{"title":"石棉修复过程中的空气传播纤维监测:巴格诺里-科罗格里奥国家相关利益区 \"ETERNIT \"遗址案例研究","authors":"Edoardo Robortella Stacul, Giuseppe Napolitano, Davide Gresia, Lorenzo Morra, Carmen Fiore, Fabiana Saraceno","doi":"10.36017/jahc202352280","DOIUrl":null,"url":null,"abstract":"As part of the broader implementation of the Environmental Remediation and Urban Regeneration Program (PRARU) of the Bagnoli-Coroglio area of relevant national interest (Naples, Italy), one of the priority actions was the completion of the soil remediation interventions of the former Eternit site, focused on the safe removal of soil and materials containing asbestos still present in the area (approximately 25,700 tonnes of hazardous waste).This area has an extension of approximately 157,000 m2 where the production of products containing asbestos had been carried out from 1939 to 1985. In 1997, the first reclamation activities began, consisting of the decommissioning of industrial structures and continuing with the removal of buried materials. These activities were interrupted in 2014 and then resumed in 2020 until completion at the beginning of 2023.The activities, completed to date, were run under the constant control of the territorially competent “ASL Napoli 1”, and with the implementation of a specific shared plan for monitoring airborne fibers both inside the construction site and outside in the surrounding areas.In particular, environmental monitoring activities were performed before, during and post-operation on eight control units, three of which were located within the construction site and five in the surrounding areas at potentially sensitive targets, as well as personal sampling of the exposed operators.The methods for identifying asbestos fibers were both phase contrast microscopy (MOCF) and scanning electron microscopy (SEM).In both cases, the monitoring results never showed that the thresholds established by Italian legislation were exceeded, both in terms of total fibers and asbestiform fiber.","PeriodicalId":14873,"journal":{"name":"Journal of Advanced Health Care","volume":"116 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"MONITORING OF AIRBORNE FIBERS DURING ASBESTOS REMEDIATION: THE CASE STUDY OF THE “ETERNIT” SITE IN THE BAGNOLI-COROGLIO AREA OF RELEVANT NATIONAL INTEREST\",\"authors\":\"Edoardo Robortella Stacul, Giuseppe Napolitano, Davide Gresia, Lorenzo Morra, Carmen Fiore, Fabiana Saraceno\",\"doi\":\"10.36017/jahc202352280\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"As part of the broader implementation of the Environmental Remediation and Urban Regeneration Program (PRARU) of the Bagnoli-Coroglio area of relevant national interest (Naples, Italy), one of the priority actions was the completion of the soil remediation interventions of the former Eternit site, focused on the safe removal of soil and materials containing asbestos still present in the area (approximately 25,700 tonnes of hazardous waste).This area has an extension of approximately 157,000 m2 where the production of products containing asbestos had been carried out from 1939 to 1985. In 1997, the first reclamation activities began, consisting of the decommissioning of industrial structures and continuing with the removal of buried materials. These activities were interrupted in 2014 and then resumed in 2020 until completion at the beginning of 2023.The activities, completed to date, were run under the constant control of the territorially competent “ASL Napoli 1”, and with the implementation of a specific shared plan for monitoring airborne fibers both inside the construction site and outside in the surrounding areas.In particular, environmental monitoring activities were performed before, during and post-operation on eight control units, three of which were located within the construction site and five in the surrounding areas at potentially sensitive targets, as well as personal sampling of the exposed operators.The methods for identifying asbestos fibers were both phase contrast microscopy (MOCF) and scanning electron microscopy (SEM).In both cases, the monitoring results never showed that the thresholds established by Italian legislation were exceeded, both in terms of total fibers and asbestiform fiber.\",\"PeriodicalId\":14873,\"journal\":{\"name\":\"Journal of Advanced Health Care\",\"volume\":\"116 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Advanced Health Care\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.36017/jahc202352280\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Advanced Health Care","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.36017/jahc202352280","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

作为更广泛地实施巴尼奥利-科罗格里奥(Bagnoli-Coroglio)国家有关地区(意大利那不勒斯)环境整治和城市复兴计划(PRARU)的一部分,优先行动之一是完成 Eternit 公司旧址的土壤整治干预措施,重点是安全清除该地区仍然存在的含石棉土壤和材料(约 25,700 吨危险废物)。1997 年,开始了第一批复垦活动,包括拆除工业结构和继续清除掩埋材料。这些活动于 2014 年中断,然后于 2020 年恢复,直至 2023 年初完成。迄今为止完成的这些活动是在领土主管机构 "ASL Napoli 1 "的持续控制下进行的,并实施了一项专门的共享计划,用于监测建筑工地内外及周边地区的空气传播纤维。特别是,在八个控制单元(其中三个位于建筑工地内,五个位于周边地区的潜在敏感目标处)的运行前、运行中和运行后都进行了环境监测活动,并对暴露在空气中的操作人员进行了个人取样。在这两种情况下,监测结果从未显示总纤维和石棉状纤维超过意大利法律规定的阈值。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
MONITORING OF AIRBORNE FIBERS DURING ASBESTOS REMEDIATION: THE CASE STUDY OF THE “ETERNIT” SITE IN THE BAGNOLI-COROGLIO AREA OF RELEVANT NATIONAL INTEREST
As part of the broader implementation of the Environmental Remediation and Urban Regeneration Program (PRARU) of the Bagnoli-Coroglio area of relevant national interest (Naples, Italy), one of the priority actions was the completion of the soil remediation interventions of the former Eternit site, focused on the safe removal of soil and materials containing asbestos still present in the area (approximately 25,700 tonnes of hazardous waste).This area has an extension of approximately 157,000 m2 where the production of products containing asbestos had been carried out from 1939 to 1985. In 1997, the first reclamation activities began, consisting of the decommissioning of industrial structures and continuing with the removal of buried materials. These activities were interrupted in 2014 and then resumed in 2020 until completion at the beginning of 2023.The activities, completed to date, were run under the constant control of the territorially competent “ASL Napoli 1”, and with the implementation of a specific shared plan for monitoring airborne fibers both inside the construction site and outside in the surrounding areas.In particular, environmental monitoring activities were performed before, during and post-operation on eight control units, three of which were located within the construction site and five in the surrounding areas at potentially sensitive targets, as well as personal sampling of the exposed operators.The methods for identifying asbestos fibers were both phase contrast microscopy (MOCF) and scanning electron microscopy (SEM).In both cases, the monitoring results never showed that the thresholds established by Italian legislation were exceeded, both in terms of total fibers and asbestiform fiber.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信