{"title":"大跨度双向悬索钢屋架结构预应力反张法施工方法与工艺优化","authors":"Wang Yao, Zhang Hao, Zhang Feng, Li Yang, Li Dong, Bao Min","doi":"10.1155/2024/1668290","DOIUrl":null,"url":null,"abstract":"For medium and small-scale steel structure stadiums, in order to minimize the impact of the construction process on the structural state, a prestressing construction process tailored to medium and small stadiums is proposed, taking full advantage of the inherent elastic deformation range of steel structures. The main steps of the process involve the construction of the main truss first. After the main truss construction is completed, it is lowered to a certain position within its elastic range using cables. The roof grid is then connected to the main truss. Once all connections are completed, the cable tension is gradually released. After the cable tension is released, the main truss exhibits a certain degree of rebound. During the rebound process, the roof grid forms a prestressed structure, ensuring stability and integrity between the main truss and the roof. Through numerical simulation, process analysis is conducted on this construction process, and the optimal construction scheme is proposed.","PeriodicalId":1,"journal":{"name":"Accounts of Chemical Research","volume":null,"pages":null},"PeriodicalIF":16.4000,"publicationDate":"2024-03-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Construction Method and Process Optimization of Prestress Reverse Tensioning for Large-Span Bidirectional Suspension Steel Roof Structures\",\"authors\":\"Wang Yao, Zhang Hao, Zhang Feng, Li Yang, Li Dong, Bao Min\",\"doi\":\"10.1155/2024/1668290\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"For medium and small-scale steel structure stadiums, in order to minimize the impact of the construction process on the structural state, a prestressing construction process tailored to medium and small stadiums is proposed, taking full advantage of the inherent elastic deformation range of steel structures. The main steps of the process involve the construction of the main truss first. After the main truss construction is completed, it is lowered to a certain position within its elastic range using cables. The roof grid is then connected to the main truss. Once all connections are completed, the cable tension is gradually released. After the cable tension is released, the main truss exhibits a certain degree of rebound. During the rebound process, the roof grid forms a prestressed structure, ensuring stability and integrity between the main truss and the roof. Through numerical simulation, process analysis is conducted on this construction process, and the optimal construction scheme is proposed.\",\"PeriodicalId\":1,\"journal\":{\"name\":\"Accounts of Chemical Research\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":16.4000,\"publicationDate\":\"2024-03-14\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Accounts of Chemical Research\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.1155/2024/1668290\",\"RegionNum\":1,\"RegionCategory\":\"化学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"CHEMISTRY, MULTIDISCIPLINARY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Accounts of Chemical Research","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1155/2024/1668290","RegionNum":1,"RegionCategory":"化学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"CHEMISTRY, MULTIDISCIPLINARY","Score":null,"Total":0}
Construction Method and Process Optimization of Prestress Reverse Tensioning for Large-Span Bidirectional Suspension Steel Roof Structures
For medium and small-scale steel structure stadiums, in order to minimize the impact of the construction process on the structural state, a prestressing construction process tailored to medium and small stadiums is proposed, taking full advantage of the inherent elastic deformation range of steel structures. The main steps of the process involve the construction of the main truss first. After the main truss construction is completed, it is lowered to a certain position within its elastic range using cables. The roof grid is then connected to the main truss. Once all connections are completed, the cable tension is gradually released. After the cable tension is released, the main truss exhibits a certain degree of rebound. During the rebound process, the roof grid forms a prestressed structure, ensuring stability and integrity between the main truss and the roof. Through numerical simulation, process analysis is conducted on this construction process, and the optimal construction scheme is proposed.
期刊介绍:
Accounts of Chemical Research presents short, concise and critical articles offering easy-to-read overviews of basic research and applications in all areas of chemistry and biochemistry. These short reviews focus on research from the author’s own laboratory and are designed to teach the reader about a research project. In addition, Accounts of Chemical Research publishes commentaries that give an informed opinion on a current research problem. Special Issues online are devoted to a single topic of unusual activity and significance.
Accounts of Chemical Research replaces the traditional article abstract with an article "Conspectus." These entries synopsize the research affording the reader a closer look at the content and significance of an article. Through this provision of a more detailed description of the article contents, the Conspectus enhances the article's discoverability by search engines and the exposure for the research.