为沙特阿拉伯建筑项目承包商开发绩效评估模型

IF 1.5 4区 工程技术 Q3 CONSTRUCTION & BUILDING TECHNOLOGY
Ghasan Alfalah, Saad Aldajani, Nehal Elshaboury, Abobakr Al-Sakkaf, Othman Alshamrani
{"title":"为沙特阿拉伯建筑项目承包商开发绩效评估模型","authors":"Ghasan Alfalah, Saad Aldajani, Nehal Elshaboury, Abobakr Al-Sakkaf, Othman Alshamrani","doi":"10.1155/2024/8780539","DOIUrl":null,"url":null,"abstract":"Saudi Arabia leads the Gulf Cooperation Council countries in the construction industry, with 63% of the region’s future projects and $1.4 trillion in building and transportation projects. Previous studies have shown that 60% of construction projects are behind the schedule. One of the reasons behind this delay is the inappropriate selection of contractors for construction projects; therefore, the development of a contractor performance assessment model is needed for construction projects in Saudi Arabia. The proposed model includes the major key performance indicators (KPIs) used to measure contractors’ performance in construction projects. Afterward, a questionnaire is conducted with construction professionals to recommend the important KPIs to consider while developing the model. The analytic hierarchy process decision-making technique is applied for assessing relative priorities among the identified KPIs based on expert or decision-maker consensus. The results show that the time category is the most important in selecting the best contractor, emphasizing the significance of timely project completion.","PeriodicalId":7242,"journal":{"name":"Advances in Civil Engineering","volume":null,"pages":null},"PeriodicalIF":1.5000,"publicationDate":"2024-03-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Development of a Performance Assessment Model for Contractors in Saudi Arabian Construction Projects\",\"authors\":\"Ghasan Alfalah, Saad Aldajani, Nehal Elshaboury, Abobakr Al-Sakkaf, Othman Alshamrani\",\"doi\":\"10.1155/2024/8780539\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Saudi Arabia leads the Gulf Cooperation Council countries in the construction industry, with 63% of the region’s future projects and $1.4 trillion in building and transportation projects. Previous studies have shown that 60% of construction projects are behind the schedule. One of the reasons behind this delay is the inappropriate selection of contractors for construction projects; therefore, the development of a contractor performance assessment model is needed for construction projects in Saudi Arabia. The proposed model includes the major key performance indicators (KPIs) used to measure contractors’ performance in construction projects. Afterward, a questionnaire is conducted with construction professionals to recommend the important KPIs to consider while developing the model. The analytic hierarchy process decision-making technique is applied for assessing relative priorities among the identified KPIs based on expert or decision-maker consensus. The results show that the time category is the most important in selecting the best contractor, emphasizing the significance of timely project completion.\",\"PeriodicalId\":7242,\"journal\":{\"name\":\"Advances in Civil Engineering\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.5000,\"publicationDate\":\"2024-03-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Advances in Civil Engineering\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.1155/2024/8780539\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"CONSTRUCTION & BUILDING TECHNOLOGY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Advances in Civil Engineering","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1155/2024/8780539","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
引用次数: 0

摘要

沙特阿拉伯的建筑业在海湾合作委员会国家中处于领先地位,占该地区未来项目的 63%,建筑和交通项目总投资达 1.4 万亿美元。以往的研究表明,60% 的建筑项目落后于计划进度。造成工期延误的原因之一是建筑项目的承包商选择不当;因此,需要为沙特阿拉伯的建筑项目开发一个承包商绩效评估模型。建议的模型包括用于衡量建筑项目承包商绩效的主要关键绩效指标(KPI)。随后,对建筑专业人员进行了问卷调查,以推荐在开发模型时需要考虑的重要关键绩效指标。在专家或决策者达成共识的基础上,运用层次分析法决策技术评估所确定的 KPI 之间的相对优先级。结果表明,在选择最佳承包商时,时间类指标最为重要,强调了及时完成项目的重要性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Development of a Performance Assessment Model for Contractors in Saudi Arabian Construction Projects
Saudi Arabia leads the Gulf Cooperation Council countries in the construction industry, with 63% of the region’s future projects and $1.4 trillion in building and transportation projects. Previous studies have shown that 60% of construction projects are behind the schedule. One of the reasons behind this delay is the inappropriate selection of contractors for construction projects; therefore, the development of a contractor performance assessment model is needed for construction projects in Saudi Arabia. The proposed model includes the major key performance indicators (KPIs) used to measure contractors’ performance in construction projects. Afterward, a questionnaire is conducted with construction professionals to recommend the important KPIs to consider while developing the model. The analytic hierarchy process decision-making technique is applied for assessing relative priorities among the identified KPIs based on expert or decision-maker consensus. The results show that the time category is the most important in selecting the best contractor, emphasizing the significance of timely project completion.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Advances in Civil Engineering
Advances in Civil Engineering Engineering-Civil and Structural Engineering
CiteScore
4.00
自引率
5.60%
发文量
612
审稿时长
15 weeks
期刊介绍: Advances in Civil Engineering publishes papers in all areas of civil engineering. The journal welcomes submissions across a range of disciplines, and publishes both theoretical and practical studies. Contributions from academia and from industry are equally encouraged. Subject areas include (but are by no means limited to): -Structural mechanics and engineering- Structural design and construction management- Structural analysis and computational mechanics- Construction technology and implementation- Construction materials design and engineering- Highway and transport engineering- Bridge and tunnel engineering- Municipal and urban engineering- Coastal, harbour and offshore engineering-- Geotechnical and earthquake engineering Engineering for water, waste, energy, and environmental applications- Hydraulic engineering and fluid mechanics- Surveying, monitoring, and control systems in construction- Health and safety in a civil engineering setting. Advances in Civil Engineering also publishes focused review articles that examine the state of the art, identify emerging trends, and suggest future directions for developing fields.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信