{"title":"在道路景观设计中尽量减少占地面积","authors":"M. Kurhan, M. Husak, O. Luzhytskyi, N. Khmelevska","doi":"10.15802/stp2023/288133","DOIUrl":null,"url":null,"abstract":"Purpose. The main purpose of this work is to solve the problem of designing a longitudinal profile, provided that the volume of earthworks is rationally distributed and the width of the right-of-way is reduced when designing a road on the ground in conjunction with the landscape. Methodology. The study was conducted in accordance with the requirements of SBS B.2.3–4:2015 regarding the need to comply with the principles of landscape design and the use of rational combinations of plan elements and longitudinal profile to ensure the smoothness of the road, as well as its relationship with the environment to reduce destruction and preserve the existing landscape in each case. Findings. The paper considers two options for drawing the design line relative to the ground line: in the first option, the design line is drawn based on the condition of approximate equality of the volumes of excavations and embankments, in the second – on the condition of designing the longitudinal profile with the maximum permissible slopes to reduce the value of the working elevations. The research confirms that designing the longitudinal profile with maximum slopes leads to a decrease in the working elevations of embankments and excavations. This, in turn, leads to a reduction in the width of the road right-of-way. In the case of a balanced distribution of embankment and excavation volumes, the width of the right-of-way increased by 1.6 times. However, the use of soil from the excavations for embankment filling (the so-called longitudinal dumping) reduced the total cost of earthworks by 27%, despite the increase in the width of the right-of-way. Originality. Methodological approaches to determining the scope of work and cost of subgrade construction are proposed, provided that the width of the right-of-way is minimized during the design of the road. The cost of the subgrade is represented by two components – the cost of soil development and transportation and the cost of land occupation. Practical value. The results obtained in the course of the research work indicate that the task of determining the scope of work and cost of the subgrade construction, while minimizing the width of the right-of-way during the construction of the road, has been solved. The provided recommendations will contribute to the effectiveness of design solutions, determine the quality of the road project in general and the feasibility of its implementation in particular.","PeriodicalId":338885,"journal":{"name":"Science and Transport Progress","volume":"36 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-06-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Minimization of the Land Right-of-Way During The Landscape Design of a Road\",\"authors\":\"M. Kurhan, M. Husak, O. Luzhytskyi, N. Khmelevska\",\"doi\":\"10.15802/stp2023/288133\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Purpose. The main purpose of this work is to solve the problem of designing a longitudinal profile, provided that the volume of earthworks is rationally distributed and the width of the right-of-way is reduced when designing a road on the ground in conjunction with the landscape. Methodology. The study was conducted in accordance with the requirements of SBS B.2.3–4:2015 regarding the need to comply with the principles of landscape design and the use of rational combinations of plan elements and longitudinal profile to ensure the smoothness of the road, as well as its relationship with the environment to reduce destruction and preserve the existing landscape in each case. Findings. The paper considers two options for drawing the design line relative to the ground line: in the first option, the design line is drawn based on the condition of approximate equality of the volumes of excavations and embankments, in the second – on the condition of designing the longitudinal profile with the maximum permissible slopes to reduce the value of the working elevations. The research confirms that designing the longitudinal profile with maximum slopes leads to a decrease in the working elevations of embankments and excavations. This, in turn, leads to a reduction in the width of the road right-of-way. In the case of a balanced distribution of embankment and excavation volumes, the width of the right-of-way increased by 1.6 times. However, the use of soil from the excavations for embankment filling (the so-called longitudinal dumping) reduced the total cost of earthworks by 27%, despite the increase in the width of the right-of-way. Originality. Methodological approaches to determining the scope of work and cost of subgrade construction are proposed, provided that the width of the right-of-way is minimized during the design of the road. The cost of the subgrade is represented by two components – the cost of soil development and transportation and the cost of land occupation. Practical value. The results obtained in the course of the research work indicate that the task of determining the scope of work and cost of the subgrade construction, while minimizing the width of the right-of-way during the construction of the road, has been solved. The provided recommendations will contribute to the effectiveness of design solutions, determine the quality of the road project in general and the feasibility of its implementation in particular.\",\"PeriodicalId\":338885,\"journal\":{\"name\":\"Science and Transport Progress\",\"volume\":\"36 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-06-02\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Science and Transport Progress\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.15802/stp2023/288133\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Science and Transport Progress","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.15802/stp2023/288133","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

目的。这项工作的主要目的是在结合景观设计地面道路时,在合理分配土方工程量和减少路权宽度的前提下,解决纵剖面设计问题。研究方法。根据 SBS B.2.3-4:2015,即在每种情况下都需要遵守景观设计原则,采用合理的平面元素组合和纵剖面,以确保道路的平整度,以及与环境的关系,减少破坏和保护现有景观的要求进行研究。研究结果。本文考虑了相对于地面线绘制设计线的两种方案:在第一种方案中,设计线的绘制是基于挖方量和路堤量大致相等的条件;在第二种方案中,设计纵剖面的条件是具有最大允许坡度,以降低施工标高值。研究证实,按最大坡度设计纵剖面会降低路堤和挖掘的施工标高。这反过来又会导致路基宽度的减少。在均衡分配路堤和挖掘量的情况下,路基宽度增加了 1.6 倍。然而,尽管路权宽度增加了,但利用挖掘出的土方进行路堤填筑(即所谓的纵向倾倒)可将土方工程的总成本降低 27%。独创性。提出了确定路基工程施工范围和成本的方法,前提是在设计道路时尽量减少路权宽度。路基成本由两部分组成--土壤开发和运输成本以及土地占用成本。实用价值。研究工作取得的成果表明,确定路基施工的工程范围和成本,同时在道路施工过程中尽量减少路基宽度的任务已经解决。所提供的建议将有助于提高设计方案的有效性,从总体上确定公路项目的质量,特别是其实施的可行性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Minimization of the Land Right-of-Way During The Landscape Design of a Road
Purpose. The main purpose of this work is to solve the problem of designing a longitudinal profile, provided that the volume of earthworks is rationally distributed and the width of the right-of-way is reduced when designing a road on the ground in conjunction with the landscape. Methodology. The study was conducted in accordance with the requirements of SBS B.2.3–4:2015 regarding the need to comply with the principles of landscape design and the use of rational combinations of plan elements and longitudinal profile to ensure the smoothness of the road, as well as its relationship with the environment to reduce destruction and preserve the existing landscape in each case. Findings. The paper considers two options for drawing the design line relative to the ground line: in the first option, the design line is drawn based on the condition of approximate equality of the volumes of excavations and embankments, in the second – on the condition of designing the longitudinal profile with the maximum permissible slopes to reduce the value of the working elevations. The research confirms that designing the longitudinal profile with maximum slopes leads to a decrease in the working elevations of embankments and excavations. This, in turn, leads to a reduction in the width of the road right-of-way. In the case of a balanced distribution of embankment and excavation volumes, the width of the right-of-way increased by 1.6 times. However, the use of soil from the excavations for embankment filling (the so-called longitudinal dumping) reduced the total cost of earthworks by 27%, despite the increase in the width of the right-of-way. Originality. Methodological approaches to determining the scope of work and cost of subgrade construction are proposed, provided that the width of the right-of-way is minimized during the design of the road. The cost of the subgrade is represented by two components – the cost of soil development and transportation and the cost of land occupation. Practical value. The results obtained in the course of the research work indicate that the task of determining the scope of work and cost of the subgrade construction, while minimizing the width of the right-of-way during the construction of the road, has been solved. The provided recommendations will contribute to the effectiveness of design solutions, determine the quality of the road project in general and the feasibility of its implementation in particular.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信