转换挑战:利用建筑信息模型 (BIM) 将柱楣结构转换为预制混凝土结构的案例研究

Chavanont Khosakitchalert, Nobuyoshi Yabuki
{"title":"转换挑战:利用建筑信息模型 (BIM) 将柱楣结构转换为预制混凝土结构的案例研究","authors":"Chavanont Khosakitchalert, Nobuyoshi Yabuki","doi":"10.54028/nj202322316","DOIUrl":null,"url":null,"abstract":"Building Information Modeling (BIM) is now a widely accepted tool in the construction industry for designing and managing construction projects. However, converting a BIM model from one type of structure to another can be challenging. This case report aims to document the problems and challenges encountered when an engineer team attempted to create a precast concrete structural BIM model from an architectural BIM model that was initially designed to use a post and lintel system. The architect worked with the engineer team, facing several challenges when changing the structural system. One of the main challenges during the conversion process was redesigning structural elements as the structural behavior of the building changed significantly. The architectural layout and design of the building had to be altered to accommodate the new structural system. Additionally, the mechanical, electrical, and plumbing (MEP) systems had to be planned for installation within the precast concrete structure. These changes required significant effort and coordination between the different teams involved in the project. In conclusion, the case study demonstrates that converting a BIM model from one type of structure to another can be a challenging task that requires significant effort, coordination, and planning. It also shows that BIM models are not just a design tool but also a powerful tool for construction management and coordination.","PeriodicalId":502924,"journal":{"name":"Nakhara : Journal of Environmental Design and Planning","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-11-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Conversion Challenges: A Case Study of Converting a Post and Lintel Structure to a Precast Concrete Structure Using Building Information Modeling (BIM)\",\"authors\":\"Chavanont Khosakitchalert, Nobuyoshi Yabuki\",\"doi\":\"10.54028/nj202322316\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Building Information Modeling (BIM) is now a widely accepted tool in the construction industry for designing and managing construction projects. However, converting a BIM model from one type of structure to another can be challenging. This case report aims to document the problems and challenges encountered when an engineer team attempted to create a precast concrete structural BIM model from an architectural BIM model that was initially designed to use a post and lintel system. The architect worked with the engineer team, facing several challenges when changing the structural system. One of the main challenges during the conversion process was redesigning structural elements as the structural behavior of the building changed significantly. The architectural layout and design of the building had to be altered to accommodate the new structural system. Additionally, the mechanical, electrical, and plumbing (MEP) systems had to be planned for installation within the precast concrete structure. These changes required significant effort and coordination between the different teams involved in the project. In conclusion, the case study demonstrates that converting a BIM model from one type of structure to another can be a challenging task that requires significant effort, coordination, and planning. It also shows that BIM models are not just a design tool but also a powerful tool for construction management and coordination.\",\"PeriodicalId\":502924,\"journal\":{\"name\":\"Nakhara : Journal of Environmental Design and Planning\",\"volume\":\"1 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-11-23\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Nakhara : Journal of Environmental Design and Planning\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.54028/nj202322316\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Nakhara : Journal of Environmental Design and Planning","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.54028/nj202322316","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

建筑信息模型(BIM)现已成为建筑行业广泛接受的设计和管理建筑项目的工具。然而,将 BIM 模型从一种结构类型转换到另一种结构类型可能具有挑战性。本案例报告旨在记录一个工程师团队在尝试从建筑 BIM 模型创建预制混凝土结构 BIM 模型时遇到的问题和挑战。建筑师与工程师团队合作,在改变结构系统时遇到了一些挑战。转换过程中的主要挑战之一是重新设计结构元素,因为建筑的结构行为发生了显著变化。为了适应新的结构系统,必须改变建筑布局和设计。此外,机械、电气和管道(MEP)系统也必须计划安装在预制混凝土结构中。这些改动需要参与项目的不同团队付出大量的努力和协调。总之,该案例研究表明,将 BIM 模型从一种类型的结构转换为另一种类型的结构是一项具有挑战性的任务,需要大量的努力、协调和规划。它还表明,BIM 模型不仅是一种设计工具,也是一种强大的施工管理和协调工具。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Conversion Challenges: A Case Study of Converting a Post and Lintel Structure to a Precast Concrete Structure Using Building Information Modeling (BIM)
Building Information Modeling (BIM) is now a widely accepted tool in the construction industry for designing and managing construction projects. However, converting a BIM model from one type of structure to another can be challenging. This case report aims to document the problems and challenges encountered when an engineer team attempted to create a precast concrete structural BIM model from an architectural BIM model that was initially designed to use a post and lintel system. The architect worked with the engineer team, facing several challenges when changing the structural system. One of the main challenges during the conversion process was redesigning structural elements as the structural behavior of the building changed significantly. The architectural layout and design of the building had to be altered to accommodate the new structural system. Additionally, the mechanical, electrical, and plumbing (MEP) systems had to be planned for installation within the precast concrete structure. These changes required significant effort and coordination between the different teams involved in the project. In conclusion, the case study demonstrates that converting a BIM model from one type of structure to another can be a challenging task that requires significant effort, coordination, and planning. It also shows that BIM models are not just a design tool but also a powerful tool for construction management and coordination.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信