精益/IPD 在行动 - MSU 商学院展馆案例研究

Amr Abdel-Azim
{"title":"精益/IPD 在行动 - MSU 商学院展馆案例研究","authors":"Amr Abdel-Azim","doi":"10.7764/ric.00091.21","DOIUrl":null,"url":null,"abstract":"Michigan State University (MSU) is an educational institution that owns one of the largest on-campus housing systems in the US. As part of its operation, MSU is interested in improving the performance of its capital projects. To do so, it has adopted the integrated project delivery (IDP) approach. This article describes some of the key features used by MSU to implement an IPD agreement for building its new MSU Business College Pavilion.As a result, MSU delivered a successful project, both on cost and on time, an outcome that involved the use of several tools, such as an IPD multi-party agreement, the Lean Execution Plan, Target Cost, and A3, among others. The use of IPD maximizes value, leadership, and innovation while using agreements for sharing risks and rewards. This case´s learned lessons for future projects involve the foster of aspects such as value alignment, collaboration, waste reduction, and periodic review of the effectiveness.","PeriodicalId":369360,"journal":{"name":"Revista Ingeniería de Construcción","volume":"12 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-12-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Lean/IPD in action – MSU business college pavilion case study\",\"authors\":\"Amr Abdel-Azim\",\"doi\":\"10.7764/ric.00091.21\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Michigan State University (MSU) is an educational institution that owns one of the largest on-campus housing systems in the US. As part of its operation, MSU is interested in improving the performance of its capital projects. To do so, it has adopted the integrated project delivery (IDP) approach. This article describes some of the key features used by MSU to implement an IPD agreement for building its new MSU Business College Pavilion.As a result, MSU delivered a successful project, both on cost and on time, an outcome that involved the use of several tools, such as an IPD multi-party agreement, the Lean Execution Plan, Target Cost, and A3, among others. The use of IPD maximizes value, leadership, and innovation while using agreements for sharing risks and rewards. This case´s learned lessons for future projects involve the foster of aspects such as value alignment, collaboration, waste reduction, and periodic review of the effectiveness.\",\"PeriodicalId\":369360,\"journal\":{\"name\":\"Revista Ingeniería de Construcción\",\"volume\":\"12 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-12-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Revista Ingeniería de Construcción\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.7764/ric.00091.21\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Revista Ingeniería de Construcción","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.7764/ric.00091.21","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

密歇根州立大学(MSU)是一所教育机构,拥有美国最大的校内住房系统之一。作为其运营的一部分,密歇根州立大学希望提高其基本建设项目的绩效。为此,它采用了综合项目交付 (IDP) 方法。本文介绍了 MSU 在新建 MSU 商学院展馆时实施 IPD 协议的一些主要特点。结果,MSU 在成本和时间上都成功交付了项目,这一成果涉及到多种工具的使用,如 IPD 多方协议、精益执行计划、目标成本和 A3 等。IPD 的使用最大限度地提高了价值、领导力和创新力,同时利用协议来分担风险和分享回报。本案例为今后的项目提供了经验教训,包括促进价值一致性、协作、减少浪费和定期审查成效等方面。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Lean/IPD in action – MSU business college pavilion case study
Michigan State University (MSU) is an educational institution that owns one of the largest on-campus housing systems in the US. As part of its operation, MSU is interested in improving the performance of its capital projects. To do so, it has adopted the integrated project delivery (IDP) approach. This article describes some of the key features used by MSU to implement an IPD agreement for building its new MSU Business College Pavilion.As a result, MSU delivered a successful project, both on cost and on time, an outcome that involved the use of several tools, such as an IPD multi-party agreement, the Lean Execution Plan, Target Cost, and A3, among others. The use of IPD maximizes value, leadership, and innovation while using agreements for sharing risks and rewards. This case´s learned lessons for future projects involve the foster of aspects such as value alignment, collaboration, waste reduction, and periodic review of the effectiveness.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信