利用源-网-荷协作消耗风能的需求响应管理稳健优化模型

IF 1.9 Q4 ENERGY & FUELS
Xiangfeng Zhou , Chunyuan Cai , Yongjian Li , Jiekang Wu , Yaoguo Zhan , Yehua Sun
{"title":"利用源-网-荷协作消耗风能的需求响应管理稳健优化模型","authors":"Xiangfeng Zhou ,&nbsp;Chunyuan Cai ,&nbsp;Yongjian Li ,&nbsp;Jiekang Wu ,&nbsp;Yaoguo Zhan ,&nbsp;Yehua Sun","doi":"10.1016/j.gloei.2023.11.007","DOIUrl":null,"url":null,"abstract":"<div><p>To accommodate wind power as safely as possible and deal with the uncertainties of the output power of wind- driven generators, a min-max-min two-stage robust optimization model is presented, considering the unit commitment, source-network load collaboration, and control of the load demand response. After the constraint functions are linearized, the original problem is decomposed into the main problem and subproblem as a matrix using the strong dual method. The minimum-maximum of the original problem was continuously maximized using the iterative method, and the optimal solution was finally obtained. The constraint conditions expressed by the matrix may reduce the calculation time, and the upper and lower boundaries of the original problem may rapidly converge. The results of the example show that the injected nodes of the wind farms in the power grid should be selected appropriately; otherwise, it is easy to cause excessive accommodation of wind power at some nodes, leading to a surge in reserve costs and the load demand response is continuously optimized to reduce the inverse peak regulation characteristics of wind power. Thus, the most economical optimization scheme for the worst scenario of the output power of the generators is obtained, which proves the economy and reliability of the two-stage robust optimization method.</p></div>","PeriodicalId":36174,"journal":{"name":"Global Energy Interconnection","volume":"6 6","pages":"Pages 738-750"},"PeriodicalIF":1.9000,"publicationDate":"2023-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://www.sciencedirect.com/science/article/pii/S2096511723000981/pdf?md5=6eee09a2dce73fbc2e54e52d1f4f20b4&pid=1-s2.0-S2096511723000981-main.pdf","citationCount":"0","resultStr":"{\"title\":\"A robust optimization model for demand response management with source-grid-load collaboration to consume wind-power\",\"authors\":\"Xiangfeng Zhou ,&nbsp;Chunyuan Cai ,&nbsp;Yongjian Li ,&nbsp;Jiekang Wu ,&nbsp;Yaoguo Zhan ,&nbsp;Yehua Sun\",\"doi\":\"10.1016/j.gloei.2023.11.007\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>To accommodate wind power as safely as possible and deal with the uncertainties of the output power of wind- driven generators, a min-max-min two-stage robust optimization model is presented, considering the unit commitment, source-network load collaboration, and control of the load demand response. After the constraint functions are linearized, the original problem is decomposed into the main problem and subproblem as a matrix using the strong dual method. The minimum-maximum of the original problem was continuously maximized using the iterative method, and the optimal solution was finally obtained. The constraint conditions expressed by the matrix may reduce the calculation time, and the upper and lower boundaries of the original problem may rapidly converge. The results of the example show that the injected nodes of the wind farms in the power grid should be selected appropriately; otherwise, it is easy to cause excessive accommodation of wind power at some nodes, leading to a surge in reserve costs and the load demand response is continuously optimized to reduce the inverse peak regulation characteristics of wind power. Thus, the most economical optimization scheme for the worst scenario of the output power of the generators is obtained, which proves the economy and reliability of the two-stage robust optimization method.</p></div>\",\"PeriodicalId\":36174,\"journal\":{\"name\":\"Global Energy Interconnection\",\"volume\":\"6 6\",\"pages\":\"Pages 738-750\"},\"PeriodicalIF\":1.9000,\"publicationDate\":\"2023-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://www.sciencedirect.com/science/article/pii/S2096511723000981/pdf?md5=6eee09a2dce73fbc2e54e52d1f4f20b4&pid=1-s2.0-S2096511723000981-main.pdf\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Global Energy Interconnection\",\"FirstCategoryId\":\"1087\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S2096511723000981\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENERGY & FUELS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Global Energy Interconnection","FirstCategoryId":"1087","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S2096511723000981","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENERGY & FUELS","Score":null,"Total":0}
引用次数: 0

摘要

为了尽可能安全地适应风力发电,并处理风力发电机输出功率的不确定性,本文提出了一个最小-最大-最小两阶段鲁棒优化模型,考虑了机组承诺、源网负荷协作和负荷需求响应控制。在对约束函数进行线性化处理后,利用强对偶法将原问题分解为主问题和子问题矩阵。利用迭代法不断求原问题的最小值-最大值,最终得到最优解。矩阵表示的约束条件可以减少计算时间,原问题的上下限可以快速收敛。实例结果表明,应合理选择风电场在电网中的注入节点,否则容易造成部分节点对风电的过度接纳,导致储备成本激增,并不断优化负荷需求响应,降低风电的逆调峰特性。因此,得到了发电机输出功率最坏情况下最经济的优化方案,证明了两阶段鲁棒优化方法的经济性和可靠性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A robust optimization model for demand response management with source-grid-load collaboration to consume wind-power

To accommodate wind power as safely as possible and deal with the uncertainties of the output power of wind- driven generators, a min-max-min two-stage robust optimization model is presented, considering the unit commitment, source-network load collaboration, and control of the load demand response. After the constraint functions are linearized, the original problem is decomposed into the main problem and subproblem as a matrix using the strong dual method. The minimum-maximum of the original problem was continuously maximized using the iterative method, and the optimal solution was finally obtained. The constraint conditions expressed by the matrix may reduce the calculation time, and the upper and lower boundaries of the original problem may rapidly converge. The results of the example show that the injected nodes of the wind farms in the power grid should be selected appropriately; otherwise, it is easy to cause excessive accommodation of wind power at some nodes, leading to a surge in reserve costs and the load demand response is continuously optimized to reduce the inverse peak regulation characteristics of wind power. Thus, the most economical optimization scheme for the worst scenario of the output power of the generators is obtained, which proves the economy and reliability of the two-stage robust optimization method.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Global Energy Interconnection
Global Energy Interconnection Engineering-Automotive Engineering
CiteScore
5.70
自引率
0.00%
发文量
985
审稿时长
15 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信