将利润配给和采矿租金边界 I 和 II 评估作为管理采矿项目的经济方法

S.N. Rakhmatov, N. V. Korobovsky, T.Sh. Pazylov, K. Z. Kurmanaliev
{"title":"将利润配给和采矿租金边界 I 和 II 评估作为管理采矿项目的经济方法","authors":"S.N. Rakhmatov, N. V. Korobovsky, T.Sh. Pazylov, K. Z. Kurmanaliev","doi":"10.30686/1609-9192-2024-1-112-119","DOIUrl":null,"url":null,"abstract":"Based on the study of empirical economic data obtained during operation of a large-scale gold ore deposit, a model was built to justify the hypothesis about profit rationing, the formation and division of the differential rent I and II. The model identifies the increase in the equity premium as the sum of profit and rent II for investment capital and rent I for the owner of the resources. Boundaries of the capital movement are highlighted for the terms of service agreements with and without risk. The obtained values are attractive for the investment and/or operating side, and the resource owner during the field development. The approach based on profit rationing, assessment and division of the mining rent by types: (1) will help to introduce civil law relations in subsoil use based on service contracts with or without risk; (2) takes into account the value of reserves and resources in their mining and dividing them into ownerships, resources and investment capital; (3) introduces a new approach to attractiveness of deposit mining, both in attracting investment capital and for the operating companies based on a risk-free contract with retention of the ownership of resources with the country of the resource owner; (4) enhances the investment and production attractiveness of deposit mining providing incentives to introduce innovation technologies and improve the efficiency. It is possible to create an economic method for managing and regulating the mining industry of the Kyrgyz Republic based on the proposed approach.","PeriodicalId":506182,"journal":{"name":"Mining Industry Journal (Gornay Promishlennost)","volume":"19 38","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-03-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Assessment of profit rationing and boundaries of mining rent I and II as an economic method for regulating a mining project\",\"authors\":\"S.N. Rakhmatov, N. V. Korobovsky, T.Sh. Pazylov, K. Z. Kurmanaliev\",\"doi\":\"10.30686/1609-9192-2024-1-112-119\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Based on the study of empirical economic data obtained during operation of a large-scale gold ore deposit, a model was built to justify the hypothesis about profit rationing, the formation and division of the differential rent I and II. The model identifies the increase in the equity premium as the sum of profit and rent II for investment capital and rent I for the owner of the resources. Boundaries of the capital movement are highlighted for the terms of service agreements with and without risk. The obtained values are attractive for the investment and/or operating side, and the resource owner during the field development. The approach based on profit rationing, assessment and division of the mining rent by types: (1) will help to introduce civil law relations in subsoil use based on service contracts with or without risk; (2) takes into account the value of reserves and resources in their mining and dividing them into ownerships, resources and investment capital; (3) introduces a new approach to attractiveness of deposit mining, both in attracting investment capital and for the operating companies based on a risk-free contract with retention of the ownership of resources with the country of the resource owner; (4) enhances the investment and production attractiveness of deposit mining providing incentives to introduce innovation technologies and improve the efficiency. It is possible to create an economic method for managing and regulating the mining industry of the Kyrgyz Republic based on the proposed approach.\",\"PeriodicalId\":506182,\"journal\":{\"name\":\"Mining Industry Journal (Gornay Promishlennost)\",\"volume\":\"19 38\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-03-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Mining Industry Journal (Gornay Promishlennost)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.30686/1609-9192-2024-1-112-119\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Mining Industry Journal (Gornay Promishlennost)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30686/1609-9192-2024-1-112-119","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在对一个大型金矿床运营期间获得的经验经济数据进行研究的基础上,建立了一个模型来证明关于利润配给、差额租金 I 和 II 的形成和划分的假设。该模型将股本溢价的增加确定为投资资本的利润和租金 II 的总和,以及资源所有者的租金 I 的总和。对于有风险和无风险的服务协议条款,资本流动的边界得到了强调。在油田开发过程中,所获得的价值对投资和/或运营方以及资源所有者都具有吸引力。基于利润配给、评估和按类型划分采矿租金的方法:(1)有助于在有风险或无风险的服务合同的基础上,在底土使用中引入民法关系;(2)考虑到储量和资源在开采中的价值,并将其划分为所有权、资源和投资资本;(3)引入一种新的矿床开采吸引力方法,既能吸引投资资本,又能在与资源所有者所在国签订的保留资源所有权的无风险合同的基础上,吸引运营公司;(4)增强矿床开采的投资和生产吸引力,激励引进创新技术和提高效率。根据所建议的方法,有可能为吉尔吉斯共和国采矿业的管理和调控制定一种经济方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Assessment of profit rationing and boundaries of mining rent I and II as an economic method for regulating a mining project
Based on the study of empirical economic data obtained during operation of a large-scale gold ore deposit, a model was built to justify the hypothesis about profit rationing, the formation and division of the differential rent I and II. The model identifies the increase in the equity premium as the sum of profit and rent II for investment capital and rent I for the owner of the resources. Boundaries of the capital movement are highlighted for the terms of service agreements with and without risk. The obtained values are attractive for the investment and/or operating side, and the resource owner during the field development. The approach based on profit rationing, assessment and division of the mining rent by types: (1) will help to introduce civil law relations in subsoil use based on service contracts with or without risk; (2) takes into account the value of reserves and resources in their mining and dividing them into ownerships, resources and investment capital; (3) introduces a new approach to attractiveness of deposit mining, both in attracting investment capital and for the operating companies based on a risk-free contract with retention of the ownership of resources with the country of the resource owner; (4) enhances the investment and production attractiveness of deposit mining providing incentives to introduce innovation technologies and improve the efficiency. It is possible to create an economic method for managing and regulating the mining industry of the Kyrgyz Republic based on the proposed approach.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信