大型信息系统项目的风险管理

Diego Armando Castillo-Ñopo, Khateryn Fiorela Loyola-Blanco, Raul Castro-Marca, Gian Davor La Rosa-Gavino, Jherson Giovanny Aragón-Retuerto, Hegel Alvaro Rafael-Sifuentes, William Joel Marín Rodriguez
{"title":"大型信息系统项目的风险管理","authors":"Diego Armando Castillo-Ñopo, Khateryn Fiorela Loyola-Blanco, Raul Castro-Marca, Gian Davor La Rosa-Gavino, Jherson Giovanny Aragón-Retuerto, Hegel Alvaro Rafael-Sifuentes, William Joel Marín Rodriguez","doi":"10.4108/eetsis.4608","DOIUrl":null,"url":null,"abstract":"This article deals with project management in information systems, whose relevance lies in the vital importance of these systems in modern companies. Information systems are essential for decision making and data management in today's interconnected world. Project management, on the other hand, coordinates elements such as scope, resources, costs, schedules and risks to achieve defined objectives. The systems development life cycle (SDLC) structures the process, encompassing phases such as scope definition, planning, execution, monitoring and closure. These phases are integrated with risk management, which identifies, evaluates and mitigates threats and opportunities. Mitigation strategies act before adversity, while contingency planning prepares for the unforeseen. That is why risk management is integrated throughout the project life cycle to anticipate and address challenges. The combination of both aspects is critical in a constantly evolving technology environment. In addition, organizational culture and communication play a critical role. A culture of awareness and accountability, transparency in communication and active stakeholder participation are essential. Training and continuous adaptation allow learning from past experiences and improving practices.","PeriodicalId":155438,"journal":{"name":"ICST Transactions on Scalable Information Systems","volume":" 22","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-03-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Risk management in large-scale information system projects\",\"authors\":\"Diego Armando Castillo-Ñopo, Khateryn Fiorela Loyola-Blanco, Raul Castro-Marca, Gian Davor La Rosa-Gavino, Jherson Giovanny Aragón-Retuerto, Hegel Alvaro Rafael-Sifuentes, William Joel Marín Rodriguez\",\"doi\":\"10.4108/eetsis.4608\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This article deals with project management in information systems, whose relevance lies in the vital importance of these systems in modern companies. Information systems are essential for decision making and data management in today's interconnected world. Project management, on the other hand, coordinates elements such as scope, resources, costs, schedules and risks to achieve defined objectives. The systems development life cycle (SDLC) structures the process, encompassing phases such as scope definition, planning, execution, monitoring and closure. These phases are integrated with risk management, which identifies, evaluates and mitigates threats and opportunities. Mitigation strategies act before adversity, while contingency planning prepares for the unforeseen. That is why risk management is integrated throughout the project life cycle to anticipate and address challenges. The combination of both aspects is critical in a constantly evolving technology environment. In addition, organizational culture and communication play a critical role. A culture of awareness and accountability, transparency in communication and active stakeholder participation are essential. Training and continuous adaptation allow learning from past experiences and improving practices.\",\"PeriodicalId\":155438,\"journal\":{\"name\":\"ICST Transactions on Scalable Information Systems\",\"volume\":\" 22\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-03-22\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"ICST Transactions on Scalable Information Systems\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4108/eetsis.4608\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"ICST Transactions on Scalable Information Systems","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4108/eetsis.4608","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文论述信息系统中的项目管理,其相关性在于这些系统在现代公司中的极端重要性。在当今相互联系的世界中,信息系统对于决策和数据管理至关重要。而项目管理则是协调范围、资源、成本、进度和风险等要素,以实现既定目标。系统开发生命周期(SDLC)构建了这一过程,包括范围定义、规划、执行、监控和结束等阶段。这些阶段与风险管理相结合,后者负责识别、评估和缓解威胁与机遇。缓解战略在逆境之前采取行动,而应急计划则为不可预见的情况做好准备。这就是为什么风险管理要贯穿整个项目生命周期,以预测和应对挑战。在不断发展的技术环境中,这两方面的结合至关重要。此外,组织文化和沟通也起着至关重要的作用。意识和责任文化、沟通的透明度以及利益相关者的积极参与都至关重要。通过培训和不断调整,可以从过去的经验中吸取教训,改进做法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Risk management in large-scale information system projects
This article deals with project management in information systems, whose relevance lies in the vital importance of these systems in modern companies. Information systems are essential for decision making and data management in today's interconnected world. Project management, on the other hand, coordinates elements such as scope, resources, costs, schedules and risks to achieve defined objectives. The systems development life cycle (SDLC) structures the process, encompassing phases such as scope definition, planning, execution, monitoring and closure. These phases are integrated with risk management, which identifies, evaluates and mitigates threats and opportunities. Mitigation strategies act before adversity, while contingency planning prepares for the unforeseen. That is why risk management is integrated throughout the project life cycle to anticipate and address challenges. The combination of both aspects is critical in a constantly evolving technology environment. In addition, organizational culture and communication play a critical role. A culture of awareness and accountability, transparency in communication and active stakeholder participation are essential. Training and continuous adaptation allow learning from past experiences and improving practices.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信