{"title":"西苏姆达乌收费公路第 5b 段 Kedondong 桥工程中钻孔桩、桩帽和墩柱工程的实施方法","authors":"Wardani, Asep Dian Heryadiana","doi":"10.31949/stima.v7i0.902","DOIUrl":null,"url":null,"abstract":"Transportation is an inseparable part of human survival. Related to human activities,transportation plays a very significant role in social, economic, environmental and other aspects.Tol Road is a public and closed road where its construction is charged to cross according to theapplicable tariffs. This road is a form of tariff grant on the road that is generally applied to coverthe cost of construction and maintenance of the road. Tol Road Cisumdawu is one of the road freeof barriers that crosses from the area of Cileunyi, Sumedang, Dawuan. This Tol road is no morethan an effort to streamline traffic to improve the distribution of goods and services that grow theeconomy around, as well as become one of the fast access between the districts of the city. A bridgeis a building that allows a road to cross a river, valley or other road of different elevations. In theplanning of the bridge must take into account the functional needs of transportation. This journalfocuses on methods of implementation of pile bore, pilecap, as well as pier work located on theconstruction project of Road Tol cisumdawu section 5 b located in the village of cipelangkecamatan ujungjaya sumedang.","PeriodicalId":161203,"journal":{"name":"SEMINAR TEKNOLOGI MAJALENGKA (STIMA)","volume":"20 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-11-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"METODE PELAKSANAAN PEKERJAAN BOREPILE, PILECAP DAN PIER KOLOM PADA PEKERJAAN JEMBATAN KEDONDONG TOL CISUMDAWU SEKSI 5B\",\"authors\":\"Wardani, Asep Dian Heryadiana\",\"doi\":\"10.31949/stima.v7i0.902\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Transportation is an inseparable part of human survival. Related to human activities,transportation plays a very significant role in social, economic, environmental and other aspects.Tol Road is a public and closed road where its construction is charged to cross according to theapplicable tariffs. This road is a form of tariff grant on the road that is generally applied to coverthe cost of construction and maintenance of the road. Tol Road Cisumdawu is one of the road freeof barriers that crosses from the area of Cileunyi, Sumedang, Dawuan. This Tol road is no morethan an effort to streamline traffic to improve the distribution of goods and services that grow theeconomy around, as well as become one of the fast access between the districts of the city. A bridgeis a building that allows a road to cross a river, valley or other road of different elevations. In theplanning of the bridge must take into account the functional needs of transportation. This journalfocuses on methods of implementation of pile bore, pilecap, as well as pier work located on theconstruction project of Road Tol cisumdawu section 5 b located in the village of cipelangkecamatan ujungjaya sumedang.\",\"PeriodicalId\":161203,\"journal\":{\"name\":\"SEMINAR TEKNOLOGI MAJALENGKA (STIMA)\",\"volume\":\"20 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-11-08\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"SEMINAR TEKNOLOGI MAJALENGKA (STIMA)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.31949/stima.v7i0.902\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"SEMINAR TEKNOLOGI MAJALENGKA (STIMA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31949/stima.v7i0.902","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
摘要
交通是人类生存不可分割的一部分。托尔路是一条公共封闭道路,其建设费用根据适用的收费标准收取。托尔路是一种收费道路,一般用于支付道路的建设和维护费用。Cisumdawu 托尔路是从 Cileunyi、Sumedang 和 Dawuan 地区穿过的无障碍道路之一。这条托尔路的目的无非是为了简化交通,改善商品和服务的流通,促进周边经济的发展,同时也是城市各区之间的快速通道之一。桥梁是让道路跨越河流、山谷或其他不同标高道路的建筑物。在规划桥梁时,必须考虑到交通的功能需求。本日志的重点是位于 cipelangkecamatan ujungjaya sumedang 村的 Tol cisumdawu 第 5 b 段公路建设项目中的桩孔、桩帽以及桥墩工程的实施方法。
METODE PELAKSANAAN PEKERJAAN BOREPILE, PILECAP DAN PIER KOLOM PADA PEKERJAAN JEMBATAN KEDONDONG TOL CISUMDAWU SEKSI 5B
Transportation is an inseparable part of human survival. Related to human activities,transportation plays a very significant role in social, economic, environmental and other aspects.Tol Road is a public and closed road where its construction is charged to cross according to theapplicable tariffs. This road is a form of tariff grant on the road that is generally applied to coverthe cost of construction and maintenance of the road. Tol Road Cisumdawu is one of the road freeof barriers that crosses from the area of Cileunyi, Sumedang, Dawuan. This Tol road is no morethan an effort to streamline traffic to improve the distribution of goods and services that grow theeconomy around, as well as become one of the fast access between the districts of the city. A bridgeis a building that allows a road to cross a river, valley or other road of different elevations. In theplanning of the bridge must take into account the functional needs of transportation. This journalfocuses on methods of implementation of pile bore, pilecap, as well as pier work located on theconstruction project of Road Tol cisumdawu section 5 b located in the village of cipelangkecamatan ujungjaya sumedang.