{"title":"库尔马拉油田利用水平井延迟水突破","authors":"Al-Hussein Altaher, Maha Hamoudi, Akram Humoodi","doi":"10.46717/igj.56.2e.15ms-2023-11-20","DOIUrl":null,"url":null,"abstract":"Water coning presents a serious problem in many oil fields, in terms of reducing oil production rate and increasing production costs. As breakthrough time represents the time until coning occurs, it should be increased by studying the significant affecting parameters and proposing a method to control them. Since horizontal wells are known to have higher potentials than vertical wells, they are used worldwide to delay water coning among other purposes. In this study, four designed horizontal wells are proposed to replace a drilled vertical well in Khurmala oilfield in northern Iraq, and the effect of each on water breakthrough time is studied with four different production rates and six different permeability ratios. PERFORM software is used to model the wells, and calculate the expected breakthrough time for each well. It was found that the 1000-ft horizontal well, and longer wells, will delay water breakthrough time, in all cases. Also, higher permeability ratios increase the breakthrough time for longer wells, by up to 15.69 folds, except with the optimum production rate, and increasing production rate results in decreasing breakthrough time (tBT) in all cases, where doubling the production rate may decrease tBT by more than 73.5%. It is essential to determine the minimum horizontal well length required to delay water breakthrough time, compared to the vertical well, by considering both production rate and permeability ratio. The breakthrough time ratio, depending on the proposed to optimum production rate ratio, can be calculated using the developed correlation with an average error of 1.73%.","PeriodicalId":14847,"journal":{"name":"Iraqi Geological Journal","volume":"39 ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-11-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Delaying Water Breakthrough Using Horizontal Wells in Khurmala Oilfield\",\"authors\":\"Al-Hussein Altaher, Maha Hamoudi, Akram Humoodi\",\"doi\":\"10.46717/igj.56.2e.15ms-2023-11-20\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Water coning presents a serious problem in many oil fields, in terms of reducing oil production rate and increasing production costs. As breakthrough time represents the time until coning occurs, it should be increased by studying the significant affecting parameters and proposing a method to control them. Since horizontal wells are known to have higher potentials than vertical wells, they are used worldwide to delay water coning among other purposes. In this study, four designed horizontal wells are proposed to replace a drilled vertical well in Khurmala oilfield in northern Iraq, and the effect of each on water breakthrough time is studied with four different production rates and six different permeability ratios. PERFORM software is used to model the wells, and calculate the expected breakthrough time for each well. It was found that the 1000-ft horizontal well, and longer wells, will delay water breakthrough time, in all cases. Also, higher permeability ratios increase the breakthrough time for longer wells, by up to 15.69 folds, except with the optimum production rate, and increasing production rate results in decreasing breakthrough time (tBT) in all cases, where doubling the production rate may decrease tBT by more than 73.5%. It is essential to determine the minimum horizontal well length required to delay water breakthrough time, compared to the vertical well, by considering both production rate and permeability ratio. The breakthrough time ratio, depending on the proposed to optimum production rate ratio, can be calculated using the developed correlation with an average error of 1.73%.\",\"PeriodicalId\":14847,\"journal\":{\"name\":\"Iraqi Geological Journal\",\"volume\":\"39 \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-11-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Iraqi Geological Journal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.46717/igj.56.2e.15ms-2023-11-20\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"Earth and Planetary Sciences\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Iraqi Geological Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.46717/igj.56.2e.15ms-2023-11-20","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Earth and Planetary Sciences","Score":null,"Total":0}
引用次数: 0

摘要

水锥是许多油田面临的一个严重问题,它降低了石油生产率,增加了生产成本。由于突破时间代表的是水锥发生前的时间,因此应通过研究重要的影响参数并提出控制方法来延长突破时间。众所周知,水平井比垂直井具有更高的潜力,因此全世界都在使用水平井来延迟水锥的出现。本研究提出了四口设计水平井,以取代伊拉克北部 Khurmala 油田的一口已钻垂直井,并研究了四种不同生产率和六种不同渗透率下每种水平井对水突破时间的影响。使用 PERFORM 软件对油井进行建模,并计算每口井的预期突破时间。结果发现,在所有情况下,1000 英尺水平井和更长的井都会延迟水突破时间。此外,除最佳生产率外,较高的渗透率会使较长井的水突破时间延长 15.69 倍,而且在所有情况下,生产率的增加都会导致水突破时间(tBT)的减少,生产率增加一倍可使水突破时间减少 73.5%以上。与垂直井相比,必须同时考虑生产率和渗透率,确定延迟水突破时间所需的最小水平井长度。突破时间比取决于建议的最佳生产率比,可以使用开发的相关方法计算,平均误差为 1.73%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Delaying Water Breakthrough Using Horizontal Wells in Khurmala Oilfield
Water coning presents a serious problem in many oil fields, in terms of reducing oil production rate and increasing production costs. As breakthrough time represents the time until coning occurs, it should be increased by studying the significant affecting parameters and proposing a method to control them. Since horizontal wells are known to have higher potentials than vertical wells, they are used worldwide to delay water coning among other purposes. In this study, four designed horizontal wells are proposed to replace a drilled vertical well in Khurmala oilfield in northern Iraq, and the effect of each on water breakthrough time is studied with four different production rates and six different permeability ratios. PERFORM software is used to model the wells, and calculate the expected breakthrough time for each well. It was found that the 1000-ft horizontal well, and longer wells, will delay water breakthrough time, in all cases. Also, higher permeability ratios increase the breakthrough time for longer wells, by up to 15.69 folds, except with the optimum production rate, and increasing production rate results in decreasing breakthrough time (tBT) in all cases, where doubling the production rate may decrease tBT by more than 73.5%. It is essential to determine the minimum horizontal well length required to delay water breakthrough time, compared to the vertical well, by considering both production rate and permeability ratio. The breakthrough time ratio, depending on the proposed to optimum production rate ratio, can be calculated using the developed correlation with an average error of 1.73%.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Iraqi Geological Journal
Iraqi Geological Journal Earth and Planetary Sciences-Geology
CiteScore
1.80
自引率
0.00%
发文量
152
审稿时长
7 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信