花圃作为中爪哇 Sragen 县 Gondang 区 Srimulyo 村 Embung 地区的短期绿化工作

Faiz Nur Fauzi, Budi Siswanto
{"title":"花圃作为中爪哇 Sragen 县 Gondang 区 Srimulyo 村 Embung 地区的短期绿化工作","authors":"Faiz Nur Fauzi, Budi Siswanto","doi":"10.47942/jpttg.v4i3.1495","DOIUrl":null,"url":null,"abstract":"A flower garden was created to green the embung area considering the dry season in August. The master plan used as a reference is a master plan made by the previous KKN period. In the execution process, the making of the flower garden has yet to be realized. Therefore, in this period of KKN, a flower garden was made west of the village pond. The flower garden created has a size of 8 x 2 meters with a distance of 30 cm between plants. There are 89 plants in this flower garden, namely 50 red purslane plants, 30 sabrina plants, and nine panca air plants. Making the garden begins with clearing the land and cleaning up the existing weeds. Then, the land measurement is carried out according to the desired garden size. After that, the process of tillage so that the soil can be planted with flower plants that have been prepared. The process of tillage is a process that takes much time. More than three days of new soil can be planted with flower plants. The obstacle faced in making this garden is the dry soil conditions, resulting in soil management that must be done with a long process.","PeriodicalId":137768,"journal":{"name":"JURNAL PENGABDIAN TEKNOLOGI TEPAT GUNA","volume":"49 9","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-11-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Flower Garden as a Short-Term Greening Effort for Embung Area in Srimulyo Village, Gondang District, Sragen Regency, Central Java\",\"authors\":\"Faiz Nur Fauzi, Budi Siswanto\",\"doi\":\"10.47942/jpttg.v4i3.1495\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A flower garden was created to green the embung area considering the dry season in August. The master plan used as a reference is a master plan made by the previous KKN period. In the execution process, the making of the flower garden has yet to be realized. Therefore, in this period of KKN, a flower garden was made west of the village pond. The flower garden created has a size of 8 x 2 meters with a distance of 30 cm between plants. There are 89 plants in this flower garden, namely 50 red purslane plants, 30 sabrina plants, and nine panca air plants. Making the garden begins with clearing the land and cleaning up the existing weeds. Then, the land measurement is carried out according to the desired garden size. After that, the process of tillage so that the soil can be planted with flower plants that have been prepared. The process of tillage is a process that takes much time. More than three days of new soil can be planted with flower plants. The obstacle faced in making this garden is the dry soil conditions, resulting in soil management that must be done with a long process.\",\"PeriodicalId\":137768,\"journal\":{\"name\":\"JURNAL PENGABDIAN TEKNOLOGI TEPAT GUNA\",\"volume\":\"49 9\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-11-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"JURNAL PENGABDIAN TEKNOLOGI TEPAT GUNA\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.47942/jpttg.v4i3.1495\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"JURNAL PENGABDIAN TEKNOLOGI TEPAT GUNA","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.47942/jpttg.v4i3.1495","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

考虑到八月是旱季,还建造了一个花圃来绿化embung 地区。作为参考的总体规划是上一个 KKN 时期的总体规划。在执行过程中,花圃的建设尚未实现。因此,在这一时期,在村庄池塘西侧建造了一个花圃。花圃面积为 8 x 2 米,植物间距为 30 厘米。花圃中共有 89 棵植物,分别是 50 棵红马齿苋、30 棵沙比利纳和 9 棵潘卡空气植物。制作花园首先要清理土地,清除现有杂草。然后,根据所需的花园面积进行土地测量。然后,进行翻耕,以便在土壤中种植准备好的花卉植物。翻耕过程需要很多时间。三天以上的新土壤就可以种上花草。建造这个花园面临的障碍是土壤条件干燥,导致土壤管理必须经过一个漫长的过程。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Flower Garden as a Short-Term Greening Effort for Embung Area in Srimulyo Village, Gondang District, Sragen Regency, Central Java
A flower garden was created to green the embung area considering the dry season in August. The master plan used as a reference is a master plan made by the previous KKN period. In the execution process, the making of the flower garden has yet to be realized. Therefore, in this period of KKN, a flower garden was made west of the village pond. The flower garden created has a size of 8 x 2 meters with a distance of 30 cm between plants. There are 89 plants in this flower garden, namely 50 red purslane plants, 30 sabrina plants, and nine panca air plants. Making the garden begins with clearing the land and cleaning up the existing weeds. Then, the land measurement is carried out according to the desired garden size. After that, the process of tillage so that the soil can be planted with flower plants that have been prepared. The process of tillage is a process that takes much time. More than three days of new soil can be planted with flower plants. The obstacle faced in making this garden is the dry soil conditions, resulting in soil management that must be done with a long process.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信