影响公共街道项目投标加价决策的关键因素 - 综述

Huzairi Zainul Azlan, Shamsida Saidan Khaderi, A. Bakri
{"title":"影响公共街道项目投标加价决策的关键因素 - 综述","authors":"Huzairi Zainul Azlan, Shamsida Saidan Khaderi, A. Bakri","doi":"10.24191/bej.v21i1.480","DOIUrl":null,"url":null,"abstract":"Deciding a bid price with an appropriate mark-up added to the estimated project cost is essential for the contractors' business survival. However, the competitive environment had influenced contractors to offer the lowest bid price, leading to the submission of unrealistically low prices to win bids. This practice can impact disputes and adversarial relationships between parties during construction and provide an additional risk to the project delay, cost overrun, quality compromise and failure to complete the project. Therefore, this paper aims to provide an overview of the literature on critical factors influencing bid mark-up decisions in public street projects. The objectives are to identify methods and tools, including the critical factors in determining the contractors' bid mark-up decision. The approach is based on analysing pertinent publications on the theme. The top five (5)ranked factors influencing contractors' decision on bid mark-up size can be found in the literature: the number of bidders, the competitiveness of other bidders, relationship and experience with clients, experience on similar projects and project size. Besides that, the determination of mark-up size is based on experience, intuition, past bidding results, past bidding patterns ofcompetitors, the client's tender estimate, the client's record, and financial ability.","PeriodicalId":516744,"journal":{"name":"Built Environment Journal","volume":"125 19","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Critical Factors Influencing Bid Mark-up Decision in Public Street Project – A Review\",\"authors\":\"Huzairi Zainul Azlan, Shamsida Saidan Khaderi, A. Bakri\",\"doi\":\"10.24191/bej.v21i1.480\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Deciding a bid price with an appropriate mark-up added to the estimated project cost is essential for the contractors' business survival. However, the competitive environment had influenced contractors to offer the lowest bid price, leading to the submission of unrealistically low prices to win bids. This practice can impact disputes and adversarial relationships between parties during construction and provide an additional risk to the project delay, cost overrun, quality compromise and failure to complete the project. Therefore, this paper aims to provide an overview of the literature on critical factors influencing bid mark-up decisions in public street projects. The objectives are to identify methods and tools, including the critical factors in determining the contractors' bid mark-up decision. The approach is based on analysing pertinent publications on the theme. The top five (5)ranked factors influencing contractors' decision on bid mark-up size can be found in the literature: the number of bidders, the competitiveness of other bidders, relationship and experience with clients, experience on similar projects and project size. Besides that, the determination of mark-up size is based on experience, intuition, past bidding results, past bidding patterns ofcompetitors, the client's tender estimate, the client's record, and financial ability.\",\"PeriodicalId\":516744,\"journal\":{\"name\":\"Built Environment Journal\",\"volume\":\"125 19\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Built Environment Journal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.24191/bej.v21i1.480\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Built Environment Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24191/bej.v21i1.480","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

确定投标价格,并在项目估算成本中加入适当的加价,对承包商的业务生存至关重要。然而,竞争环境影响承包商提供最低投标价格,导致不切实际的低价中标。这种做法会影响施工期间各方之间的纠纷和敌对关系,并为项目延误、成本超支、质量受损和无法完工带来额外风险。因此,本文旨在概述有关影响公共街道项目投标加价决策的关键因素的文献。目的是确定方法和工具,包括决定承包商投标加价决策的关键因素。该方法基于对相关主题出版物的分析。从文献中可以发现,影响承包商投标加价决定的五大因素分别是:投标人数量、其他投标人的竞争力、与客户的关系和经验、类似项目的经验和项目规模。此外,加价幅度的确定还基于经验、直觉、过去的投标结果、竞争者过去的投标模式、客户的投标估价、客户的记录和财务能力。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Critical Factors Influencing Bid Mark-up Decision in Public Street Project – A Review
Deciding a bid price with an appropriate mark-up added to the estimated project cost is essential for the contractors' business survival. However, the competitive environment had influenced contractors to offer the lowest bid price, leading to the submission of unrealistically low prices to win bids. This practice can impact disputes and adversarial relationships between parties during construction and provide an additional risk to the project delay, cost overrun, quality compromise and failure to complete the project. Therefore, this paper aims to provide an overview of the literature on critical factors influencing bid mark-up decisions in public street projects. The objectives are to identify methods and tools, including the critical factors in determining the contractors' bid mark-up decision. The approach is based on analysing pertinent publications on the theme. The top five (5)ranked factors influencing contractors' decision on bid mark-up size can be found in the literature: the number of bidders, the competitiveness of other bidders, relationship and experience with clients, experience on similar projects and project size. Besides that, the determination of mark-up size is based on experience, intuition, past bidding results, past bidding patterns ofcompetitors, the client's tender estimate, the client's record, and financial ability.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信