多技能劳动力:探讨巴西企业精益建造中缺失的这一环节

João Paulo Maciel de Abreu, Gabriel de Camargo Cardoso, F. Marchiori, Maria Carolina Gomes de Oliveira Brandstetter, L. F. Heineck
{"title":"多技能劳动力:探讨巴西企业精益建造中缺失的这一环节","authors":"João Paulo Maciel de Abreu, Gabriel de Camargo Cardoso, F. Marchiori, Maria Carolina Gomes de Oliveira Brandstetter, L. F. Heineck","doi":"10.1590/s1678-86212023000400688","DOIUrl":null,"url":null,"abstract":"Abstract Multiskilled labor is a ubiquitous concept and its adoption is suggested in various production approaches such as sociotechnical systems, cellular arrangements and, most notably, related to Lean Production, as it provides flexibility to the work environment. This research work aimed at identifying the extent of the use of multiskilling in a sample of Brazilian construction sites. A survey was conducted comprising variables such as reasons for simultaneous use of specialized and multiskilled labor. A total of 191 valid questionnaires were returned. Statistical analyses point out that it is common to employ both specialized and multiskilled labor in the majority of sites. Furthermore, multiskilling and subcontracting are concomitant flexible strategies to accommodate labor provision on site. The share of multiskilling is greater than reported in academic works, the number of skills is as restricted as in literature propositions and the size of the building firm is determinant of the share of multiskilled labor in the total workforce. This research work concludes that: work flexibility may be obtained with different strategies (multiskilled; specialized and multiskilled; subcontracting); employing only specialized trades is not a dominant culture on building sites.","PeriodicalId":156283,"journal":{"name":"Ambiente Construído","volume":"295 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-09-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Multiskilled labor force: a discussion of this missing link of lean construction in Brazilian companies\",\"authors\":\"João Paulo Maciel de Abreu, Gabriel de Camargo Cardoso, F. Marchiori, Maria Carolina Gomes de Oliveira Brandstetter, L. F. Heineck\",\"doi\":\"10.1590/s1678-86212023000400688\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract Multiskilled labor is a ubiquitous concept and its adoption is suggested in various production approaches such as sociotechnical systems, cellular arrangements and, most notably, related to Lean Production, as it provides flexibility to the work environment. This research work aimed at identifying the extent of the use of multiskilling in a sample of Brazilian construction sites. A survey was conducted comprising variables such as reasons for simultaneous use of specialized and multiskilled labor. A total of 191 valid questionnaires were returned. Statistical analyses point out that it is common to employ both specialized and multiskilled labor in the majority of sites. Furthermore, multiskilling and subcontracting are concomitant flexible strategies to accommodate labor provision on site. The share of multiskilling is greater than reported in academic works, the number of skills is as restricted as in literature propositions and the size of the building firm is determinant of the share of multiskilled labor in the total workforce. This research work concludes that: work flexibility may be obtained with different strategies (multiskilled; specialized and multiskilled; subcontracting); employing only specialized trades is not a dominant culture on building sites.\",\"PeriodicalId\":156283,\"journal\":{\"name\":\"Ambiente Construído\",\"volume\":\"295 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-09-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Ambiente Construído\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1590/s1678-86212023000400688\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Ambiente Construído","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1590/s1678-86212023000400688","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

摘要 多技能劳动力是一个无处不在的概念,各种生产方法都建议采用多技能劳动力,如社会技术系统、单元式安排,最值得注意的是与精益生产相关的多技能劳动力,因为它为工作环境提供了灵活性。这项研究工作旨在确定巴西建筑工地使用多种技能的程度。调查内容包括同时使用专业和多技能劳动力的原因等变量。共收回 191 份有效问卷。统计分析表明,在大多数工地,同时使用专业和多技能劳动力的情况很普遍。此外,多技能和分包是同时存在的灵活策略,以适应现场的劳动力供应。多技能的比例高于学术著作的报道,技能的数量与文献中的说法一样有限,建筑公司的规模是多技能劳动力在总劳动力中所占比例的决定因素。这项研究工作得出的结论是:可以通过不同的策略(多技能、专业和多技能、分包)获得工作灵活性;只雇用专业工种并非建筑工地的主流文化。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Multiskilled labor force: a discussion of this missing link of lean construction in Brazilian companies
Abstract Multiskilled labor is a ubiquitous concept and its adoption is suggested in various production approaches such as sociotechnical systems, cellular arrangements and, most notably, related to Lean Production, as it provides flexibility to the work environment. This research work aimed at identifying the extent of the use of multiskilling in a sample of Brazilian construction sites. A survey was conducted comprising variables such as reasons for simultaneous use of specialized and multiskilled labor. A total of 191 valid questionnaires were returned. Statistical analyses point out that it is common to employ both specialized and multiskilled labor in the majority of sites. Furthermore, multiskilling and subcontracting are concomitant flexible strategies to accommodate labor provision on site. The share of multiskilling is greater than reported in academic works, the number of skills is as restricted as in literature propositions and the size of the building firm is determinant of the share of multiskilled labor in the total workforce. This research work concludes that: work flexibility may be obtained with different strategies (multiskilled; specialized and multiskilled; subcontracting); employing only specialized trades is not a dominant culture on building sites.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信