确定挖掘过程中在垃圾场前形成的土壤棱柱参数的方法

Valerii Shevchenko, Oleksandra Olieinikova, Vitaliy Ragulin
{"title":"确定挖掘过程中在垃圾场前形成的土壤棱柱参数的方法","authors":"Valerii Shevchenko, Oleksandra Olieinikova, Vitaliy Ragulin","doi":"10.30977/at.2219-8342.2023.53.0.03","DOIUrl":null,"url":null,"abstract":"Problem. The studied dynamic process of digging, taking into account the variable total moving mass of wheeled ZTM equipped with a dump, is not sufficient for the development of recommendations for selecting rational parameters for the performance of such a technological operation. The issue of determining and analyzing the parameters of the variable mass and volume of the material prism moved by the dumper has not been sufficiently investigated. There in no engineering technique that allows you to determine the parameters of the material prism that is gradually forming before dumping. Methodology. The measures are aimed at determining the parameters of the soil prism before the dump in the digging process using analytical dependencies. Results. For the processes of development and analysis of dynamic models of machines with a shovel working body for the stages of digging and transportation of material, it is necessary to take into account its mass in the form of mass attached to the mass of the machine itself. Originality. The obtained dependencies allow to take into account the variable mass of the attached material when performing the analysis of the bulldozer movement in the process of digging the environment being developed. Practical value. The obtained results can be recommended when studying the disciplines of industrial mechanical engineering","PeriodicalId":121866,"journal":{"name":"Automobile transport","volume":" 5","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-12-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The method of determining the parameters of the soil prism formed in front of the dump during digging\",\"authors\":\"Valerii Shevchenko, Oleksandra Olieinikova, Vitaliy Ragulin\",\"doi\":\"10.30977/at.2219-8342.2023.53.0.03\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Problem. The studied dynamic process of digging, taking into account the variable total moving mass of wheeled ZTM equipped with a dump, is not sufficient for the development of recommendations for selecting rational parameters for the performance of such a technological operation. The issue of determining and analyzing the parameters of the variable mass and volume of the material prism moved by the dumper has not been sufficiently investigated. There in no engineering technique that allows you to determine the parameters of the material prism that is gradually forming before dumping. Methodology. The measures are aimed at determining the parameters of the soil prism before the dump in the digging process using analytical dependencies. Results. For the processes of development and analysis of dynamic models of machines with a shovel working body for the stages of digging and transportation of material, it is necessary to take into account its mass in the form of mass attached to the mass of the machine itself. Originality. The obtained dependencies allow to take into account the variable mass of the attached material when performing the analysis of the bulldozer movement in the process of digging the environment being developed. Practical value. The obtained results can be recommended when studying the disciplines of industrial mechanical engineering\",\"PeriodicalId\":121866,\"journal\":{\"name\":\"Automobile transport\",\"volume\":\" 5\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-12-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Automobile transport\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.30977/at.2219-8342.2023.53.0.03\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Automobile transport","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30977/at.2219-8342.2023.53.0.03","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

问题。考虑到装有翻斗的轮式 ZTM 的可变总移动质量,所研究的挖掘动态过程不足以为这种技术操作的性能选择合理参数提出建议。确定和分析翻斗车移动的材料棱柱的可变质量和体积参数的问题尚未得到充分研究。没有一种工程技术可以确定倾倒前逐渐形成的物料棱柱体的参数。方法。这些措施旨在利用分析依赖关系确定挖掘过程中倾倒前土壤棱柱体的参数。结果。在开发和分析带铲子工作机体的机器在挖掘和运输材料阶段的动态模型过程中,有必要考虑其质量,即与机器本身质量相连的质量。独创性。在对正在开发的环境进行挖掘过程中的推土机运动进行分析时,所获得的依赖关系允许将附着材料的可变质量考虑在内。实用价值。在研究工业机械工程学科时,可推荐使用所获得的结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The method of determining the parameters of the soil prism formed in front of the dump during digging
Problem. The studied dynamic process of digging, taking into account the variable total moving mass of wheeled ZTM equipped with a dump, is not sufficient for the development of recommendations for selecting rational parameters for the performance of such a technological operation. The issue of determining and analyzing the parameters of the variable mass and volume of the material prism moved by the dumper has not been sufficiently investigated. There in no engineering technique that allows you to determine the parameters of the material prism that is gradually forming before dumping. Methodology. The measures are aimed at determining the parameters of the soil prism before the dump in the digging process using analytical dependencies. Results. For the processes of development and analysis of dynamic models of machines with a shovel working body for the stages of digging and transportation of material, it is necessary to take into account its mass in the form of mass attached to the mass of the machine itself. Originality. The obtained dependencies allow to take into account the variable mass of the attached material when performing the analysis of the bulldozer movement in the process of digging the environment being developed. Practical value. The obtained results can be recommended when studying the disciplines of industrial mechanical engineering
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信