发展高速铁路的项目分类

S. P. Vakulenko, D. Romensky, K. Kalinin
{"title":"发展高速铁路的项目分类","authors":"S. P. Vakulenko, D. Romensky, K. Kalinin","doi":"10.30932/1992-3252-2023-21-3-8","DOIUrl":null,"url":null,"abstract":"The emerging demand for improving consumer parameters of rail passenger transport leads to the need to build a dedicated railway infrastructure for passenger trains with speeds exceeding in some sections 250 km/h. The high capital intensity of dedicated infrastructure development projects imposes significant restrictions on their scope and financial feasibility. The geographically determined location of urban agglomerations in European and Asian countries has led to formation of many approaches to the routing of lines for high-speed passenger transportation.The projects for development of dedicated high-speed railways being developed in various countries differ in their technical, technological, and operational characteristics. The use of different approaches has led to different efficiency of the passenger traffic, expressed in the demand of passengers for transportation.A structural analysis of existing high-speed transportation projects allowed revealing general patterns of their development. By the number of operational tasks arising with regard to movement of trains, the phases of traffic development were divided into linear, tree­like and network stages. Thus, when moving from the linear structure of a high-speed rail, an additional problem arises of trains passing from the main track to the secondary one. The transition to the network stage can result in emergence of parallel passages rail tracks between urban agglomerations.To generalise the experience of operating high-speed systems in the world, the article describes the developed method that allows comparing different projects for organising high-speed rail with each other. The comparison is made according to the main characteristics of traffic: travel time between separation points, the traffic speed, the total length of the railway line. Identification of the patterns inherent in various projects for development of high-speed rail will make it possible to compare their technological parameters, to identify the scope of rational use of high-speed lines and areas of competition with other core types of transport.","PeriodicalId":121504,"journal":{"name":"World of Transport and Transportation","volume":"9 6","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-11-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Typification of Projects for Development of High-Speed Rail\",\"authors\":\"S. P. Vakulenko, D. Romensky, K. Kalinin\",\"doi\":\"10.30932/1992-3252-2023-21-3-8\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The emerging demand for improving consumer parameters of rail passenger transport leads to the need to build a dedicated railway infrastructure for passenger trains with speeds exceeding in some sections 250 km/h. The high capital intensity of dedicated infrastructure development projects imposes significant restrictions on their scope and financial feasibility. The geographically determined location of urban agglomerations in European and Asian countries has led to formation of many approaches to the routing of lines for high-speed passenger transportation.The projects for development of dedicated high-speed railways being developed in various countries differ in their technical, technological, and operational characteristics. The use of different approaches has led to different efficiency of the passenger traffic, expressed in the demand of passengers for transportation.A structural analysis of existing high-speed transportation projects allowed revealing general patterns of their development. By the number of operational tasks arising with regard to movement of trains, the phases of traffic development were divided into linear, tree­like and network stages. Thus, when moving from the linear structure of a high-speed rail, an additional problem arises of trains passing from the main track to the secondary one. The transition to the network stage can result in emergence of parallel passages rail tracks between urban agglomerations.To generalise the experience of operating high-speed systems in the world, the article describes the developed method that allows comparing different projects for organising high-speed rail with each other. The comparison is made according to the main characteristics of traffic: travel time between separation points, the traffic speed, the total length of the railway line. Identification of the patterns inherent in various projects for development of high-speed rail will make it possible to compare their technological parameters, to identify the scope of rational use of high-speed lines and areas of competition with other core types of transport.\",\"PeriodicalId\":121504,\"journal\":{\"name\":\"World of Transport and Transportation\",\"volume\":\"9 6\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-11-17\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"World of Transport and Transportation\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.30932/1992-3252-2023-21-3-8\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"World of Transport and Transportation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30932/1992-3252-2023-21-3-8","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

改善铁路客运消费参数的新需求导致需要为某些路段时速超过 250 公里的客运列车建设专用铁路基础设施。专用基础设施开发项目的高资本密集度对其范围和财务可行性造成了极大的限制。欧洲和亚洲各国城市群的地理位置决定了高速客运线路的选线方法多种多样。对现有高速运输项目的结构分析揭示了其发展的一般模式。根据列车运行所产生的运营任务数量,交通发展阶段被划分为线性阶段、树状阶段和网络阶段。因此,当从高速铁路的线性结构转移时,就会出现列车从主轨道进入辅助轨道的额外问题。为了归纳世界高速系统的运营经验,文章介绍了所开发的方法,该方法可对不同的高速铁路组织项目进行比较。比较的依据是交通的主要特征:分隔点之间的旅行时间、交通速度、铁路线总长度。确定各种高速铁路发展项目的固有模式将有助于比较其技术参数,确定高速铁路的合理使用范围以及与其他核心运输类型竞争的领域。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Typification of Projects for Development of High-Speed Rail
The emerging demand for improving consumer parameters of rail passenger transport leads to the need to build a dedicated railway infrastructure for passenger trains with speeds exceeding in some sections 250 km/h. The high capital intensity of dedicated infrastructure development projects imposes significant restrictions on their scope and financial feasibility. The geographically determined location of urban agglomerations in European and Asian countries has led to formation of many approaches to the routing of lines for high-speed passenger transportation.The projects for development of dedicated high-speed railways being developed in various countries differ in their technical, technological, and operational characteristics. The use of different approaches has led to different efficiency of the passenger traffic, expressed in the demand of passengers for transportation.A structural analysis of existing high-speed transportation projects allowed revealing general patterns of their development. By the number of operational tasks arising with regard to movement of trains, the phases of traffic development were divided into linear, tree­like and network stages. Thus, when moving from the linear structure of a high-speed rail, an additional problem arises of trains passing from the main track to the secondary one. The transition to the network stage can result in emergence of parallel passages rail tracks between urban agglomerations.To generalise the experience of operating high-speed systems in the world, the article describes the developed method that allows comparing different projects for organising high-speed rail with each other. The comparison is made according to the main characteristics of traffic: travel time between separation points, the traffic speed, the total length of the railway line. Identification of the patterns inherent in various projects for development of high-speed rail will make it possible to compare their technological parameters, to identify the scope of rational use of high-speed lines and areas of competition with other core types of transport.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信