Reyam Raheem Jabbar, Ahmed Abdulrasool Ahmed Alkhafaji
{"title":"用于评估和分析变量数据的计算机辅助模糊控制图","authors":"Reyam Raheem Jabbar, Ahmed Abdulrasool Ahmed Alkhafaji","doi":"10.47191/etj/v9i01.05","DOIUrl":null,"url":null,"abstract":"One of the limitations of fuzzy control charts is the complexity of their mathematical relations, and there is no software built to draw and analyze the fuzzy control charts. This research presents a visual presentation of fuzzy control charts for variables ( , , I-MR), using an integrated program built by MATLAB20 to draw and analyze fuzzy control charts, A real case study was conducted of data collected from the Al-Numan factory for a plastic connecter product. The number of attempts to reach the approved control limits was less in the fuzzy charts, as well as the number of deleted samples in the fuzzy charts was less. It was also noted that the process capability indicators decreased after data fuzzing, they were equal to (3.049) and became equal to (3.013) after fuzzing. This is due to the increase in the standard deviation of the process.","PeriodicalId":11630,"journal":{"name":"Engineering and Technology Journal","volume":"9 20","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-01-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"COMPUTER AIDED FUZZY CONTROL CHARTS FOR EVALUATING AND ANALYZING VARIABLE DATA\",\"authors\":\"Reyam Raheem Jabbar, Ahmed Abdulrasool Ahmed Alkhafaji\",\"doi\":\"10.47191/etj/v9i01.05\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"One of the limitations of fuzzy control charts is the complexity of their mathematical relations, and there is no software built to draw and analyze the fuzzy control charts. This research presents a visual presentation of fuzzy control charts for variables ( , , I-MR), using an integrated program built by MATLAB20 to draw and analyze fuzzy control charts, A real case study was conducted of data collected from the Al-Numan factory for a plastic connecter product. The number of attempts to reach the approved control limits was less in the fuzzy charts, as well as the number of deleted samples in the fuzzy charts was less. It was also noted that the process capability indicators decreased after data fuzzing, they were equal to (3.049) and became equal to (3.013) after fuzzing. This is due to the increase in the standard deviation of the process.\",\"PeriodicalId\":11630,\"journal\":{\"name\":\"Engineering and Technology Journal\",\"volume\":\"9 20\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-01-17\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Engineering and Technology Journal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.47191/etj/v9i01.05\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering and Technology Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.47191/etj/v9i01.05","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
COMPUTER AIDED FUZZY CONTROL CHARTS FOR EVALUATING AND ANALYZING VARIABLE DATA
One of the limitations of fuzzy control charts is the complexity of their mathematical relations, and there is no software built to draw and analyze the fuzzy control charts. This research presents a visual presentation of fuzzy control charts for variables ( , , I-MR), using an integrated program built by MATLAB20 to draw and analyze fuzzy control charts, A real case study was conducted of data collected from the Al-Numan factory for a plastic connecter product. The number of attempts to reach the approved control limits was less in the fuzzy charts, as well as the number of deleted samples in the fuzzy charts was less. It was also noted that the process capability indicators decreased after data fuzzing, they were equal to (3.049) and became equal to (3.013) after fuzzing. This is due to the increase in the standard deviation of the process.