Xinge Miao Ph.D Candidate, Aimin Yuan, Xi Wang Ph.D Candidate, Qi Chen Postgraduate
{"title":"先拱后梁技术:加快绑扎拱桥的安全施工速度","authors":"Xinge Miao Ph.D Candidate, Aimin Yuan, Xi Wang Ph.D Candidate, Qi Chen Postgraduate","doi":"10.1080/10168664.2024.2312179","DOIUrl":null,"url":null,"abstract":"The Taidong River Bridge, a 115 m tied arch bridge, was opened in 2021 over the Taidong River in Jiangsu, China. Due to the significant role of the Taidong River as a crucial navigation channel for...","PeriodicalId":51281,"journal":{"name":"Structural Engineering International","volume":"30 1","pages":""},"PeriodicalIF":1.1000,"publicationDate":"2024-02-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Arch First and Beam Later Technology: An Accelerated and Safe Construction for Tied Arch Bridges\",\"authors\":\"Xinge Miao Ph.D Candidate, Aimin Yuan, Xi Wang Ph.D Candidate, Qi Chen Postgraduate\",\"doi\":\"10.1080/10168664.2024.2312179\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Taidong River Bridge, a 115 m tied arch bridge, was opened in 2021 over the Taidong River in Jiangsu, China. Due to the significant role of the Taidong River as a crucial navigation channel for...\",\"PeriodicalId\":51281,\"journal\":{\"name\":\"Structural Engineering International\",\"volume\":\"30 1\",\"pages\":\"\"},\"PeriodicalIF\":1.1000,\"publicationDate\":\"2024-02-23\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Structural Engineering International\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.1080/10168664.2024.2312179\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"CONSTRUCTION & BUILDING TECHNOLOGY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Structural Engineering International","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1080/10168664.2024.2312179","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
Arch First and Beam Later Technology: An Accelerated and Safe Construction for Tied Arch Bridges
The Taidong River Bridge, a 115 m tied arch bridge, was opened in 2021 over the Taidong River in Jiangsu, China. Due to the significant role of the Taidong River as a crucial navigation channel for...
期刊介绍:
The aim of the Association is to exchange knowledge and to advance the practice of structural engineering worldwide in the service of the profession and society.