{"title":"沉积软岩中泥浆护壁隧道掘进机驱动装置的堵塞:案例研究","authors":"Chengyong Cao, Xiangsheng Chen, Chenghua Shi, Yanbin Fu, Chenjie Gong, Zuxian Wang","doi":"10.1007/s11709-023-0984-8","DOIUrl":null,"url":null,"abstract":"<p>This paper presents a case study of the clogging of a slurry-shield tunnel-boring machine (TBM) experienced during tunnel operations in clay-rich argillaceous siltstones under the Ganjiang River, China. The clogging experienced during tunneling was due to special geological conditions, which had a considerably negative impact on the slurry-shield TBM tunneling performance. In this case study, the effect of clogging on the slurry-shield TBM tunneling performance (e.g., advance speed, thrust, torque, and penetration per revolution) was fully investigated. The potential for clogging during tunnel operations in argillaceous siltstone was estimated using an existing empirical classification chart. Many improvement measures have been proposed to mitigate the clogging potential of two slurry-shield TBMs during tunneling, such as the use of an optimum cutting wheel, a replacement cutting tool, improvements to the circulation flushing system and slurry properties, mixed support integrating slurry, and compressed air to support the excavation face. The mechanisms and potential causes of clogging are explained in detail, and the contributions of these mitigation measures to tunneling performance are discussed. By investigating the actual operational parameters of the slurry-shield TBMs, these mitigation measures were proven to be effective in mitigating the clogging potential of slurry-shield TBMs. This case study provides valuable information for slurry-shield TBMs involving tunneling in clay-rich sedimentary rocks.</p>","PeriodicalId":12476,"journal":{"name":"Frontiers of Structural and Civil Engineering","volume":"17 1","pages":""},"PeriodicalIF":2.9000,"publicationDate":"2024-01-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Clogging of slurry-shield tunnel-boring machine drives in sedimentary soft rock: A case study\",\"authors\":\"Chengyong Cao, Xiangsheng Chen, Chenghua Shi, Yanbin Fu, Chenjie Gong, Zuxian Wang\",\"doi\":\"10.1007/s11709-023-0984-8\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<p>This paper presents a case study of the clogging of a slurry-shield tunnel-boring machine (TBM) experienced during tunnel operations in clay-rich argillaceous siltstones under the Ganjiang River, China. The clogging experienced during tunneling was due to special geological conditions, which had a considerably negative impact on the slurry-shield TBM tunneling performance. In this case study, the effect of clogging on the slurry-shield TBM tunneling performance (e.g., advance speed, thrust, torque, and penetration per revolution) was fully investigated. The potential for clogging during tunnel operations in argillaceous siltstone was estimated using an existing empirical classification chart. Many improvement measures have been proposed to mitigate the clogging potential of two slurry-shield TBMs during tunneling, such as the use of an optimum cutting wheel, a replacement cutting tool, improvements to the circulation flushing system and slurry properties, mixed support integrating slurry, and compressed air to support the excavation face. The mechanisms and potential causes of clogging are explained in detail, and the contributions of these mitigation measures to tunneling performance are discussed. By investigating the actual operational parameters of the slurry-shield TBMs, these mitigation measures were proven to be effective in mitigating the clogging potential of slurry-shield TBMs. This case study provides valuable information for slurry-shield TBMs involving tunneling in clay-rich sedimentary rocks.</p>\",\"PeriodicalId\":12476,\"journal\":{\"name\":\"Frontiers of Structural and Civil Engineering\",\"volume\":\"17 1\",\"pages\":\"\"},\"PeriodicalIF\":2.9000,\"publicationDate\":\"2024-01-08\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Frontiers of Structural and Civil Engineering\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.1007/s11709-023-0984-8\",\"RegionNum\":3,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"ENGINEERING, CIVIL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Frontiers of Structural and Civil Engineering","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1007/s11709-023-0984-8","RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
Clogging of slurry-shield tunnel-boring machine drives in sedimentary soft rock: A case study
This paper presents a case study of the clogging of a slurry-shield tunnel-boring machine (TBM) experienced during tunnel operations in clay-rich argillaceous siltstones under the Ganjiang River, China. The clogging experienced during tunneling was due to special geological conditions, which had a considerably negative impact on the slurry-shield TBM tunneling performance. In this case study, the effect of clogging on the slurry-shield TBM tunneling performance (e.g., advance speed, thrust, torque, and penetration per revolution) was fully investigated. The potential for clogging during tunnel operations in argillaceous siltstone was estimated using an existing empirical classification chart. Many improvement measures have been proposed to mitigate the clogging potential of two slurry-shield TBMs during tunneling, such as the use of an optimum cutting wheel, a replacement cutting tool, improvements to the circulation flushing system and slurry properties, mixed support integrating slurry, and compressed air to support the excavation face. The mechanisms and potential causes of clogging are explained in detail, and the contributions of these mitigation measures to tunneling performance are discussed. By investigating the actual operational parameters of the slurry-shield TBMs, these mitigation measures were proven to be effective in mitigating the clogging potential of slurry-shield TBMs. This case study provides valuable information for slurry-shield TBMs involving tunneling in clay-rich sedimentary rocks.
期刊介绍:
Frontiers of Structural and Civil Engineering is an international journal that publishes original research papers, review articles and case studies related to civil and structural engineering. Topics include but are not limited to the latest developments in building and bridge structures, geotechnical engineering, hydraulic engineering, coastal engineering, and transport engineering. Case studies that demonstrate the successful applications of cutting-edge research technologies are welcome. The journal also promotes and publishes interdisciplinary research and applications connecting civil engineering and other disciplines, such as bio-, info-, nano- and social sciences and technology. Manuscripts submitted for publication will be subject to a stringent peer review.