{"title":"模拟生产线上的操作,作为提高生产过程效率的工具","authors":"J. Saderova, Lubomir Ambrisko","doi":"10.22306/al.v10i4.432","DOIUrl":null,"url":null,"abstract":"For a company to make a profit and satisfy customers' needs, it must have the correct individual processes - the production process is one of the most important. This paper proposes a solution to eliminate the problem based on identifying the cause of the blocking - idle times in several workplaces of the production line. Another goal was to determine whether increasing productivity and the number of products on the given line is possible. At the beginning of the research, a system analysis of production operations was carried out. A simulation was chosen as a tool for solving the goals. Tecnomatix Plant Simulation creates the simulation model. The model was verified by a simulation experiment that simulated the current state, and the data obtained by the analysis were used. The experiment was performed for three simulated times: 8, 16 and 48 hours. After the verification of the model, experiments were performed on the models. The paper presents the results of three experiments for a simulated time of 48 hours. Based on the experiments, it was found that in the case of shortening the work cycle at critical workplaces No.5 and No.15, it is possible to make the process more efficient - to equalise the workload of individual workplaces and increase production by 25%.","PeriodicalId":36880,"journal":{"name":"Acta Logistica","volume":"76 3","pages":""},"PeriodicalIF":0.8000,"publicationDate":"2023-12-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Simulation of operations on the production line as a tool for making the production process more efficient\",\"authors\":\"J. Saderova, Lubomir Ambrisko\",\"doi\":\"10.22306/al.v10i4.432\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"For a company to make a profit and satisfy customers' needs, it must have the correct individual processes - the production process is one of the most important. This paper proposes a solution to eliminate the problem based on identifying the cause of the blocking - idle times in several workplaces of the production line. Another goal was to determine whether increasing productivity and the number of products on the given line is possible. At the beginning of the research, a system analysis of production operations was carried out. A simulation was chosen as a tool for solving the goals. Tecnomatix Plant Simulation creates the simulation model. The model was verified by a simulation experiment that simulated the current state, and the data obtained by the analysis were used. The experiment was performed for three simulated times: 8, 16 and 48 hours. After the verification of the model, experiments were performed on the models. The paper presents the results of three experiments for a simulated time of 48 hours. Based on the experiments, it was found that in the case of shortening the work cycle at critical workplaces No.5 and No.15, it is possible to make the process more efficient - to equalise the workload of individual workplaces and increase production by 25%.\",\"PeriodicalId\":36880,\"journal\":{\"name\":\"Acta Logistica\",\"volume\":\"76 3\",\"pages\":\"\"},\"PeriodicalIF\":0.8000,\"publicationDate\":\"2023-12-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Acta Logistica\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.22306/al.v10i4.432\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, INDUSTRIAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Acta Logistica","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.22306/al.v10i4.432","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 0

摘要

公司要想盈利并满足客户需求,就必须有正确的单个流程,生产流程就是其中最重要的一个。本文在确定堵塞原因--生产线上多个工作场所的空闲时间--的基础上,提出了消除问题的解决方案。另一个目标是确定是否有可能提高特定生产线的生产率和产品数量。研究开始时,对生产操作进行了系统分析。模拟被选为实现目标的工具。Tecnomatix 工厂仿真创建了仿真模型。通过模拟当前状态的仿真实验对模型进行验证,并使用分析获得的数据。实验进行了三次模拟:8、16 和 48 小时。模型验证后,对模型进行了实验。本文介绍了模拟时间为 48 小时的三次实验结果。根据实验发现,在缩短 5 号和 15 号关键工作场所的工作周期的情况下,有可能提高工序的效率--均衡各个工作场所的工作量,并将产量提高 25%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Simulation of operations on the production line as a tool for making the production process more efficient
For a company to make a profit and satisfy customers' needs, it must have the correct individual processes - the production process is one of the most important. This paper proposes a solution to eliminate the problem based on identifying the cause of the blocking - idle times in several workplaces of the production line. Another goal was to determine whether increasing productivity and the number of products on the given line is possible. At the beginning of the research, a system analysis of production operations was carried out. A simulation was chosen as a tool for solving the goals. Tecnomatix Plant Simulation creates the simulation model. The model was verified by a simulation experiment that simulated the current state, and the data obtained by the analysis were used. The experiment was performed for three simulated times: 8, 16 and 48 hours. After the verification of the model, experiments were performed on the models. The paper presents the results of three experiments for a simulated time of 48 hours. Based on the experiments, it was found that in the case of shortening the work cycle at critical workplaces No.5 and No.15, it is possible to make the process more efficient - to equalise the workload of individual workplaces and increase production by 25%.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Acta Logistica
Acta Logistica Engineering-Industrial and Manufacturing Engineering
CiteScore
1.80
自引率
28.60%
发文量
36
审稿时长
4 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信