley Siltstone – was then treated using an HCl tool deployed via wireline which acted as a pre-flush treatment. This removed any existing scale and provided an HCl rich environment to minimize the risk or precipitation of CaF2 when later acidizing with Mud Acid. After the HCl pre-flush, an HCl/HF tool was then deployed. The next interval was the Worsley Dolomite which was treated with HCl followed by the newly perforated 20-foot Montney interval which was also treated with HCl. This entire operation is completed in 8 hours.\\n Prior to treatment, the candidate wells were producing on average 6 bbl/day and had shown a declining trend over a period of several years. Prior treatments were to bullhead 15% HCl acid and it was believed that the acid was not all going to the desired zone. Using the new method, a total of 7 wells were treated - one well per day - and the average increase in production increase was 342% approximately 60 days post-treatment. The production increase was sustained with wells maintaining an average increase in production of 183% approximately 9 months post-treatment.\\n This method of acidizing has supplanted the previous acidizing method - bullheading of 15% HCl - due to its sustained production enhancement and cost-effectiveness.\",\"PeriodicalId\":517551,\"journal\":{\"name\":\"Day 2 Thu, March 14, 2024\",\"volume\":\"3 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-03-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 2 Thu, March 14, 2024\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/218081-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Thu, March 14, 2024","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/218081-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

介绍了一种安全、经济高效的多区碳氢化合物生产井刺激方法,即通过钢丝绳在井下部署含有干化学物质的工具。井下开始扩展放热反应,在射孔层前的目标深度产生酸蒸汽。通过这种方法,可以使用特定的酸混合物和操作顺序对每个间隔进行独特处理。该油田的一口典型油井是一口垂直产油井,现有两个穿孔层。最上层是沃斯利白云岩中的 3½ 英尺穿孔层,渗透率为 500 - 1000 mD,孔隙度为 40 - 45%。下面约 50 英尺处是一个 3 ½ 英尺的沃斯利粉砂岩穿孔层,孔隙率为 18-20% ,渗透率为 5 - 10 mD。5 ½" 14 磅/英尺的水泥生产套管设置在大约 3000 英尺处。在酸化之前,完成了一次修井作业,拔出了 2 7/8 英寸的油管。作业顺序是,首先在沃斯利粉砂岩下 70 英尺处的蒙特尼岩层中打出一个新的 20 英尺间隔。随后,在最狭窄的区间(沃尔斯利粉砂岩)使用盐酸工具进行处理,该工具通过钢丝绳部署,起到了预冲洗处理的作用。这不仅清除了现有的水垢,还提供了一个富含盐酸的环境,以便在随后使用泥浆酸进行酸化时最大限度地降低 CaF2 沉淀的风险。盐酸预冲洗后,部署了盐酸/高频工具。下一个井段是沃斯利白云岩,使用盐酸进行处理,然后是新打孔的 20 英尺蒙特尼井段,也使用盐酸进行处理。整个作业在 8 小时内完成。在进行处理之前,候选油井的平均产量为 6 桶/天,并在几年内呈下降趋势。之前的处理采用的是牛头 15%的盐酸,据信酸液并没有全部进入所需的区域。采用新方法后,共处理了 7 口井,每天处理一口井,处理后约 60 天,平均增产 342%。处理后约 9 个月,油井的产量持续增加,平均增幅达 183%。这种酸化方法因其持续的增产效果和成本效益,取代了之前的酸化方法--15% HCl 牛头酸化法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Targeted Acid Stimulation Technique for Production Enhancement – A Montney Case Study
A safe and cost-effective method of stimulating a multi-zone hydrocarbon producing well is presented whereby a tool containing dry chemical is deployed downhole via wireline. An extended exothermic reaction is initiated downhole which generates acid vapour at a target depth in front of the perforated interval. This method allows for each interval to be uniquely treated with specific acid blends and order of operations. A typical well in the field is characterized as a vertical oil producing well with two existing perforated intervals. The top interval is a 3½ foot perforated interval in the Worsley Dolomite with a permeability of 500 - 1000 mD and 40 - 45% porosity. Approximately 50 feet below is a 3 ½ foot perforated Worsley Siltstone interval with 18-20% porosity and permeability of 5 - 10 mD. The 5 ½" 14 lbs/ft cemented production casing is set at approximately 3000 ft. Prior to acidizing, a workover operation was completed where the 2 7/8" tubing was pulled. The order of operations was to first perforate a new 20-foot interval in the Montney that was 70 feet below the Worsley Siltstone. Subsequently, the tightest interval – the Worsley Siltstone – was then treated using an HCl tool deployed via wireline which acted as a pre-flush treatment. This removed any existing scale and provided an HCl rich environment to minimize the risk or precipitation of CaF2 when later acidizing with Mud Acid. After the HCl pre-flush, an HCl/HF tool was then deployed. The next interval was the Worsley Dolomite which was treated with HCl followed by the newly perforated 20-foot Montney interval which was also treated with HCl. This entire operation is completed in 8 hours. Prior to treatment, the candidate wells were producing on average 6 bbl/day and had shown a declining trend over a period of several years. Prior treatments were to bullhead 15% HCl acid and it was believed that the acid was not all going to the desired zone. Using the new method, a total of 7 wells were treated - one well per day - and the average increase in production increase was 342% approximately 60 days post-treatment. The production increase was sustained with wells maintaining an average increase in production of 183% approximately 9 months post-treatment. This method of acidizing has supplanted the previous acidizing method - bullheading of 15% HCl - due to its sustained production enhancement and cost-effectiveness.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信