A. V. Emelyanov, M. A. Tkachuk, G. V. Nesterov, A. A. Yushin, V. V. Viatchennikov
{"title":"北极地区海港建设所需的桩基和焊接钢管板桩的生产和交付发展情况","authors":"A. V. Emelyanov, M. A. Tkachuk, G. V. Nesterov, A. A. Yushin, V. V. Viatchennikov","doi":"10.1007/s10749-024-01722-0","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":509436,"journal":{"name":"Power Technology and Engineering","volume":"1 18","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-03-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Development of the Manufacture and Delivery of Piles and Welded Pipe Sheet Piling for the Construction of Seaports in the Arctic Zone\",\"authors\":\"A. V. Emelyanov, M. A. Tkachuk, G. V. Nesterov, A. A. Yushin, V. V. Viatchennikov\",\"doi\":\"10.1007/s10749-024-01722-0\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":509436,\"journal\":{\"name\":\"Power Technology and Engineering\",\"volume\":\"1 18\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-03-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Power Technology and Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1007/s10749-024-01722-0\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Power Technology and Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1007/s10749-024-01722-0","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}