{"title":"关于节约使用铁路运输通道能力和铁路建筑准备问题的专家调查问卷","authors":"Pavel Purkart, David Vodák","doi":"10.14311/app.2023.43.0086","DOIUrl":null,"url":null,"abstract":"The railway traffic path capacity and the issue of railway buildings planning are topics that are widely discussed in professional groups. Experts often do not the same opinions on these topics. The issue of the allocation of railway traffic path capacity is given in general legislation and further by regulations or directives of a particular railway operator. Carriers are obliged to agree to these conditions. In the case of railway buildings planning, there are also comprehensive defined procedures and selected methods and models which are used to evaluate buildings planning (for example, a four-stage transport model or a logit model). However, it is appropriate to deal with the idea of whether all these procedures are correct and whether it is not appropriate to make changes, especially in the long-established procedures, that would better reflect the current and future reality and society needs.","PeriodicalId":503914,"journal":{"name":"Acta Polytechnica CTU Proceedings","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-11-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Expert questionnaire on the issue of economical use of the railway traffic path capacity and buildings preparation on the railway\",\"authors\":\"Pavel Purkart, David Vodák\",\"doi\":\"10.14311/app.2023.43.0086\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The railway traffic path capacity and the issue of railway buildings planning are topics that are widely discussed in professional groups. Experts often do not the same opinions on these topics. The issue of the allocation of railway traffic path capacity is given in general legislation and further by regulations or directives of a particular railway operator. Carriers are obliged to agree to these conditions. In the case of railway buildings planning, there are also comprehensive defined procedures and selected methods and models which are used to evaluate buildings planning (for example, a four-stage transport model or a logit model). However, it is appropriate to deal with the idea of whether all these procedures are correct and whether it is not appropriate to make changes, especially in the long-established procedures, that would better reflect the current and future reality and society needs.\",\"PeriodicalId\":503914,\"journal\":{\"name\":\"Acta Polytechnica CTU Proceedings\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-11-22\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Acta Polytechnica CTU Proceedings\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.14311/app.2023.43.0086\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Acta Polytechnica CTU Proceedings","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.14311/app.2023.43.0086","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

铁路交通道路能力和铁路建筑规划问题是专业团体广泛讨论的话题。专家们对这些问题的看法往往不尽相同。铁路运输通道容量的分配问题由一般法律规定,并由特定铁路运营商的法规或指令进一步规定。承运商必须同意这些条件。在铁路建筑规划方面,也有全面界定的程序和选定的方法和模型,用于评估建筑规划(例如,四阶段运输模型或 logit 模型)。然而,我们应该考虑的是,这些程序是否都是正确的,是否应该进行修改,特别是对那些沿用已久的程序进行修改,以便更好地反映当前和未来的现实情况和社会需求。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Expert questionnaire on the issue of economical use of the railway traffic path capacity and buildings preparation on the railway
The railway traffic path capacity and the issue of railway buildings planning are topics that are widely discussed in professional groups. Experts often do not the same opinions on these topics. The issue of the allocation of railway traffic path capacity is given in general legislation and further by regulations or directives of a particular railway operator. Carriers are obliged to agree to these conditions. In the case of railway buildings planning, there are also comprehensive defined procedures and selected methods and models which are used to evaluate buildings planning (for example, a four-stage transport model or a logit model). However, it is appropriate to deal with the idea of whether all these procedures are correct and whether it is not appropriate to make changes, especially in the long-established procedures, that would better reflect the current and future reality and society needs.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信