{"title":"建筑项目工业化楼宇系统(IBS)当前问题综述","authors":"Mohd Reeza Yusof, I. Jabar, Abdul Hadi Nawawi, Mohd Nasrun Mohd Nawi","doi":"10.24191/bej.v21i1.503","DOIUrl":null,"url":null,"abstract":"In Malaysia, the concept of prefabrication is known as Industrialised Building System (IBS). In terms of cost, time, productivity, and quality, IBS is certainly beneficial based on previous local and international research. As part of Construction Industry Development Board (CIDB), CIDB's Construction 4.0 Strategic Plan 2020-2025, the Malaysian construction industry is being urged to employ innovative construction techniques. These initiatives illustrate the Malaysian government's commitment to addressing the IBS agenda. Even though numerous things have been done to enhance the IBS adoption in Malaysia, various issues have arisen to bring about delays, disputes, miscommunications, and payment issues affecting the IBS players. Thus, the primary purpose of this research is to identify current issues and assist policymakers and IBS players in mitigating those issues. The literature review was the first phase of the research, with the secondary data derived from relevant books, journals, articles, theses, dissertations, conference proceedings and reports. The second phase involved the collection of primary data, wherein the information was collected through a preliminary study. The research findings showed that IBS construction still faces challenges and issues when adopted by the industry, where four (4) out of five (5) interviewees stated that the primary integration issues are teamworkor collaboration and procurement. This paper aims to present a literature review and preliminary survey findings related to establishing pertinent integration issues and challenges.","PeriodicalId":516744,"journal":{"name":"Built Environment Journal","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2024-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A Review of Current Issues in Industrialised Building System (IBS) for Construction Projects\",\"authors\":\"Mohd Reeza Yusof, I. Jabar, Abdul Hadi Nawawi, Mohd Nasrun Mohd Nawi\",\"doi\":\"10.24191/bej.v21i1.503\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In Malaysia, the concept of prefabrication is known as Industrialised Building System (IBS). In terms of cost, time, productivity, and quality, IBS is certainly beneficial based on previous local and international research. As part of Construction Industry Development Board (CIDB), CIDB's Construction 4.0 Strategic Plan 2020-2025, the Malaysian construction industry is being urged to employ innovative construction techniques. These initiatives illustrate the Malaysian government's commitment to addressing the IBS agenda. Even though numerous things have been done to enhance the IBS adoption in Malaysia, various issues have arisen to bring about delays, disputes, miscommunications, and payment issues affecting the IBS players. Thus, the primary purpose of this research is to identify current issues and assist policymakers and IBS players in mitigating those issues. The literature review was the first phase of the research, with the secondary data derived from relevant books, journals, articles, theses, dissertations, conference proceedings and reports. The second phase involved the collection of primary data, wherein the information was collected through a preliminary study. The research findings showed that IBS construction still faces challenges and issues when adopted by the industry, where four (4) out of five (5) interviewees stated that the primary integration issues are teamworkor collaboration and procurement. This paper aims to present a literature review and preliminary survey findings related to establishing pertinent integration issues and challenges.\",\"PeriodicalId\":516744,\"journal\":{\"name\":\"Built Environment Journal\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Built Environment Journal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.24191/bej.v21i1.503\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Built Environment Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24191/bej.v21i1.503","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在马来西亚,预制概念被称为工业化建筑系统(IBS)。根据以往的本地和国际研究,IBS 在成本、时间、生产率和质量方面无疑是有益的。作为建筑业发展局(CIDB)2020-2025 年建筑 4.0 战略计划的一部分,马来西亚建筑业正被敦促采用创新的建筑技术。这些举措表明了马来西亚政府对解决 IBS 议程的承诺。尽管马来西亚已经采取了许多措施来提高综合布线系统的采用率,但还是出现了各种问题,包括延误、纠纷、沟通不畅以及影响综合布线系统参与者的付款问题。因此,本研究的主要目的是找出当前存在的问题,并协助政策制定者和综合布线系统参与者缓解这些问题。文献综述是研究的第一阶段,二手数据来自相关书籍、期刊、文章、论文、学位论文、会议记录和报告。第二阶段是收集原始数据,通过初步研究收集信息。研究结果表明,建筑行业在采用综合集成系统时仍然面临挑战和问题,五(5)位受访者中有四(4)位表示主要的集成问题是团队合作或协作以及采购。本文旨在介绍与确定相关整合问题和挑战有关的文献综述和初步调查结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A Review of Current Issues in Industrialised Building System (IBS) for Construction Projects
In Malaysia, the concept of prefabrication is known as Industrialised Building System (IBS). In terms of cost, time, productivity, and quality, IBS is certainly beneficial based on previous local and international research. As part of Construction Industry Development Board (CIDB), CIDB's Construction 4.0 Strategic Plan 2020-2025, the Malaysian construction industry is being urged to employ innovative construction techniques. These initiatives illustrate the Malaysian government's commitment to addressing the IBS agenda. Even though numerous things have been done to enhance the IBS adoption in Malaysia, various issues have arisen to bring about delays, disputes, miscommunications, and payment issues affecting the IBS players. Thus, the primary purpose of this research is to identify current issues and assist policymakers and IBS players in mitigating those issues. The literature review was the first phase of the research, with the secondary data derived from relevant books, journals, articles, theses, dissertations, conference proceedings and reports. The second phase involved the collection of primary data, wherein the information was collected through a preliminary study. The research findings showed that IBS construction still faces challenges and issues when adopted by the industry, where four (4) out of five (5) interviewees stated that the primary integration issues are teamworkor collaboration and procurement. This paper aims to present a literature review and preliminary survey findings related to establishing pertinent integration issues and challenges.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信