{"title":"基于可靠性的排载下预应力梁桥服役期 III 评估","authors":"Bowen Yang, J. Steelman, Jay A. Puckett, D. Linzell","doi":"10.1177/03611981231208200","DOIUrl":null,"url":null,"abstract":"Platooning may benefit heavy truck transportation through fuel savings, reduced congestion, enhanced safety, and lower emissions. In the future, platoons may be able to act as mobile-WIM stations, and their permit process and allowable load limits may differ from unregulated trucks in a convoy. Previous reliability-based studies have focused on the Strength I limit state and have shown that trucks can operate at weights exceeding standard legal load limits even with short headways at operating-level reliability. However, the Service III limit state often governs prestressed concrete bridges. The AASHTO Manual for Bridge Evaluation does not specify a target reliability index (β) nor reliability-based evaluation guidance for the Service III limit state. The work presented here performed reliability analyses to investigate implicit reliability indices (βImplicit) inferred from bridges designed according to current and past AASHTO criteria, as well as cracking probabilities. Design live loads were used to evaluate the Service III limit state for prestressed concrete NU I-girder bridges, optimally designed using LRFD and LFD/allowable stress design (ASD). Various span lengths, numbers, continuity conditions, prestress loss methods, and allowable tension stress levels were considered. Cracking probabilities ranged between 10% and 67%, which indicates that optimally designed bridges may crack during their service life. Although beyond the scope of the study, the present work suggests a reexamination of service behavior and performance is appropriate, using an alternate mechanistic approach to estimate potential cyclic damage and aid life-cycle assessment. Such assessments could provide a more rational framework for platoon operations while maintaining bridge health and safety.","PeriodicalId":309251,"journal":{"name":"Transportation Research Record: Journal of the Transportation Research Board","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-12-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Reliability-Based Service III Evaluation for Prestressed Girder Bridges Under Platoon Loads\",\"authors\":\"Bowen Yang, J. Steelman, Jay A. Puckett, D. Linzell\",\"doi\":\"10.1177/03611981231208200\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Platooning may benefit heavy truck transportation through fuel savings, reduced congestion, enhanced safety, and lower emissions. In the future, platoons may be able to act as mobile-WIM stations, and their permit process and allowable load limits may differ from unregulated trucks in a convoy. Previous reliability-based studies have focused on the Strength I limit state and have shown that trucks can operate at weights exceeding standard legal load limits even with short headways at operating-level reliability. However, the Service III limit state often governs prestressed concrete bridges. The AASHTO Manual for Bridge Evaluation does not specify a target reliability index (β) nor reliability-based evaluation guidance for the Service III limit state. The work presented here performed reliability analyses to investigate implicit reliability indices (βImplicit) inferred from bridges designed according to current and past AASHTO criteria, as well as cracking probabilities. Design live loads were used to evaluate the Service III limit state for prestressed concrete NU I-girder bridges, optimally designed using LRFD and LFD/allowable stress design (ASD). Various span lengths, numbers, continuity conditions, prestress loss methods, and allowable tension stress levels were considered. Cracking probabilities ranged between 10% and 67%, which indicates that optimally designed bridges may crack during their service life. Although beyond the scope of the study, the present work suggests a reexamination of service behavior and performance is appropriate, using an alternate mechanistic approach to estimate potential cyclic damage and aid life-cycle assessment. Such assessments could provide a more rational framework for platoon operations while maintaining bridge health and safety.\",\"PeriodicalId\":309251,\"journal\":{\"name\":\"Transportation Research Record: Journal of the Transportation Research Board\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-12-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Transportation Research Record: Journal of the Transportation Research Board\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1177/03611981231208200\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Transportation Research Record: Journal of the Transportation Research Board","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1177/03611981231208200","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

通过节省燃料、减少拥堵、加强安全和降低排放,排队可能会使重型卡车运输受益。未来,排载可能会成为移动 WIM 站,其许可程序和允许的负载限制可能会与车队中未受管制的卡车不同。以往基于可靠性的研究主要集中在强度 I 极限状态,结果表明,即使在运营级可靠性下,卡车也能以超过标准法定载荷限制的重量运行,甚至在短距离间隔内也是如此。然而,预应力混凝土桥梁通常采用服务 III 极限状态。AASHTO 的《桥梁评估手册》既没有规定目标可靠性指数 (β),也没有为 Service III 极限状态提供基于可靠性的评估指导。本文介绍的工作进行了可靠性分析,以研究根据当前和过去的 AASHTO 标准设计的桥梁推断出的隐含可靠性指数 (βImplicit),以及开裂概率。采用 LRFD 和 LFD/容许应力设计 (ASD) 优化设计的预应力混凝土 NU I 梁桥,其设计活荷载用于评估服务 III 极限状态。考虑了各种跨度、数量、连续性条件、预应力损失方法和允许拉应力水平。开裂概率在 10% 到 67% 之间,这表明经过优化设计的桥梁在使用寿命期间可能会开裂。尽管超出了本研究的范围,但本研究表明,重新审查使用行为和性能是适当的,可以使用另一种机械方法来估算潜在的周期性损坏并帮助进行生命周期评估。此类评估可为排险作业提供更合理的框架,同时维护桥梁的健康和安全。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Reliability-Based Service III Evaluation for Prestressed Girder Bridges Under Platoon Loads
Platooning may benefit heavy truck transportation through fuel savings, reduced congestion, enhanced safety, and lower emissions. In the future, platoons may be able to act as mobile-WIM stations, and their permit process and allowable load limits may differ from unregulated trucks in a convoy. Previous reliability-based studies have focused on the Strength I limit state and have shown that trucks can operate at weights exceeding standard legal load limits even with short headways at operating-level reliability. However, the Service III limit state often governs prestressed concrete bridges. The AASHTO Manual for Bridge Evaluation does not specify a target reliability index (β) nor reliability-based evaluation guidance for the Service III limit state. The work presented here performed reliability analyses to investigate implicit reliability indices (βImplicit) inferred from bridges designed according to current and past AASHTO criteria, as well as cracking probabilities. Design live loads were used to evaluate the Service III limit state for prestressed concrete NU I-girder bridges, optimally designed using LRFD and LFD/allowable stress design (ASD). Various span lengths, numbers, continuity conditions, prestress loss methods, and allowable tension stress levels were considered. Cracking probabilities ranged between 10% and 67%, which indicates that optimally designed bridges may crack during their service life. Although beyond the scope of the study, the present work suggests a reexamination of service behavior and performance is appropriate, using an alternate mechanistic approach to estimate potential cyclic damage and aid life-cycle assessment. Such assessments could provide a more rational framework for platoon operations while maintaining bridge health and safety.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信